REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf

上传人:fatcommittee260 文档编号:1018927 上传时间:2019-03-21 格式:PDF 页数:3 大小:15.06KB
下载 相关 举报
REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1288-2002 Lessons Learned Cost schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundancy.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1288Lesson Info:a71 Lesson Number: 1288a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ M. SumichSubject: Cost/schedule Optimization and Risk Reduction by Developing Two Independent Fully Functional Flight Vehicles with Limited Redundanc

2、y Description of Driving Event: In order to minimize cost and schedule, the project, after a trade-off analysis, decided to build two fully functional test vehicles as opposed to one with built in redundancy (note: those items deemed critical to safe operation were redundant). The test vehicles were

3、 of identical design but manufactured in sequence. Thus, while test vehicle number one was being flight tested, test vehicle number two was being built. The primary drivers for this approach were that the test vehicle was to be unmanned, have an emergency recovery parachute, and be operated in a ver

4、y controlled and unpopulated area. The risk of losing one vehicle was minimized by the imposition of these stringent test flight constraints. While it was the projects intention to complete the second vehicle as if it were the first and only, its main purpose was for risk reduction (the projects suc

5、cess meant vehicle number two was tested through ground taxi only). The second vehicle was also viewed as a source of parts for vehicle number one.Lesson(s) Learned: The approach to risk reduction mentioned above is credited with contributing significantly to the projects success, specifically:a71 H

6、aving two complete systems allowed the project to take an aggressive approach with respect to ground tests and flight envelope expansion.a71 Upper management approval and support was increased and maintained.a71 Lessons learned from developing vehicle number one could be applied to number two.a71 Th

7、e overall project milestones could be protected/met by using vehicle number two for spare parts.a71 The decrease in individual vehicle complexity over that of one with built in redundancy Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-decreased main

8、tenance requirements. Additionally, the approach mentioned above introduced several concerns:a71 Producing two complete systems spread the workforce very thinly, especially when resources between the two efforts were shared and/or had overlapping schedules.a71 Project management in general has a ten

9、dency to place all the best people on the team dedicated to the primary vehicle, such that the team working on the secondary vehicle suffers from inexperience and does not have the luxury of adequate mentoring/traininga71 The focus on vehicle number one, especially after it entered the flight testin

10、g phase, at times caused a loss of commitment to vehicle number two and jeopardized its schedule.a71 Risk management and safety efforts must always be supported and incorporated into project planning and should not be de-emphasized because there is a complete backup system. Recommendation(s): When u

11、sing unmanned flight vehicles in remote unpopulated areas, consider using a cost/schedule optimization and risk reduction approach based on developing two fully functional test vehicles instead of one with extensive sub-system redundancy. This approach should be accompanied with a dedicated effort t

12、o treat each vehicle as if it were unique and required to serve at any given time. Thus, the secondary vehicle should only be used as a resource to support vehicle number one after other risk mitigation strategies have failed. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Les

13、son: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Configuration ManagementProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Flight Equipmenta71 Flight Operationsa71 Risk Management/AssessmentAdditional Info: Approval Info: a71 Approval Date: 2002-10-09a71 Approval Name: Anthony Bricenoa71 Approval Organization: ARCa71 Approval Phone Number: 650-605-1012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 15168-2007 Surface active agents - Determination of hydroxyl value - p-Toluensulfonyl isocyanate (TSI) method and potentiometric titration with tetrabutylammonium hydroxide .pdf DIN EN 15168-2007 Surface active agents - Determination of hydroxyl value - p-Toluensulfonyl isocyanate (TSI) method and potentiometric titration with tetrabutylammonium hydroxide .pdf
  • DIN EN 15169-2007 Characterization of waste - Determination of loss on ignition in waste sludge and sediments English version of DIN EN 15169 2007-05《废弃物特性 测定废弃物、淤泥和沉淀物的点燃质量损耗》.pdf DIN EN 15169-2007 Characterization of waste - Determination of loss on ignition in waste sludge and sediments English version of DIN EN 15169 2007-05《废弃物特性 测定废弃物、淤泥和沉淀物的点燃质量损耗》.pdf
  • DIN EN 1517-2001 Surfaces for sports areas - Determination of resistance of impact German version EN 1517 1999《运动场地面 耐冲击性测定》.pdf DIN EN 1517-2001 Surfaces for sports areas - Determination of resistance of impact German version EN 1517 1999《运动场地面 耐冲击性测定》.pdf
  • DIN EN 15170-2009 Characterization of sludges - Determination of calorific value English version of DIN EN 15170 2009-05《淤泥特性 生热值的测定》.pdf DIN EN 15170-2009 Characterization of sludges - Determination of calorific value English version of DIN EN 15170 2009-05《淤泥特性 生热值的测定》.pdf
  • DIN EN 15178-2007 Elements for the identification of products in emergency enquiries German version EN 15178 2007《急救产品的识别要素》.pdf DIN EN 15178-2007 Elements for the identification of products in emergency enquiries German version EN 15178 2007《急救产品的识别要素》.pdf
  • DIN EN 15179-2010 Railway applications - Braking - Requirements for the brake system of coaches German version EN 15179 2007《轨道交通 制动系 机动车制动系统要求 德文版本EN 15179-2007》.pdf DIN EN 15179-2010 Railway applications - Braking - Requirements for the brake system of coaches German version EN 15179 2007《轨道交通 制动系 机动车制动系统要求 德文版本EN 15179-2007》.pdf
  • DIN EN 1518-1998 Non-destructive testing - Leak testing - Characterization of mass spectrometer leak detectors German version EN 1518 1998《无损检验 泄漏检验 质普分析泄漏检测器的特性表述》.pdf DIN EN 1518-1998 Non-destructive testing - Leak testing - Characterization of mass spectrometer leak detectors German version EN 1518 1998《无损检验 泄漏检验 质普分析泄漏检测器的特性表述》.pdf
  • DIN EN 15180-2015 Food processing machinery - Food depositors - Safety and hygiene requirements German version EN 15180 2014《食品加工机械 食物存储 安全和卫生要求 德文版本EN 15180-2014》.pdf DIN EN 15180-2015 Food processing machinery - Food depositors - Safety and hygiene requirements German version EN 15180 2014《食品加工机械 食物存储 安全和卫生要求 德文版本EN 15180-2014》.pdf
  • DIN EN 15181-2017 Measuring method of the energy consumption of gas fired ovens German version EN 15181 2017 with CD-ROM《燃气炉具的能源消耗测量方式 德文版本EN 15181-2017》.pdf DIN EN 15181-2017 Measuring method of the energy consumption of gas fired ovens German version EN 15181 2017 with CD-ROM《燃气炉具的能源消耗测量方式 德文版本EN 15181-2017》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1