IEEE NESCIR576-2014 en National Electrical Safety Code《国家电气安全规范》.pdf

上传人:amazingpat195 文档编号:1249376 上传时间:2019-09-02 格式:PDF 页数:2 大小:148.44KB
下载 相关 举报
IEEE NESCIR576-2014 en National Electrical Safety Code《国家电气安全规范》.pdf_第1页
第1页 / 共2页
IEEE NESCIR576-2014 en National Electrical Safety Code《国家电气安全规范》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 1 Copyright 2014 IEEE. All rights reserved. Interpretation Section 23. Clearances Rule 235C1b Clearance for wires, conductors, or cables carried on the same supporting structureVertical clearance between conductors at the supportBasic clearance for conductors of same or different circuitsBetween su

2、pply lines and communication lines (2012 Edition, pp. 145-148) (9 September 2014) IR576 Question: Do the clearances listed in Table 235-5 for vertical clearance between communication and supply circuits at the support extend to situations in which supply conductors are run below communication conduc

3、tors and do not meet the requirements of Note ? Discussion: Rule 239G1 creates confusion as to what the vertical clearance between communication and supply circuits at the support should be when supply conductors are run below communication conductors and do not meet the requirements of Note . The p

4、ortion of Rule 239G1 that requires guarding of vertical supply conductors from 40 in above the highest communication line does align with the 40 in required by Table 235-5. However, the portion of 239G1 that requires guarding of vertical supply conductors to 6 ft below the lowest communication attac

5、hment creates confusion as to what the vertical clearance at the support between supply conductors run below communication conductors should be. Rule 239G1 suggests that the vertical clearance at the support between supply conductors run below and communication conductors should be 6 ft, while Table

6、 235-5 suggests that when the requirements of Note are not met, the clearance should be 40 in. This question specifically relates to trolley conductors which by Rule 220B1 EXCEPTION may be run below communication conductors. Interpretation The simple answer to your question is “yes.” Rule 235C appli

7、es to vertical clearances between conductors and cables located at different levels on the same support. Table 235-5 specifies the required clearance between the attachment points. Note that Rule 235C, Table 235-5 does not apply to vertical runs of conductors or cables attached to the same supportin

8、g structure. 2 Copyright 2014 IEEE. All rights reserved. Conversely, Rule 239G applies to vertical runs of supply conductors and cables passing through the communication space of jointly-used structures. Rule 239G1 specifies requirements for guarding such construction that is attached to the structu

9、re. Note that Rule 239G does not apply to vertical clearance between communication and supply circuits. The guarding requirements of Rule 239G1 are intended to limit the likelihood of communication workers: Gaffing a supply cable attached to the structure. Being exposed to an energized supply cable.

10、 See also: Rule 239G3 that is specific regarding protection near trolley attachments. Table 238-2 for vertical clearance requirements between trolley and communication construction. _ National Electrical Safety Code and NESC are both registered trademarks and service marks of the Institute of Electrical and Electronics Engineers, Inc. The NESC is available from the Institute of Electrical and Electronics Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854, USA (http:/standards.ieee.org/)

展开阅读全文
相关资源
  • IEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdfIEC TS 62492-1-2008 Industrial process control devices - Radiation thermometers - Part 1 Technical data for radiation thermometers《工业过程控制装置 辐射温度计 第1部分 辐射温度计的技术数.pdf
  • IEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdfIEC TR2 61464-1998 Insulated bushings - Guide for the interpretation of dissolved gas analysis (DGA) in bushings where oil is the impregnating medium of the mai.pdf
  • IEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdfIEC TR 61241-2-2-1993 Electrical apparatus for use in the presence of combustible dust part 2 test methods section 2 method for determining the electrical resis.pdf
  • IEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdfIEC TR 60972-1989 Classification and interpretation of new lighting products《新型照明产品的分类和说明》.pdf
  • IEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdfIEC TR 60943 Edition 21-2009 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals《特殊终端中电气设备部件用关于允许.pdf
  • IEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdfIEC TR 60943 AMD 1-2008 Guidance concerning the permissible temperature rise for parts of electrical equipment in particular for terminals Amendment 1《电气设备部件(特别.pdf
  • IEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdfIEC TR 60919-2-2008 Performance of high-voltage direct current (HVDC) systems with line-communicated converters - Part 2 Faults and switching《带线性通信转换器的高压直流(HVDC.pdf
  • IEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdfIEC TR 60870-6-505 Edition 11-2006 Telecontrol equipment and systems - Part.6-505 Telecontrol protocols compatible with ISO standards and ITU-T recommendations .pdf
  • IEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdfIEC TR 60344 CORR1-2012 Calculation of d c resistance of plain and coated copper conductors of low-frequency cables and wires - Application guide Corrigendum 1《.pdf
  • IEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdfIEC 62560 CORR1-2012 Self-ballasted LED-lamps for general lighting services by voltage 50 V - Safety specifications Corrigendum 1《普通照明用50 V以上自镇流LED灯 安全要求 勘误表1》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > IEC

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1