ARMY MIL-M-45664E-1974 MOUNT PERISCOPE M118 AND M118E1.pdf

上传人:rimleave225 文档编号:445736 上传时间:2018-11-16 格式:PDF 页数:9 大小:394.42KB
下载 相关 举报
ARMY MIL-M-45664E-1974 MOUNT PERISCOPE M118 AND M118E1.pdf_第1页
第1页 / 共9页
ARMY MIL-M-45664E-1974 MOUNT PERISCOPE M118 AND M118E1.pdf_第2页
第2页 / 共9页
ARMY MIL-M-45664E-1974 MOUNT PERISCOPE M118 AND M118E1.pdf_第3页
第3页 / 共9页
ARMY MIL-M-45664E-1974 MOUNT PERISCOPE M118 AND M118E1.pdf_第4页
第4页 / 共9页
ARMY MIL-M-45664E-1974 MOUNT PERISCOPE M118 AND M118E1.pdf_第5页
第5页 / 共9页
亲,该文档总共9页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-fl-45664E 12 7779906 O308365 7 m MIL-M-4 5 6643 (MU) 31 January 1974 SUPERSEDING MIL-M-45664D (MU) 8 June 1970 MILITARY SPECIFICATION MOUNT, PERISCOPE: Ml18 AND Mi.18E1 1. SCOPE 1.1 This specification covers instruments known as Mount,Periscope: Mi18 and Mont, Periscope: Ml18E1 (see 6.1). 2. APP

2、LICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invi- tation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS Militar y MIL-F-13926 MLL-P-14232 MIL-1-45607 STANDARDS Military MIL-STD-105 MIL-STD-109 6.

3、 DRAWINGS Frankford Arsenal F8619450 A8 644448 F10554660 F10554661 F10554663 Fire Control Materiel: General Specifi- cation Governing the Manufacture and Inspection Of Parts, Equipment and Tools for Army Materiel; Packaging and Packing of Inspection Equipment, Supply and Maint- enance of Sampling Pr

4、ocedures and Tables for In- Quality Assurance Terms and Definitions spection by Attributes Mount, Periscope: Ml18 Push-Pull Gage Holding Fixture Set-up Final Test Fixture for Mount, Test Standard for Mount Periscope: Ml18 Periscope: Mi.18 FSC 1240 I- A Provided by IHSNot for ResaleNo reproduction or

5、 networking permitted without license from IHS-,-,-MIL-M-4Sbb4E 12 m 7777906 03083bb 7 F11732148 F11732149 E11727490 PACKAGING DATA SHEET PS8619450 PS11727490 Gage, Interchangeability, Maximum Gage, Interchangeability, Minimum Mount, Periscope: Mi18E1 Packaging of Mount, Periscope: Ml18 Packaging of

6、 Mount, Periscope: M118E1 (Copies of specifications, standards, drawings, and packaging data sheets required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the con- tracting officer.) 3. REQUIREMENTS 3.1 Fabrication.- T

7、he mount shall be manufactured in accordance with Drawing F8619450 (Ml18), or E11727490 (Ml18El), and drawings pertaining thereto. 3.2 General specification.- The contractor shall be responsible for adherence tos and compliance with, the following requirements of MIL-F- 13926: (a) Order of precedenc

8、e. (b) Dimensions and tolerances. (c) Inorganic protective surface finishes. (d) Part identification and marking. (e) Uorkmanship . 3.2.1 Interchangeability.- The mount shall be capable of permitting insertion of the gages specified in 4.6.7. shall be capable of being firmly.secured and subsequently

9、 removed. After insertion, the gages 3.3 Environmental. 3.3.1 Operating temperatures.- The mount shall meet the applicable requirements of 3.5.1 to 3.5.4.2 inclusive while exposed to and thermally stabilized at ambient temperatures of -40 and +150F. z .* 3.3.2 Vibration,- The mount shall be vibrated

10、 at a constant frequency of 30 cycles per second with an amplitude of 1/16 inch (1/8 inch maximum excursion) for a period of 5 t1/4 minutes. Subsequent to vibration, there shall be no evidence of physical failure and the mount shall meet the fall- owing requirements of this specification (see 3.5-4.

11、2). 3.4 Orientation,- The locating surface of the mounting flange of the Gages referenced in 3.2.1 mount shall be secured in a horizontal plane and the headrest assemblies shall be in their uppermost vertical position. shall be utilized to determine compliance with the requirements of 3.5.1 and 3-5.

