ARMY MIL-G-70477 (2)-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf

上传人:周芸 文档编号:445016 上传时间:2018-11-16 格式:PDF 页数:3 大小:100.35KB
下载 相关 举报
ARMY MIL-G-70477 (2)-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf_第1页
第1页 / 共3页
ARMY MIL-G-70477 (2)-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf_第2页
第2页 / 共3页
ARMY MIL-G-70477 (2)-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 flIL-G-70Y77 (2) 13 7979906 03547Y7 b 9 37-47 MIL-G-70 4 77 (AR) AMENDMENT 2 21 NOVEMBER 1985 SUPERSEDING AMENDMENT 1 9 September 1985 MILITARY SPECIFICATION GRENADES, GP: M42 AND M46, INERT LOADING, ASSEMBLING AND PACKING This Amendment forms a part of Military Specification MIL-G-70477 (AR) date

2、d 15 February 1985, and is approved for use by the US Army Armament Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 11 * 4.4.2.5: Note a: delete in its entirety and substitute: “For each test randomly select 50 samples per l

3、ot or select 2 samples per machine at the start of production each day and 2 samples per machine after every 4 hours of production or portion thereof. failures.“ Reject on 1 or more PAGE 12 * 4.4.2.6, Critical Defect 1: Add “(Grenade Cap, Fuze, Tape Stiffener Assembly) after “illegible“. I AMSC NIA

4、1 of 3 FSC! 1330 /- A Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-70477 (AR) ANENDMENT 2 PAGE 15 4.4.3.1: Delete in its entirety and substitute with the following: “4.4.3.1 Weiqht of inert filler of body loadina assembly (dwg: 9381453 or 93

5、81456) Ma-jor defect. The weight of the inert material of the body loading assembly shall 5e Aeter- mined on one assembly from each body loading machine at the start of production each day, and after every one hour of production or portion thereof. If the weigh.t of any hodv loading assembly fails t

6、o comply with the drawing require- ment, the body loading assemblies produced since the last satisfactory check shall be rejected. In addition, the necessary adjustments shall be made to the machine which will be verified by determining the weight of inert fif-ler of two consecutively produced body

7、loading assemblies. Testina shall be in accordance with paragraph 4.5.2.“ 4.5.2: Delete In its entirety and substitute with the following: “4.5.2 Weight of inert filler of body loading assemblv The following procedure shall be used to determine the weight of the inert filler of the body loading asse

8、mbly. a. Prior to assembly, weigh body assembly with lead cup in b. Load with inert filler using normal production methods. c. Weigh the assembly in air (grams). d. Calculate the weight of inert filler in air (c) - (a). air (grams) . The body assemblies with lead cup inserted shall be randomly selec

9、ted prior to loading and identifie6 as test samples. Each sample shall be marked clearly with its weight and the applicable inert material consolidation machine number. The samples must be retrieved after powder consolidation but prior to cone insertion.“ PAGE 18 ;? 4.5.4.1: Delete first sentence “T

10、he sample assemhlj-es . . Il . 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-70977 (2) 13 9979906 0359949 T ! MIL-G-70477 (AR) AMENDMENT 2 The margins of this amendment are marked with an asterisk or vertical lines to indicate where changes

11、 (additions, modifications, corrections, deletions) from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. Custodian: Army-AR preparing activity : (PI: oj ect 13 30-A2 61) Army-AR 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • API SPEC 6D CHINESE-2014 Specification for Pipeline Valves (TWENTY-FOURTH EDITION ERTA 3 February 2015 ADDENDUM 1 March 2015 Effective August 1 2015) .pdf API SPEC 6D CHINESE-2014 Specification for Pipeline Valves (TWENTY-FOURTH EDITION ERTA 3 February 2015 ADDENDUM 1 March 2015 Effective August 1 2015) .pdf
  • API SPEC 6D RUSSIAN-2008 Specification for Pipeline Valves (Twenty-Third Edition Incorporates Errata 1 June 2008 Errata 2 November 2008 Errata 3 February 2009 Errata 4 ISO 14313 Re.pdf API SPEC 6D RUSSIAN-2008 Specification for Pipeline Valves (Twenty-Third Edition Incorporates Errata 1 June 2008 Errata 2 November 2008 Errata 3 February 2009 Errata 4 ISO 14313 Re.pdf
  • API SPEC 6D RUSSIAN-2014 Specification for Pipeline Valves (Twenty-Fourth Edition Incorporates Errata 1 October 2014 Errata 2 December 2014 Effective August 1 2015) .pdf API SPEC 6D RUSSIAN-2014 Specification for Pipeline Valves (Twenty-Fourth Edition Incorporates Errata 1 October 2014 Errata 2 December 2014 Effective August 1 2015) .pdf
  • API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf API SPEC 6D-2014 Specification for Pipeline and Piping Valves (TWENTY-FOURTH EDITION ERTA 1 October 2014 ERTA 2 December 2014 ERTA 3 February 2015 ERTA 4 June 2015 ERTA 5 July 2015.pdf
  • API SPEC 6DSS CHINESE-2009 Specification for Subsea Pipeline Valves (SECOND EDITION ERTA 2 November 2010 ISO 14723 2009 Adoption Effective June 1 2010) .pdf API SPEC 6DSS CHINESE-2009 Specification for Subsea Pipeline Valves (SECOND EDITION ERTA 2 November 2010 ISO 14723 2009 Adoption Effective June 1 2010) .pdf
  • API SPEC 6DSS-2009 Specification for Subsea Pipeline Valves (Second Edition Effective Date June 1 2010 Incorporates Errata 1 September 2010 and Errata 2 November 2010)《海底管道阀用规范.第2版.pdf API SPEC 6DSS-2009 Specification for Subsea Pipeline Valves (Second Edition Effective Date June 1 2010 Incorporates Errata 1 September 2010 and Errata 2 November 2010)《海底管道阀用规范.第2版.pdf
  • API SPEC 7-1-2006 Specification for Rotary Drill Stem Elements (First Edition Effective September 2006 Incorporates Addendum 1 March 2007 Addendum 2 August 2009 Addendum 3 April 20.pdf API SPEC 7-1-2006 Specification for Rotary Drill Stem Elements (First Edition Effective September 2006 Incorporates Addendum 1 March 2007 Addendum 2 August 2009 Addendum 3 April 20.pdf
  • API SPEC 7-2-2008 Specification for Threading and Gauging of Rotary Shouldered Thread Connections (First Edition Effective December 1 2008)《旋转肩头连接件的螺纹和计量规范.第1版》.pdf API SPEC 7-2-2008 Specification for Threading and Gauging of Rotary Shouldered Thread Connections (First Edition Effective December 1 2008)《旋转肩头连接件的螺纹和计量规范.第1版》.pdf
  • API SPEC 7-2-2017 Threading and Gauging of Rotary Shouldered Connections (SECOND EDITION ERTA 1 August 2017) .pdf API SPEC 7-2-2017 Threading and Gauging of Rotary Shouldered Connections (SECOND EDITION ERTA 1 August 2017) .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1