ARMY MIL-C-60395 C (3)-1992 CHARGE PROPELLING 155MM M4A2 LOADING ASSEMBLING AND PACKING《M4A2型155MM装药推进的装载 组装和包装》.pdf

上传人:eveningprove235 文档编号:441929 上传时间:2018-11-15 格式:PDF 页数:5 大小:147.31KB
下载 相关 举报
ARMY MIL-C-60395 C (3)-1992 CHARGE PROPELLING 155MM M4A2 LOADING ASSEMBLING AND PACKING《M4A2型155MM装药推进的装载 组装和包装》.pdf_第1页
第1页 / 共5页
ARMY MIL-C-60395 C (3)-1992 CHARGE PROPELLING 155MM M4A2 LOADING ASSEMBLING AND PACKING《M4A2型155MM装药推进的装载 组装和包装》.pdf_第2页
第2页 / 共5页
ARMY MIL-C-60395 C (3)-1992 CHARGE PROPELLING 155MM M4A2 LOADING ASSEMBLING AND PACKING《M4A2型155MM装药推进的装载 组装和包装》.pdf_第3页
第3页 / 共5页
ARMY MIL-C-60395 C (3)-1992 CHARGE PROPELLING 155MM M4A2 LOADING ASSEMBLING AND PACKING《M4A2型155MM装药推进的装载 组装和包装》.pdf_第4页
第4页 / 共5页
ARMY MIL-C-60395 C (3)-1992 CHARGE PROPELLING 155MM M4A2 LOADING ASSEMBLING AND PACKING《M4A2型155MM装药推进的装载 组装和包装》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、LINCH-POUND J MIL-C-60395C (AR) AMENDMENT 3 1 September 1992 SUPERSEDING AMENDMENT 2 14 June 1992 MILITARY SPECIFICATION CHARGE, PROPELLING, 155MM, M4A2, LOADING, ASSEMBLING AND PACKING This amendment forms a part of Military Specification MIL-C- 60395C (AR) dated 16 June 1983, and is approved for u

2、se by the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 2.1.2: Delete “9331258 - Packing and Marking for Container, Ammo, Metal PA 95: for Charge, Propelling, 155MM, M4AS“ and substitute “7548187 - Packi

3、ng and Marking of Metal Containers for Propelling Charges, Assembly and Details“. 2.1.2: Add the following new drawings: I 12 9 137 54 19-48-4231/53 - Packing and Marking for Container, Ammo, Metal: PA128 for Charge, Propelling, 155MM, M4A2 (alternate) - Unitization Procedure for Ammunition and Comp

4、onents Packed in Cylindrical Metal or Plastic Containers on 4-Way Entry Metal Pa 1 lets I AMSC NIA 1 of 5 FSC 1320 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C

5、-bO395C (3) 13 999990b LLb590L 345 MIL-C-60395C (AR) AMENDMENT 3 PAGE 3 * Add the following paragraph: “3.6.1 First article test. Test samples shall be withdrawn from the first lot produced by the contractor and tested in ac- cordance with all the requirements of this specification and with Table II

6、I. Until the first article has been performed and found to be acceptable, the contractor is in no way authorized by the Government to initiate the second lot production unless otherwise directed by the contracting officer.“ PAGE 6 TABLE II: Delete “Dwg 9331258“ and substitute “Dwg 7548187“. TABLE II

7、: Delete “Dwg 7548187“ and substitute “Dwg 7548 187/ 129 13754“. PAGE 8 4.4.1: Delete “BPI“ and substitute “SPI“. * 4.4.la: Add the following at the end of the paragraph: “Entire lot of propellant shall be utilized in the formation of one lot of propelling charge unless otherwise approved by the con

8、tracting officer.“ PAGE 12 4.4.2.4: Critical defect 1: Delete in its entirety. Major defect 101: Delete “BPI“ and substitute “SPI“. PAGE 14 4.4.2.6: Critical defect 1: Delete in its entirety. Critical defect 2: Delete in its entirety. Add Major defect 204: “Marking missing, misleading, unidentifiabl

