ISO 11961 CORR 1-2009 Petroleum and natural gas industries - Steel drill pipe Technical Corrigendum 1《石油和天然气工业 钢制钻探管 技术勘误1》.pdf

上传人:postpastor181 文档编号:1250368 上传时间:2019-09-02 格式:PDF 页数:2 大小:255.50KB
下载 相关 举报
ISO 11961 CORR 1-2009 Petroleum and natural gas industries - Steel drill pipe Technical Corrigendum 1《石油和天然气工业 钢制钻探管 技术勘误1》.pdf_第1页
第1页 / 共2页
ISO 11961 CORR 1-2009 Petroleum and natural gas industries - Steel drill pipe Technical Corrigendum 1《石油和天然气工业 钢制钻探管 技术勘误1》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、ICS 75.180.10; 77.140.75 Ref. No. ISO 11961:2008/Cor.1:2009(E) ISO 2009 All rights reserved Published in Switzerland INTERNATIONAL STANDARD ISO 11961:2008 TECHNICAL CORRIGENDUM 1 Published 2009-03-01 INTERNATIONAL ORGANIZATION FOR STANDARDIZATION ORGANISATION INTERNATIONALE DE NORMALISATIONPetroleum

2、 and natural gas industries Steel drill pipe TECHNICAL CORRIGENDUM 1 Industries du ptrole et du gaz naturel Tiges de forage en acier RECTIFICATIF TECHNIQUE 1 Technical Corrigendum 1 to ISO 11961:2008 was prepared by Technical Committee ISO/TC 67, Materials, equipment and offshore structures for petr

3、oleum, petrochemical and natural gas industries, Subcommittee SC 5, Casing, tubing and drill pipe. Page 69 Replace Figure B.1 with the following figure, in which the line “L” in subfigure b) has been shortened such that it does not extend below the lower shoulder of the tool-joint pin and the arrows

4、 designating d pand d tehave been modified. ISO 11961:2008/Cor.1:2009(E) 2 ISO 2009 All rights reserveda) b) Key 1 tool-joint box 7 pipe body 2 hard banding (optional) 8 friction weld 3 tapered elevator shoulder 9 pin taper 4 drill-pipe weld neck 10 tool-joint pin 5 drill-pipe-body upset 11 rotary shouldered connection 6 drill-pipe-body NOTE See Tables A.1, A.2 or A.3 or Tables C.1, C.2 or C.3 and 6.2 for dimensional requirements. Figure B.1 Drill pipe

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1