12、2. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-45 6 643 (MU) 3.5 Perf ormance 3.5.1 Release grip.- With the gages in 3.2.1 inserted into the mount, the release grip shall automatically latch the gages in the fully inserted position, A dir

13、ect pull of not more than 15 pounds on the release grip shall actuate the grip to its full disengaged position. of the grip shall allow removal of the gages from the mount without re- strictions. Full disengagement 3.5.2 Holding features.- When Lever 8619482 is pushed to its fullest forward position

14、 and locked by releasing the plunger, the gages (see 3.2.1) shall be secured in the mount. pound pressure applied horizontally to the front and rear of each gage at a point 7.5 inches below the center of the plugs (Part No. 8298440), the gage shall be within .O005 inch of its original location when

15、measured horizontally at a point 7.5 inches below the center of the plugs. This requirement shall be met following the release of each of the pressures applied. Subsequent to the application of a ten 3.5.3 Shield assembly.- With the plunger depressed (disengaged), maxi- mure operation of the handle

16、shall operate the shield through full operation (open for viewing and closed for protection). and when the shield is fully closed, the plunger shall engage and lock the handle when the plunger is released. When the shield is fully open 3.5.4 Headrest. 3.5.4,l Headrest horizontal travel.- Each Knob B

17、8619466 (M118) or Screw B10516599 (Mi18E1) shall be loosened and each headrest assembly shall be adjustable through maximum movement permitted by the elongated slot in the assembly without restriction or force. 3.5.4.2 Retention.- The torsional load applied to each Screw 8619463 (see applicable Draw

18、ing F8619450or E11727490) shall be such that the head- rests shall not change position when subjected to the vibration specified in 3.3.2 and shall be operable at the temperature specified in 3.3.1, 4. QUALITY ASSURANCE PROVISIONS z 4.1 Responsibility for inspection.- Unless otherwise specified in t

19、he contract or purchase order, the supplier is responsible for the performance of all inspection requiremats as specified herein, specified, the supplier may utilize his own facilities or any other faci- lities suitable for the performance of the inspection requirements speci- fied herein, unless di

20、sapproved by the Government. The Government reserves the right to perform acy of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise 3 . . Provided by IHSNot for ResaleNo re

21、production or networking permitted without license from IHS-,-,-4.1.1 General provisions.- The component and subassembly inspection requirements of MIL-F-13926 form a part of the quality assurance provis- ions of this specification. Definitions of inspection terms shall be as listed in MIL-STD-109,

22、4.2 First article (initial production) approval.- The requirement for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. le for first article approval tests shall consist of three mounts plus three each of all ite

23、ms covered by SQAP. in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, in- cluding packaging and packing, shall be obtained from the same source of supply as used in regular production. The samp- The sample shall

24、 be manufactured 4.2.1 Government testing.- When the Government is responsible for con- ducting first article approval tests, the contractor, prior to submitting the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the contract and submit a rec

25、ord of this inspection with the sample, including certificates of conformance for materiais. 4.2.2 Contractor testing.- When the contractor is responsible for conducting first article approval tests, the sample shall be inspected by the contractor for all the requirements of the contract. and a reco

26、rd of this inspection, including certificates of conformance for materials shall be submitted to the Government for approval, The Government reserves the right to witness the contractors inspection. The sample 4.3 Inspection provisions. 4.3.1 Submission of product.- Unless otherwise specified by the

27、 con- tracting officer, inspection lot size, lot formation and presentation of lots shall be in accordance with “Submission of Product“ provisions of MIL-STD-105, 4.3.2 Examination and tests. 4.3.2.1 Components and subassemblies.- All components and subassem- blies shakl be inspected in accordance w

28、ith the inspection provisions con- tained in Supplementary Quality Assurance Provisions (SQAE) listed in the technical data package (TDP). In the absence of SQAPs, the applicable Quality Assurance Provisions of MIL-F-13926 shall apply. Examination and tests related to Section 3 herein shall be perfo

29、rmed on a single defect (individual characteristic) basis in accordance with MIL-STD-105 and the sampling plans specified in Tables I, II and III herein. tests for packaging, packing, and marking shall be in accordance with MIL-P-14232 and Section 5 herein. The tabulated classification of de- fects

30、in Tables I, II and III shall constitute the minimum inspection to be performed by the supplier after first article approval and prior Examination and 4 i. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-45664E (MU) I to Government acceptance o

31、r rejection by item or lot. 4.3.2.2 100 Percent inspection.- The following requirements in Table I and related tests shall be subjected to 100% inspection: TABLE I - CLASSIFICATION OF DEFECTS 100% INSPECTION - NO. CHARACTERISTIC REQUIREMENT TEST PROCEDURE 101, Interchangeability 3.2.1 4.6.7 102. Rel

