1、Cementing Shallow-water Flow Zones in Deepwater WellsAPI RECOMMENDED PRACTICE 65-1 SECOND EDITION, JUNE 2018Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and federal laws and regulations should be reviewed.Neit
2、her API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, or assume any liability or responsibility for
3、any use, or the results of such use, of any information or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.API publications may be used
4、by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and hereby expressly disclaims any liability or re
5、sponsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict.API publications are published to facilitate the broad availability of proven, sound engineering and operating practices. These publications are
6、 not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment
7、 or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such products do in fact conform to the applicable API standard.All rights reser
8、ved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, W
9、ashington, DC 20005.Copyright 2018 American Petroleum InstituteForewordThis document was prepared with input from oil and gas operators, drilling contractors, service companies, consultants, and regulators. It is based mainly on experiences in the United States outer continental shelf (OCS) and deep
10、water operating areas of the Gulf of Mexico, but may be of utility in other offshore areas. The content of this document is not all-inclusive and not intended to alleviate the need for detailed information found in textbooks, manuals, technical papers, or other documents. The formulation, adoption,
11、and publication of API standards are not intended to inhibit anyone from using any other practices. The verbal forms used to express the provisions in this recommended practice are as follows: the term “shall” denotes a minimum requirement in order to conform to the standard; the term “should” denot
12、es a recommendation or that which is advised but not required in order to conform to the standard; the term “may” is used to express permission or a provision that is optional; the term “can” is used to express possibility or capability.Informative elements: As used in a standard, “informative” deno
13、tes elements that identify the document; introduce its content and explain its background, development, and its relationship with other documents; or provide additional information intended to assist the understanding or use of the document.Normative elements: As used in a standard, “normative” deno
14、tes elements that describe the scope of the document, and which set out provisions that are required to implement the standard. Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus,
15、or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent.This document was produced under API standardization procedures that ensure appropriate notification and participation in th
16、e developmental process and is designated as an API standard. Questions concerning the interpretation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American
17、 Petroleum Institute, 1220 L Street, NW, Washington, DC 20005. Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five y
18、ears. A one-time extension of up to two years may be added to this review cycle. Status of the publication can be ascertained from the API Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is published annually by API, 1220 L Street, NW, Washington, DC 20005
19、.Suggested revisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW, Washington, DC 20005, standardsapi.org.iiiContentsPage1 Scope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20、 . . . . . . . . . . . . 11.1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21、. . . . . . . . . . . . . . . . . . . . . . . . . 11.3 Conditions of Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.4 Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.5 Challenges for Controlling SWF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.6 Summary of Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23、 . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Normative References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Terms, Definitions, Acronyms, and Abbreviations . . . . . . . . . . . . . . . . . . . . . . .
24、. . . . . . . . . . . . . . . . . 43.1 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43.2 Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
25、 . . . . . . . . . . . . . . . . 74 Drilling Practices to Reduce the Risk of Shallow-water Flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
26、 . . . . . . . . . . 84.2 Well Spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94.3 Hole Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27、. . . . . . . . . . . . . . . . . . . 94.4 Hole Enlargement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94.5 Hole Size Optimization. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
28、. . . . . . . . . . . . . . . . . . . . . . . 94.6 Hole Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.7 Use of Pilot Holes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
29、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.8 Full Diameter Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.9 Lost Circulation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.10 Flow Detection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114.11 Rate of Penetration. . . . . . . . . . . . . . . . . . . . . . .
31、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114.12 Drilling Fluids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114.13 Detecting and Characterizing SWF Zones . . . .
32、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125 Flow Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136 Operational Considerations. . . . . . . . . . . . . . .
33、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136.1 Wellbore Preparations Prior to Tripping Out of the Hole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136.2 Casing and Casing Hardware . . . . . . . . . . . . . . . . . . . . . . . . .
34、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146.3 Wellbore Conditioning with Casing on Bottom. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146.4 Inner-string Cementing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
35、. . . . . . . . . . . . . . . . . . . . . . . 156.5 Conventional Cementing using Sub-sea Release Plug Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . 167 Job Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36、 . . . . . . . . . . . 167.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167.2 Pore Pressure/Frac Gradient. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
37、 . . . . . . . . . . . . . . . . 167.3 Determination of Temperature Schedules for Conditioning and Testing. . . . . . . . . . . . . . . . . . . . . 167.4 Drilling Fluid Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
38、 177.5 Centralization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177.6 Engineering Software. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
39、. . . . . . 177.7 Foamed Cement Modeling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187.8 Cement Volumes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40、. . . . . . 198 Cement Slurry Design and Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 198.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
41、 . . . . . . . 198.2 Cement Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 208.3 Cement Compositions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
42、 . . . . . . . . . 20vContentsPage8.4 General Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 218.5 Cement Density. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
43、 . . . . . . . . . . . . . . . . . . . . . . 218.6 Critical Gel Strength Period (CGSP). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 228.7 Fluid Loss Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44、 . . . . . . . . . . . . . . . . . . . . . 248.8 Slurry Stability, Sedimentation and Free Fluid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 248.9 Rheology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
45、 . . . . . . . . . . . . . . . . . . . . 258.10 Thickening Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258.11 Compressive and Sonic Strength. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
46、 . . . . . . . . . . . . . . . . . . . . 259 Laboratory Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 269.1 Temperature Determination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
47、. . . . . . . . . . . . . . . . . . . . 2710 Pre-job Preparations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2810.1 Blending, Sampling and Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
48、. . . . . . . . . . . . . . . . . . . 2810.2 Materials Inventory. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2910.3 Equipment Maintenance Checks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49、 . . . . . . . . . . . . . . . . . . 2910.4 Bulk System Checks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2910.5 Equipment Sensor Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3010.6 Rig-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3010.7 Displacement Volumes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .