ANSI TIA-102.BAEE-C-2015 Project 25 Radio Management Controls.pdf

上传人:hopesteam270 文档编号:438426 上传时间:2018-11-14 格式:PDF 页数:62 大小:451.21KB
下载 相关 举报
ANSI TIA-102.BAEE-C-2015 Project 25 Radio Management Controls.pdf_第1页
第1页 / 共62页
ANSI TIA-102.BAEE-C-2015 Project 25 Radio Management Controls.pdf_第2页
第2页 / 共62页
ANSI TIA-102.BAEE-C-2015 Project 25 Radio Management Controls.pdf_第3页
第3页 / 共62页
ANSI TIA-102.BAEE-C-2015 Project 25 Radio Management Controls.pdf_第4页
第4页 / 共62页
ANSI TIA-102.BAEE-C-2015 Project 25 Radio Management Controls.pdf_第5页
第5页 / 共62页
亲,该文档总共62页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 TIA-102.BAEE-C (Revision of TIA-102.BAEE-B) December 2015Project 25 Radio Management Controls ANSI/TIA-102.BAEE-C-2015 APPROVED: DECEMBER 9, 2015 NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturers a

2、nd purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude any member or non-mem

3、ber of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TIA i

4、n accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to address all safety pr

5、oblems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. Any use of trademarks in this document are

6、 for information purposes and do not constitute an endorsement by TIA or this committee of the products or services of the company. (From Project No. ANSI/TIA-PN-102.BAEE-C, formulated under the cognizance of the TIA TR-8 Mobile and Personal Private Radio Standards, TR-8.5 Subcommittee on Signaling

7、and Data Transmission). Published by TELECOMMUNICATIONS INDUSTRY ASSOCIATION Technology and Standards Department 1320 N. Courthouse Road, Suite 200 Arlington, VA 22201 U.S.A. PRICE: Please refer to current Catalog of TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION STANDARDS AND ENGINEERING PUBLICATIONS

8、or call IHS, USA and Canada (1-877-413-5187) International (303-397-2896) or search online at http:/www.tiaonline.org/standards/catalog/ All rights reserved Printed in U.S.A. NOTICE OF COPYRIGHT This document is copyrighted by the TIA. Reproduction of these documents either in hard copy or soft copy

9、 (including posting on the web) is prohibited without copyright permission. For copyright permission to reproduce portions of this document, please contact the TIA Standards Department or go to the TIA website (www.tiaonline.org) for details on how to request permission. Details are located at: http

10、:/www.tiaonline.org/standards/catalog/info.cfm#copyright or Telecommunications Industry Association Technology (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed

11、 in the standards development or any editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR

12、 consisting of patents and published pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the sc

13、ope or validity of any claims of IPR. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant

14、 or represent that procedures or practices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, develop

15、ment or publication of standards (whether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Procedures for American National Standards) then (i) TIA disclaims any duty or obligati

16、on to search or investigate the records of any other SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see TIA Procedures for American National Standards Annex C.1.2.3) of Essential Patent(s) and published pending

17、 patent applications shall apply; and (iii) Information as to claims of IPR in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the conte

18、nts of the Document. TIA does not certify, inspect, test or otherwise investigate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCUR

19、ACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WAR

20、RANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIREC

21、T OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRA

22、CT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITAT

23、IONS. TIA-102.BAEE-C i Foreword (This foreword is not part of this document.) This document has been created in response to a request by the Project 25 Steering Committee as provided for in a Memorandum of Understanding (MOU) dated April 1992 and amended December 1993. The MOU states that the Projec

24、t 25 Steering Committee shall devise a Common System Standard for digital public safety communications (the Standard) commonly referred to as Project 25 or P25, and that TIA, as agreed to by the membership of the appropriate TIA Engineering Committee, will provide technical assistance in the develop

25、ment of documentation for the Standard. If the abbreviation “P25” or the wording “Project 25” appears on the cover sheet of this document when published that indicates the Project 25 Steering Committee has adopted this document as part of the Standard. The appearance of the abbreviation “P25” or the

26、 wording “Project 25” on the cover sheet of this document or in the title of any document referenced herein should not be interpreted as limiting the applicability of the information contained in any document to “P25” or “Project 25” implementations exclusively. This document provides a specificatio

27、n of the Radio Management Protocols for TIA-102 Packet Data. This document was developed by the TIA TR-8.5 Signaling and Data Transmission Subcommittee based on materials originated by the APCO1Project 25 Interface Committee (APIC) Data Task Group (DTG). The 4thedition (Revision C) of this document

28、updated TIA-102.BAEE-B to address errata comments and align the content with the remainder of the Packet Data Document Suite. This document cancels and replaces TIA-102.BAEE-B. There are two annexes in this document. Annex A is normative and is considered part of this specification. Annex B is infor

29、mative and is not considered part of this specification. TIA does not evaluate, test, verify or investigate the information, accuracy, soundness, or credibility of the contents of the Document. In Publishing the Document, TIA disclaims any undertaking to perform any duty owed to or for anyone. Some

30、aspects of the specifications contained in this document may not have been fully operationally tested; however, a great deal of time and good faith effort has been invested in the preparation of this document to ensure the accuracy of the information it contains. 1APCO is an abbreviation for the Ass

31、ociation of Public-Safety Communications Officials. TIA-102.BAEE-C ii Patent Identification The readers attention is called to the possibility that compliance with this document may require the use of one or more inventions covered by patent rights. By publication of this document, no position is ta

32、ken with respect to the validity of those claims or any patent rights in connection therewith. The patent holders so far identified have, we believe, filed statements of willingness to grant licenses under those rights on reasonable and nondiscriminatory terms and conditions to applicants desiring t

33、o obtain such licenses. The following patent holders and patents have been identified in accordance with the TIA intellectual property rights policy: No patents have been identified TIA shall not be responsible for identifying patents for which licenses may be required by this document or for conduc

34、ting inquiries into the legal validity or scope of those patents that are brought to its attention. TIA-102.BAEE-C iii Table of Contents 1. Introduction . 1 1.1 Scope . 1 1.2 References . 1 1.2.1 Normative References 1 1.2.2 Informative References 3 1.3 Acronyms and Abbreviations 3 1.4 Definitions .

35、 3 1.5 Conventions . 4 1.5.1 Message Bit Numbering . 4 1.5.2 Names and Values . 4 1.5.3 Symbols 4 2. Architecture 5 2.1 Network Management Overview. 5 2.2 Control Plane Protocol Stack 6 3. Radio Control Protocol (RCP) . 7 3.1 Protocol Characteristics 7 3.1.1 Multithreaded Interface . 7 3.1.2 Transac

36、tion-based Model . 8 3.2 Service Data Units (SDUs) . 8 3.2.1 General Syntax . 8 3.2.2 Type . 8 3.2.2.1 Request SDU (Type RQST) . 8 3.2.2.2 Response SDU (Type RESP) . 8 3.2.2.3 Report SDU (Type RPRT) 9 3.2.3 Length 9 3.2.4 SDU Tag . 9 3.2.5 MFID . 9 3.2.6 Data 9 3.3 Request Class SDUs (Type RQST) 10

37、3.3.1 Request-Class Syntax 10 3.3.2 Request-Class Operator Commands 12 3.3.2.1 Get Information . 12 3.3.2.2 Get Configuration . 13 3.3.2.3 Restore Default Configuration 13 3.3.2.4 Set Configuration 14 3.3.2.5 Save Configuration . 14 3.3.2.6 Reset Operations Statistics 15 3.3.2.7 Get Operations Stati

38、stics 15 3.4 Response SDUs (Type RESP) . 16 3.4.1 Response-Class Syntax . 16 3.4.2 Response-Class SDUs . 17 3.4.2.1 Get Information Response 17 3.4.2.2 Get Configuration Response 19 TIA-102.BAEE-C iv 3.4.2.3 Reset Operations Statistics Response 20 3.4.2.4 Get Operations Statistics Response . 20 3.4.

39、2.5 Restore Default Configuration Response 21 3.4.2.6 Set Configuration Response . 21 3.4.2.7 Save Configuration Response 22 3.4.2.8 Unknown Command . 22 3.5 Report SDUs (Type RPRT) . 23 3.5.1 Report-Class Syntax . 23 3.5.2 Report-Class SDUs. 24 3.5.2.1 Radio Power-Up . 24 3.5.2.2 Radio Registration

40、 24 3.5.2.3 Data Service Availability . 25 4. Simple Network Management Protocol (SNMP) . 26 4.1 Overview . 26 4.1.1 SNMP Protocol Operations . 27 4.1.2 SNMP Managed Data . 27 4.1.3 SNMP and RCP Equivalency 29 4.2 SNMP Node Definition 29 4.2.1 Object Identifier (OID) . 30 4.2.2 Protocol Stack . 30 4

41、.2.3 SNMP RMP Subtree . 30 4.2.4 SMIv2 Conformance . 31 4.3 SNMP RMP MIB Definition . 31 4.3.1 SNMP RMP MIB Hierarchy . 31 4.3.2 SNMP TR8dot5RmpInfoObjs RMP Node . 32 4.3.3 SNMP TR8dot5RmpConfigObjs RMP Node . 33 4.3.4 SNMP TR8dot5RmpStatsObjs RMP Node . 34 4.3.5 SNMP TR8dot5RmpEvents Node . 34 Anne

42、x A ASN.1 MIB Definition (Normative) . 35 Annex B Network Management Mapping (Informative) 42 B.1 Network Management Functional Area Mapping for RCP 42 B.2 Network Management Functional Area Mapping for SNMP 45 TIA-102.BAEE-C v List of Figures Figure 1 A Interface RMP Control Plane . 6 Figure 2 RCP

43、Control Plane 7 Figure 3 Generic RCP SDU Structure . 8 Figure 4 Generic RCP SDU Structure . 10 Figure 5 Get Radio Information Block Request Syntax . 12 Figure 6 Get Radio Configuration Block Request Syntax . 13 Figure 7 Restore Default Configuration Request Syntax 13 Figure 8 Set Configuration Reque

44、st Syntax 14 Figure 9 Save Configuration Request Syntax . 14 Figure 10 Reset Operations Statistics Request Syntax 15 Figure 11 Get Operations Statistics Request Syntax 15 Figure 12 Generic RCP SDU Structure . 16 Figure 13 Get Information Response Format for Information Block Request 17 Figure 14 Get

45、 Configuration Response Format for Configuration Block Request . 19 Figure 15 Reset Operations Statistics Response Format . 20 Figure 16 Reset Operations Statistics Response Format . 20 Figure 17 Restore Default Configuration Response Format . 21 Figure 18 Set Configuration Response Format . 21 Figu

46、re 19 Save Configuration Response Format 22 Figure 20 Unknown Command Format . 22 Figure 21 General Report-Class SDU Syntax . 23 Figure 22 Radio Power-Up Report Syntax 24 Figure 23 Radio Registration Report Syntax . 24 Figure 24 Data Service Availability Report Syntax 25 Figure 25 Basic SNMP Network

47、 Management Topology 26 Figure 26 SNMP Protocol Stack . 27 Figure 27 Portion of the OID Hierarchy (IETF Registered) . 28 Figure 28 SNMP Control Plane . 30 Figure 29 Initial SNMP RMP Subtree 31 Figure 30 SNMP RMP MIB Hierarchy . 32 TIA-102.BAEE-C vi List of Tables Table 1 Request-Class Operators 11 T

48、able 2 Request Class SDU Operand Values . 11 Table 3 Response Class Result Codes 16 Table 4 SU Information Block Parameters . 18 Table 5 SU Configuration Block Parameters 19 Table 6 SU Operations Statistics Block Parameters 20 Table 7 Report-Class Report IDs . 23 Table 8 Registration Report Informat

49、ion Values . 24 Table 9 Data Service Availability Report Information Values . 25 Table 10 RCP/SNMP Protocol Equivalency . 29 Table 11 RMP Nodes . 32 Table 12 SNMP TR8dot5RmpInfoObjs RMP Node Managed Objects . 33 Table 13 SNMP TR8dot5RmpConfigObjs RMP Node Managed Objects 33 Table 14 SNMP TR8dot5RmpStatsObjs RMP Node Managed Objects . 34 Table 15 SNMP TR8dot5RmpEvents Node Notifications . 34 Table 16 SNMP Event Node Notification Managed Objects 34 Table 17 Response Class Result Codes 42 Table

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ANSI

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1