32、ease grip 3.5.1 4.6.3 103. Holding f eatures 3.5.2 4.6.4 104. Shield assembly 3.5.3 4.6.5 105. Headrest horizontal travel 3.5.4.1 4.6.6 106. Retention 3.5.4.2 4.6.6.1 MINOR: None - NOTE: The tests of Table I shall be conducted at a temperature between +60 and +90F. 4.3.3 Acceptance and rejection,- R

33、ejected lots shall be screened for all defective characteristics. units and resubmittance of rejected lots shall be in accordance with “Acceptance and Rejection“ as specified in MIL-STD-105. Removal or correction of defective 4.4 Special sampling. 4.4.1 General.- One mount shall be selected at rando

34、m as a special sampling from each 100 produced. and tests in Table II. The sample shall meet the requirements TABLE 11 NO. CHARACTERISTIC REQUIREMENT TEST PROCEDURES 3.01. Fabrication 3.1 Applicable drawing- Visual 302. General specification 3.2 MIL-F-13926 - Visual 4.4.2 Environmental.- Three mount

35、s shall be selected at random as samples from each SO produced, or from each months production, which- ever occurs first. In Table III. Each sample shall meet the requirements and tests 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-45664E(M

36、U) TABLE III - NO. CHARACTERISTIC REQUIREMENT TEST PROCEDURE 303, Release grip 3.3.1, 3.5.1 4.6.1.1, 4.6.3 304, Holding features 3.3.1, 3.5.2 4.6.1.1, 4.6.4 305. Shield assembly 3.3.1, 3.5.3 4.6.1.1, 4.6.5 306. Headrest horizontal travel 3.3.1, 3.5.4.1 4.6.1.1, 4.6.6 307. Retention 3.3.1, 3.5.4.2 4.

37、6.1.1, 4.6.6.1 308. Vibration 3.3.2 4.6.1.2 shall be conducted at -40 and +150F. NOTE: The tests for Characteristics 303 through 307 inclusive 4.4-3 Failure of sample.- Should any one item of a special sampling fail to meet the specified test requirements, acceptance of the product shall be suspende

38、d by the Government until necessary corrections have been made by the contractor and resubmitted samples have been approved (see 4.3.3). 4.5 Inspection equipment.- Except as otherwise provided for by the contract, the contractor shall supply and maintain inspection equipment in accordance with the a

39、pplicable requirements of MIL-1-45607, 4.5.1 Government furnished inspection equipment.- Where the contract provides for Government furnished test equipment, supply and maintenance of test: equipment shall be in accordance with the applicable requirements specified in MIL-1-45607, 4.5.2 Contractor f

40、urnished inspection equipment. 4.5.2.1 Government design.- Unless otherwise specified in the con- tract, all inspection equipment specified by drawing number in specifica- tions or SQAP forming a part of the contract shall be supplied by the con- tractor in accordance with technical data listed in t

41、he technical data package (TDP) . 4.5.2.2 Contractor design.- The contractor shall design and supply inspection equipment compatible with the “Test Methods and Procedures“ specifie$.in 4.6 of: this specification and with the component inspection procedures specified in “Examination“ and “Test Facili

42、ties“ requirements of MIL-F-13926. Since tolerance of test equipment is normally considered to be within ten percent of the product tolerance for which it is intend- ed, this inherent error in the test equipment design must be considered as part of the prescribed product tolerance limit, Thus, conce

43、pt, con- struction, materials, dimensions and tolerances used in the design of test equipment shall be so selected and controlled as to insure that the test equipment will reliably indicate acceptability of a product which does not exceed 90% of the prescribed tolerance limit, and permit positive re

44、jection when non-conforming, Construction shall be such as to facili- tate routine calibration of test equipment. i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-45 6 643 (MU) 4.6 Test methods and procedures. 4.6.1 Environmental. 4,6.1,1 Oper

45、ating temperatures.- All moving or movable parts shall be inspected for operability and performance when exposed to the specified low and high temperatures of 3.3.1. The release grip, holding features, shield assembly and headrest shall be inspected in accordance with 4.6.3 to 4.6,6.1 inclusive. 4.6

46、.1.2 Vibration.- The mount shall be positioned in a vibration test The mount shall be vibrated in adapter secured to the Vibration equipment. a vertical plane in accordance with the conditions specified in 3.3.2, A visual inspection shall be made for physical damage or loose components and assemblie

