AIR FORCE MIL-R-38213 B (1)-1984 RAINCOAT MAN'S LIGHTWEIGHT BLUE《蓝色轻质男式雨衣》.pdf

上传人:appealoxygen216 文档编号:428347 上传时间:2018-11-07 格式:PDF 页数:5 大小:186.70KB
下载 相关 举报
AIR FORCE MIL-R-38213 B (1)-1984 RAINCOAT MAN'S LIGHTWEIGHT BLUE《蓝色轻质男式雨衣》.pdf_第1页
第1页 / 共5页
AIR FORCE MIL-R-38213 B (1)-1984 RAINCOAT MAN'S LIGHTWEIGHT BLUE《蓝色轻质男式雨衣》.pdf_第2页
第2页 / 共5页
AIR FORCE MIL-R-38213 B (1)-1984 RAINCOAT MAN'S LIGHTWEIGHT BLUE《蓝色轻质男式雨衣》.pdf_第3页
第3页 / 共5页
AIR FORCE MIL-R-38213 B (1)-1984 RAINCOAT MAN'S LIGHTWEIGHT BLUE《蓝色轻质男式雨衣》.pdf_第4页
第4页 / 共5页
AIR FORCE MIL-R-38213 B (1)-1984 RAINCOAT MAN'S LIGHTWEIGHT BLUE《蓝色轻质男式雨衣》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、,_e_ MIL-R-BZIIB (i) BY W 999990b 04Yl1905 7 W MIL-R-38213B( USAF) AMENDMENT 1 11 May 1984 k MILITARY SPECIFICATION +- RAINCOAT, MANS, LIGHTWEIGHT, BLUE This amendment form a part of Military Specification MIL-R-38213B(USAF), dated 22 November 1983, and is approved for use by the Department of the A

2、ir Force and is available for use by all Departments and Agencies of the Department of Defense. PACE 1 * 2. I. 1 : Delete IA-A-203 Paper, Kraft, Untreated“ and substitute IUU-P-268 Paper, Kraft, Wrapping I. PAGE 2 * 2.1.1, add: “MIL-T-43548 Thread, Polyester, Cotton-Covered and Hayon Covered “MIL-ST

3、D-1 47 Palletized Unit Loads“. PAGE 4 3.2.3, line 3: Delete sleeve tabs“. 3.2.5, add to end of paragraph: IAS an alternate, polyester/cotton covered thread conforming to MIL-T-43548 may be used, properties as the cotton thread.“ The thread shall have the same 3.2.6: Delete last sentence, PAGE 6 3.2.

4、13.2, line 7 : Delete 11t41L-R-38213B( USAF) $l. PAGE 7 3.3.1: Add new paragraph: 113.3.1.1 Pattern Darts. The raincoat parts shall be cut from the material specified in accordance with the pattern parts indicated as follows: - Mat er ia 1 I Pattern nomenclature - Cut Darta Basic material (see 3.2.1

5、) Back Front Front facing Back sleeve Front sleeve Pocket welt Pocket, outer Fly pieoe Facing tab PlY 1 of 5 FSC 8405 Obtained From GLOBAL ENGINEERING DOCUMENTS 2625 So.Hickory St. Santa Ana, CA 92707 (714)540-9870: (800)854-7179 Licensed by Information Handling ServicesMIL-R-38213B( WAF) AMENDMENT

6、1 Material I_ Pattern nomenclature Cut Dar ta Basic material (Cont Id) (see 3.2.1) Lining (see 3.2.2) Interlining (see 3.2.3) Type II of MIL-(3-297 Class 1 of MIL-C-43718 Ventilating material (see 3.2.4) Operation No. lo, line 2: Topcollar 1 Undercollar 1 Collar stand 2 Inside back yoke . 2 Outside

7、back yoke 1 Eyelet underarm reinforcement 2 Shoulder loops 4 Back lining i Front lining 2 Back sleeve lining 2 Front sleeve lining 2 Front facing inter li ni ng Collar stand interlining Collar interlining Pocket welt interlining Pocket, inner ply Shoulder loops Front facing tab 2 1 1 ._ Netting inse

8、rt 1 PAGE 8 After “the undercollar, add tlundercollar stand“. Operation No, 1 c, last line : Delete shoulderi and substitute “shoulder loop1t. PAGE 12 Operation No. 60, line 3: Delete I1tabs1I and substitute Operation No. 8b, line 1: Delete after ;*Seamai. Operation No. 8b, line 2: substitute: “Join

9、 undercollar stand with interlining to the undercollar I turn stand down and raise stitch 1/16 to 1/8 inch from folded edge of undercollar stand. II Delete 2nd and 3rd sentences in their entirety and Operation No. 8b, column 4: Above tlLSq-lgl add “SSa-1 andIl. Operation No. 8c, line 1 : Delete llle

10、aftl after “Seam. Operation No. 8c, column 4: Delete IiLSq-2bi and substitute “SSa-1 and LSq-2“. 2 of 5 Licensed by Information Handling ServicesflIL-R-382I13B (1) 4 M 747790b 04i.13907 2 M MIL-R-38213B(USAF) AMENDMENT 1 PAGE 13 Operation No. 80, last line: Delete “folded edge or the standIl and sub

11、stitute folded edge of the stand.* Operation No. 8d, lines 1 and 2: Delete land the interliningt. . . _. Operation No. 8d, last sentence: Delete in its entirety. Operation No. 9, 2nd sentence, delete and substitute: IlThe hanger and the loops shall be unifor-n in width, the gage of stitching shall b

12、e equally spaced and unifora from both edges.“ Operation 140. 9d, last sentence, delete and substitute: “The finished loop shall measure 3/8 to 1/2 inch wide by 4 21/2 inches PAGZ 14 Operation Wo. 12a, delete description in its entirety and substitute: Ia, Position a fly piece on the left front faci

13、ng, face to face matching notches, stitch inward at top notch, parallel to front edge and outward at diagonally at each corner to line of stitching.“ bottom notch, 1/2 +1/8 inch from front edge. Cut facing and fly piece ._ Operation No. 12b, delete description in its entirety and substitute: ;lb, Tu

14、rn fly and facing enclosing the seam, force seam line out to edge and stitch 1/8 to 3/15 inch from front edge, backtacking each end.“ Operation tio. 12b, columirs 3, 4, and 5: Delete “301, SSa-1, and 8-121 respectively. em 15 Operation No. 12, add new operation: tif, Position second fly piece under

15、the left fly facing, with the raw edges above and below the notches even, and the front edge of the fly facing between the notches 1/2 +1/8 inch from the raw edge of the fly piece. 1/2 incn tack or backtack centered between each buttonhole. The tack shall be parallel to and 3/16 to 1/11 inch from th

16、e front edge. LSa-1; 5-12 per tack or 28 per bartack.It Place a 3/8 to 301 or bartack; PAGE 16 Operation No. l3e, delete and substitute: le. The shoulder sea!ns of the linings shall be joined and overedge stitched.Il PAGE 18 Operation No. l7a, line 3, delete and substitute: “with a single row of sti

17、tching 7/16 to 1/8 inch from edge.“ Licensed by Information Handling ServicesflIL-R-38213B MIL-R-38213B( WAF) AMENDMENT 1 Pallet pattern not as specified. Interlocking of loads not as specified. Load not bonded with required straps as specified. Exceeds maximum load limits. Omitted; incorrect; illeg

18、ible; of improper size, location, sequence, or method of application. PAGE 21 Operation No. 19: Delete in its. enti-rety. PAGES 25 and 26 Operation No, 27: Delete in its entirety, PAGE 26 Operation No. 28, delete the heading and substitute: “. SSq-2a and SSe-2a; 8-12. PAGE 27 Operation No, 28d: Dele

19、te last two sentences. Operations No. 29a and 29b: Delete in their entirety. PAGE 38 i 4.2.6, add new paragraph: lIL-STD-147, the pallet pattern used shall be approved by the contracting rf ficet-. type Ia of MIL-STO-147. Each prepared load shall be bonded with prisary and -_ Pallet . Interlocking I