9、e or incorrect lot number.0.65%.3.2.Visualii. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-bO395C (3) 13 79999Ob LLb5902 281 H MIL-C-60395C (AR) AMENDMENT 3 PAGE 16 4.4.2.8: Add Minor defect 204: “Marking missing, misleading, unidentifiabl

10、e or incorrect lot number.O.65%.3.2.Visual1. PAGE 17 4.4.2.9: Critical defect 1: Delete *BPI“ and substitute “SPI“. Add Critical defect 2: “Igniter charge assembly missing . 100%.3.2.Visual“. PAGE 18 4.4.2.10: Drawing Number: Delete “9331258“ and substitute “7548187“. Drawing number: Delete “7548187

11、“ and substitute I 7 54 8 18 7 / 12 9 13 7 5 4 I . Add Major defect 101: “Charge cannot be removed by hand . . . (a) . . . 3.2 . . . 4.5.7“. Minor defect 202: Delete in its entirety. Notes: Add the following: “(a) One sample from every eight hours production“. PAGE 19 4.4.2.11: Delete “9331258“ and

12、substitute “7548187“. 4.4.2.11: Delete “7548187“ and substitute “7548187/12913754“. PAGE 20 4.5.2 : Delete “BPI“ and substitute ISPI“ . 4.5.2.1: Delete “BPI“ and substitute “SPI“. PAGE 21 4.5.2.2 : Delete “BPI“ and substitute “SPI“ in four places. 3 Provided by IHSNot for ResaleNo reproduction or ne

13、tworking permitted without license from IHS-,-,-MIL-C-bO395C (3) 13 99999Ob LLb5903 LL8 MIL-C-60395C (AR) AMENDMENT 3 PAGE 22 4.5.6 : Delete “BPI“ and substitute “SPI“. Add the following paragraph: “4.5.7 Charge removal from container. Each sample shall be tested for removal of the propelling charge

14、 from the container by hand. The charge may be pulled out by the straps or the container may be inverted and the charge either pulled out or slid out. Any charges that cannot be removed from the con- tainer using the above method shall be cause for rejection of the production represented by the samp

15、le.“ Delete paragraph 5.2.1 and add new paragraph 5.2.1: “5.2.1 Level A. The propelling charges shall be packed, sealed and tested in accordance with specified requirements of drawings 7548187/12913754“. Delete paragraph 5.3 and add new paragraph 5.3: requirements of drawings 7548187/12913754“. “5.3

16、 Markinq. Marking shall be in accordance with specified Add new paragraph 5.4: “5.4 Unitization. The propelling charges from paragraph 5.3 shall be unitized in accordance with drawing 19-48-4231/53“. PAGE 23 * Add the following paragraph: “6.11 First article test. The first article test is a one tim

17、e qualification test for a new contractor to load, assemble and pack acceptable M4A2 propelling charges. Once a contractor has demonstrated the ability to load, assemble and pack the M4A2 propelling charge, the first article test may be waived by the contracting officer. The following test program s

18、hall be used for the first article test: 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-C-60395C (3) 13 E 9999906 1165904 054 E MIL-C-60395C (AR) AMENDMENT 3 Table III First article test Test Phase Temp No. Control No. Test TECOM (deq F) Round

19、s TOP Rounds - Propellant 70 Checkout 145 -60 Sequential 145 15 Environmental -60 15 10 TOP-4-2-504 10 TOP-4-2-504 10 TOP-4-2-504 60 TOP-4-2-504 60 TOP- 4 -2 - 5 04 “ The margins of this amendment are marked with an asterisk or ver- tical lines to indicate where changes (additions, modifications, co

20、rrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Preparing activity: Army-AR Army-AR (Project 1320-AC90) 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1