1、_ SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising there
2、from, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions. Copyright 2013 SAE International All rights reserved. No part of this p
3、ublication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-497
4、0 (outside USA) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.org SAE values your input. To provide feedback on this Technical Report, please visit http:/www.sae.org/technical/standards/J2519_201303 SURFACE VEHICLE STANDARD J2519 MAR2013 Issued 2002-06 Revised 2013-0
5、3 Superseding J2519 AUG2007 Guidelines and Procedures for Directional Drilling Tracking Operators RATIONALE Add reference to 811 in 3.1.1.1 and 3.1.1.2, added 3.1.1.5 for white lining, added section 3.2 for precautions during drilling. 1. SCOPE These general guidelines and precautions apply to perso
6、nnel operating directional drilling tracking equipment when used with Horizontal Earthboring Machines as defined in SAE J2022. 1.1 Purpose The purpose of this document is to provide manufacturers with an established set of guidelines and precautions to improve the degree of personal safety for jobsi
7、te personnel and people in the area. 2. REFERENCE 2.1 Applicable Publication The following publication(s) form part of this document to the extent specified herein. Unless otherwise indicated, the latest issue of SAE publications shall apply. 2.1.1 SAE Publication Available from SAE International, 4
8、00 Commonwealth Drive, Warrendale, PA 15096-0001, Tel: 877-606-7323 (inside USA and Canada) or 724-776-4970 (outside USA), www.sae.org. SAE J2022 Classification, Nomenclature, and Specification Definitions for Horizontal Earthboring Machines SAE J2519 Revised MAR2013 Page 2 of 4 3. OPERATING GUIDELI
9、NES 3.1 Before drilling, check that the following precautions have been taken: 3.1.1 Confirm that: 3.1.1.1 811 or One-Call has been contacted and a minimum wait time has elapsed. 3.1.1.2 Any utilities that do not subscribe to 811 or One-Call have been contacted. 3.1.1.3 All known utilities have been
10、 marked and that the site is ready for drilling. 3.1.1.4 All required permits, such as road crossing, have been obtained. 3.1.1.5 Planned bore has been indicated by white-lining. 3.1.2 All personnel (contractor and trainer) are wearing proper personal protective equipment. 3.1.2.1 Personal protectiv
11、e equipment, shall include but is not limited to, the following: - Properly rated, rubber-insulating foot wear - Safety glasses or safety goggles - Hard hat - Highvisibility warning vest 3.1.3 All utilities to be crossed and approached have been exposed (by pot-holing or other hand excavation method
12、s) and clearance shall be observed while drilling and back reaming past the utility. 3.1.3.1 Precautions shall be taken when drilling parallel to buried utilities, including more frequent exposure of the utility and the drill head and more frequent tracker readings, to ensure the necessary clearance
13、 is maintained between the utility and the bore path. 3.1.4 Planned work conforms to all regulatory requirements (Occupational Safety and Health Administration, state, municipal etc.) applicable to the job. 3.1.5 If working in the vicinity of a gas line, crew has been advised not to smoke during ope
14、rations and in the vicinity of exit or exposure pits. 3.1.6 Two-way communication has been established between you and drill unit operator. 3.2 During drilling, check that the following precautions are being taken: 3.2.1 Do not stand on ground over drill string unless drilling has stopped. 3.2.2 Alw
15、ays track drilling progress. Never assume drill string is following a pre-drilled path. 3.2.3 Locate drill head after each joint of pipe if possible. 3.2.4 Never push broken pipe. 3.2.5 When drill head surfaces, use a lock out control or manual means such as removal of machine ignition key to disabl
16、e thrust and rotation for breaking joints and/or changing tools at exit pit. 3.2.6 Stay clear from material being installed. SAE J2519 Revised MAR2013 Page 3 of 4 3.2.7 Never use a pipe wrench to break or tighten joints of pipe or downhole tools. 4. ELECTROMAGNETIC INTERFERENCE PRECAUTIONS 4.1 Direc
17、tional drilling tracking receivers typically detect electromagnetic signals for tracking the drill head. These signals are subject to disturbances or interference from many sources. When interference is encountered, incorrect tracking receiver readings are possible, including, but not limited to, im
18、proper depth readings and erratic clock readings when the drill head is still. 4.2 You should not rely only on depth readings, but factor in the following: ground conditions, drill pipe movement, drill head pitch, unexpected indications, and information from the drill unit operator. 4.3 The operator
19、 shall be aware of the following: 4.3.1 Work site features which indicate possible sources of electromagnetic interference. 4.3.2 Large metal objects underground or in a close proximity to the receiver. 4.3.3 Underground metallic (steel or cast iron) pipes in the vicinity of the bore path. 4.3.4 Rei
20、nforced concrete roads, sidewalks, driveways or pipes. 4.3.5 Traffic signal loops. 4.3.6 Microwave and radar towers. 4.3.7 Electronic fences for dogs, or transmitters emitting signals at or near the same frequency as locating equipment. 4.3.8 Salt water or brackish water. 4.3.9 Other tracking or loc
21、ating devices being used nearby. 4.3.10 Tracking equipment capacities and specifics. 4.3.10.1 Know the frequency of the tracking equipment to be used. 4.3.10.2 Be able to recognize unstable or inconsistent information. 4.3.10.3 Walk the bore-path with a tracking receiver turned “ON”, but with transm
22、itter turned “OFF” to note any signal changes. 4.3.10.4 Cross check depth readings with pitch information. 4.3.10.5 Know the limitations of the tracking equipment to be used. 5. EMERGENCY OPERATING PROCEDURES 5.1 Procedure in Event of Electrical Strike 5.1.1 Stay where you are. Do not move. 5.1.2 Wa
23、rn persons nearby that a strike has occurred and to stay away. 5.1.3 Have someone contact 911 or local emergency number and the electric utility. 5.1.4 Remind the drill unit operator to retract the drill head and attempt to break contact with the electric line. SAE J2519 Revised MAR2013 Page 4 of 4
24、5.2 Procedure in Event of a Gas Line Strike 5.2.1 Inform operator to stop drilling, shut down all engines and leave the area. (Do not reverse or retract the tool head to break contact). 5.2.2 Alert persons nearby that a gas strike has occurred and to stay away. 5.2.3 Leave the area of the gas leak i
25、mmediately and quickly. 5.2.4 Clear and secure the area. 5.2.5 Have someone contact 911 or local emergency number and the gas utility. 5.2.6 Do not smoke or cause sparks. 5.2.7 Do not resume drilling until given permission by the gas utility. 5.3 Procedure in Event of Fiber Optic Strike 5.3.1 Do not
26、 look into the cut ends of fiber optic or unidentified cables (vision damage can occur). 5.3.2 Have someone contact 911 or local emergency number and the appropriate utility. 5.4 Procedure in Event of Water or Sewer Strike 5.4.1 Do not reverse or retract the tool head. 5.4.2 Have someone contact 911
27、 or local emergency number and the appropriate authority. 6. NOTES 6.1 Marginal Indicia A change bar (l) located in the left margin is for the convenience of the user in locating areas where technical revisions, not editorial changes, have been made to the previous issue of this document. An (R) sym
28、bol to the left of the document title indicates a complete revision of the document, including technical revisions. Change bars and (R) are not used in original publications, nor in documents that contain editorial changes only. PREPARED BY THE SAE MTC9, TRENCHING AND HORIZONTAL EARTHBORING MACHINES COMMITTEE