20、f the PAZ 42 * 5.2, add nei subparagrsphs: *d, for level U packing (see 5.2.2.1). When weather-resistant grade fiberboard shipping containers are required “e. When palletization is required (see 5.4) .Ib Custodian : Air Force - Il Reviewers: Air Force - 82, 99 DLA - car Preparing activity: Air Force - 11 Project No. 8405-F971 User: Air Force - 45 5 of 5 t U.S. GOVERNMENT PRINTING OFFICE: 1984-705-040/A2701 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC PAS 62958-2015 Clothes washing machines for household use Method for measuring the microbial contamination reduction《家用洗衣机 微生物污染减少的测量方法》.pdf BS PD IEC PAS 62958-2015 Clothes washing machines for household use Method for measuring the microbial contamination reduction《家用洗衣机 微生物污染减少的测量方法》.pdf
  • BS PD IEC PAS 63015-2016 Definition of “Low-Halogen” for electronic products《电子产品“低卤”定义》.pdf BS PD IEC PAS 63015-2016 Definition of “Low-Halogen” for electronic products《电子产品“低卤”定义》.pdf
  • BS PD IEC PAS 63023-2016 Medical electrical system Input interface for haemodialysis equipment for use of external alarming device《医疗电气系统 用于外部报警装置使用的血液透析设备的输入接口》.pdf BS PD IEC PAS 63023-2016 Medical electrical system Input interface for haemodialysis equipment for use of external alarming device《医疗电气系统 用于外部报警装置使用的血液透析设备的输入接口》.pdf
  • BS PD IEC PAS 63077-2016 Good refurbishment practices for medical imaging equipment《医学影像设备的良好改造实践》.pdf BS PD IEC PAS 63077-2016 Good refurbishment practices for medical imaging equipment《医学影像设备的良好改造实践》.pdf
  • BS PD IEC PAS 63083-2017 Specific absorption rate (SAR) measurement procedure for long term evolution (LTE) devices《长期演进(LTE)设备的比吸收率(SAR)测量程序》.pdf BS PD IEC PAS 63083-2017 Specific absorption rate (SAR) measurement procedure for long term evolution (LTE) devices《长期演进(LTE)设备的比吸收率(SAR)测量程序》.pdf
  • BS PD IEC PAS 63088-2017 Smart manufacturing Reference architecture model industry 4 0 (RAMI4 0)《智能制造 参考架构模型行业4 0 (RAMI4 0)》.pdf BS PD IEC PAS 63088-2017 Smart manufacturing Reference architecture model industry 4 0 (RAMI4 0)《智能制造 参考架构模型行业4 0 (RAMI4 0)》.pdf
  • BS PD IEC PAS 80005-3-2014 Utility connections in port Low Voltage Shore Connection (LVSC) Systems General requirements《港口内公用工程接头 低压岸电连接 (LVSC) 系统 通用要求》.pdf BS PD IEC PAS 80005-3-2014 Utility connections in port Low Voltage Shore Connection (LVSC) Systems General requirements《港口内公用工程接头 低压岸电连接 (LVSC) 系统 通用要求》.pdf
  • BS PD IEC TR 60068-3-12-2014 Environmental testing Supporting documentation and guidance Method to evaluate a possible lead-free solder reflow temperature profile《环境试验 支持文.pdf BS PD IEC TR 60068-3-12-2014 Environmental testing Supporting documentation and guidance Method to evaluate a possible lead-free solder reflow temperature profile《环境试验 支持文.pdf
  • BS PD IEC TR 60216-7-2-2016 Electrical insulating materials Thermal endurance properties Results of the round robin tests to validate procedures of IEC TS 60216-7-1 by non.pdf BS PD IEC TR 60216-7-2-2016 Electrical insulating materials Thermal endurance properties Results of the round robin tests to validate procedures of IEC TS 60216-7-1 by non.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1