47、s. specified herein. The mount shall then be subjected to the following tests 4.6.2 Orientation.- Special test equipment conforming to the require- ments of Drawing F10554660 (Holding Fixture) shall be utilized to accept the mount, completely assembled, and secure it in the position required by 3.4,

48、 shall be performed in accordance with the applicable Set-up instructions contained on Drawing F10554661 (Set-up Final Test Fixture for Mount Peri- scope: Ml18). Set-up of the test equipment and installation of the mount under test 4.6,3 Release grip.- When the mount is oriented and positioned on th

49、e device as specified in 4.6.2, the gages in 4.6.7 shall be utilized for this test. Release the Locking Lever 8619482 and pull to full open position. It shall remain at this position for this test. ability gage into the bottom of the mount and push up until the relase lev- ver is activated and snaps into position. Caution should be used to make sure the gage is secured before the inspector releases his hold on it, to prevent injury. Do not lock Lever 861

展开阅读全文
相关资源
猜你喜欢
  • STAS SR CEI 597-1-1995 Aerials for the reception of sound and television broadcasting in the frequency range 30 MHz to 1 GHz Part.1 Electrical and mechanical characteristics《接收波段范围.pdf STAS SR CEI 597-1-1995 Aerials for the reception of sound and television broadcasting in the frequency range 30 MHz to 1 GHz Part.1 Electrical and mechanical characteristics《接收波段范围.pdf
  • STAS SR CEI 597-2-1995 Aerials for the reception of sound and television broadcasting in the frequency range 30 MHz to 1 GHz Part 2 Methods of measurement of electrical performance.pdf STAS SR CEI 597-2-1995 Aerials for the reception of sound and television broadcasting in the frequency range 30 MHz to 1 GHz Part 2 Methods of measurement of electrical performance.pdf
  • STAS SR CEI 597-3-1995 Aerials for the reception of sound and television broadcastlng in the frequency range 30 MHz to 1 GHz Part 3 Methods of measurement of mechanica! properties .pdf STAS SR CEI 597-3-1995 Aerials for the reception of sound and television broadcastlng in the frequency range 30 MHz to 1 GHz Part 3 Methods of measurement of mechanica! properties .pdf
  • STAS SR CEI 597-4-1996 Aerials for the reception of sound and television broadcasting in the frequences range 30 MHZ to 1 GHZ Part4 Guide for the preparation of aerial performance a.pdf STAS SR CEI 597-4-1996 Aerials for the reception of sound and television broadcasting in the frequences range 30 MHZ to 1 GHZ Part4 Guide for the preparation of aerial performance a.pdf
  • STAS SR CEI 603-1-1995 Connectors for frequencies below 3 MHz for use with printed boards Part 1 Generic specification - General requirements and guide for the preparation of detai.pdf STAS SR CEI 603-1-1995 Connectors for frequencies below 3 MHz for use with printed boards Part 1 Generic specification - General requirements and guide for the preparation of detai.pdf
  • STAS SR CEI 654-2+A1-1995 Operating conditions for industrial process measurement and control equipment Part 2 Power《工业程序测量和控制设计的操作条件 第2部分:电力 》.pdf STAS SR CEI 654-2+A1-1995 Operating conditions for industrial process measurement and control equipment Part 2 Power《工业程序测量和控制设计的操作条件 第2部分:电力 》.pdf
  • STAS SR CEI 654-3-1983 Operating conditions for industrial - process measurement and control equipment Part 3 Mechanical influences《工业加工测量和控制设备的操作规范 第3部分:机械影响 》.pdf STAS SR CEI 654-3-1983 Operating conditions for industrial - process measurement and control equipment Part 3 Mechanical influences《工业加工测量和控制设备的操作规范 第3部分:机械影响 》.pdf
  • STAS SR CEI 654-4-1987 Operating conditions for industrial-process measurement and control equipment Part 4 Corrosive and erosive influences《工业过程测量和控制设备的操作条件 第4部分:腐蚀和侵蚀的影响 》.pdf STAS SR CEI 654-4-1987 Operating conditions for industrial-process measurement and control equipment Part 4 Corrosive and erosive influences《工业过程测量和控制设备的操作条件 第4部分:腐蚀和侵蚀的影响 》.pdf
  • STAS SR CEI 695-1-3-1994 Fire hazard testing Part 1 Guidance for the preparation of requirements and test specifications for assessing fire hazard of eiectrotechnical products Guid.pdf STAS SR CEI 695-1-3-1994 Fire hazard testing Part 1 Guidance for the preparation of requirements and test specifications for assessing fire hazard of eiectrotechnical products Guid.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1