ARMY MIL-P-46990-1963 PROPELLANT M1 FOR USE IN CHARGE PROPELLING FOR 75MM HOWITZER M1A1 AND M3《M1A1和M3式75毫米榴弹炮发射装药系统用M1发射药》.pdf

上传人:terrorscript155 文档编号:446336 上传时间:2018-11-16 格式:PDF 页数:3 大小:209.42KB
下载 相关 举报
ARMY MIL-P-46990-1963 PROPELLANT M1 FOR USE IN CHARGE PROPELLING FOR 75MM HOWITZER M1A1 AND M3《M1A1和M3式75毫米榴弹炮发射装药系统用M1发射药》.pdf_第1页
第1页 / 共3页
ARMY MIL-P-46990-1963 PROPELLANT M1 FOR USE IN CHARGE PROPELLING FOR 75MM HOWITZER M1A1 AND M3《M1A1和M3式75毫米榴弹炮发射装药系统用M1发射药》.pdf_第2页
第2页 / 共3页
ARMY MIL-P-46990-1963 PROPELLANT M1 FOR USE IN CHARGE PROPELLING FOR 75MM HOWITZER M1A1 AND M3《M1A1和M3式75毫米榴弹炮发射装药系统用M1发射药》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-P-4b990 33 9999906 0335370 5 fl- 24-4- MLP-46990 (MU) 13 SEPTEMBER 1963 MILITARY SPECIFICATION PROPELLANT, M1 FOR USE IN CHARGE PROPELLING FOR 75MM HOWITZER MlA1 AND M3 1. SCOPE 1.1 This specification covers the M1 pro- pellant for one ype of propelling charge for 75MM howitzer MlAl and M3. 2. A

2、PPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or re- quest for proposal, form a part of this speci- fication to the extent specified herein. SPECIFICATIONS MILITARY NIL-A-2550 -Ammunition and Spe- cial Weapons; Gen- eral Specification for ments

3、 ; General Specification for MIL-I45208 -Inspection Require- STANDARDS MILITARY MIL-STD-109 -Quality Assurance Terms and Definitions and Tables for Inspection by Attributes MIL-STD-652 -Solid Propellant for Cannon Require- ments and Packing MIL-STD-414 -Sampling, Procedures 3. REQUIREMENTS 3.1 Mater

4、ial. The propellant shall be MI, Type II, and conforming to the requirements of Standard MIL-STD-652. 3.2 Ballistics. The propellant, when fired in the weapon and with the weight of projec- tile for which it was manufactured, shall comply with the following requirements when tested as specified in 4

5、.3.1. 3.2.1 Velocity and pressure. The propel- lant, at 70 degrees Fahrenheit, shall be assessed to impart a service velocity of .381 meter per seconds (mps) at zone 4 to the projectile without exceeding a maximum rate pressure of 34,800 pounds per square inch, piezo equivalent pressure. 3.2.2 Unif

6、ormity of velocity. The standard deviation in velocity for the lot, at 70 degrees Fahrenheit, shall not exceed 1.22 mps. 3.3. Workmanship. The best commercial practices shall be used in the formulation of the propellant furnished under this specifi- cation and all other applicable documents. The pro

7、pellant and its standard ingredients shall be protected from the action of direct sunlight and acid fumes. 4. QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance provisions. Unless otherwise specified in the contract or purchase order, the supplier is responsible or the performance of all ins

8、pection require- ments specified herein. Except as otherwise specified, the supplier may utilize his own or any other inspection facilities and services acceptable to the Government. Inspection rec- ords of the examinations and tests shall be kept complete and available to the Govern- ment as specif

9、ied in the contract or order. The Government reserves the right to per- form any of the inspections set forth in the specification where such inspections are Y _l I_- - THIS DOCUMENT CONTAINS 3 PAGES. - - _- _ -_, Provided by IHSNot for ResaleNo reproduction or networking permitted without license f

10、rom IHS-,-,-MIL-P-46990 (MU) deemed necessary to assure that supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL- STD-109 in order to define terms used herein. The provisions of Specification MIL- A-2550 shall apply. 4.1. Contractor quality assurance sys

11、tem. The contractor shall provide and maintain an effective quality assurance system in com- pliance with the requirements of Specifica- tion MIlrI-45208. 4.1.2 Submissdm of product. At the time the completed lot of product is submitted to the Government for acceptance the contrac- tor shall supply

12、the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted : (a) A statement that the lot complies with all quality assurance provi- sions of the approved current written description of the system. (b) N

13、umber of units of product in- spected. (e) Results obtained for all inspection performed. (d) Drawing, specification number and date, together with an identifica- tion and date of changes. (e) Certificates of analysis on all ma- terial procured directly by the contractor when such material is contro

14、lled by Government specifi- cations referenced in any of the contractual documents. (f) Number of items in the lot. (g) Date submitted. (h) Eight copies of propellant descrip- tion sheet, O0 Form 1204, contain- ing the applicable data. The certificate shall be signed by a responsi- ble agent of the

15、certifying organization. The initial certificate submitted shall be substan- tiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless during the course ofhe contract2 this authority is vested in

16、another agent of the certifying or- ganization. 4.1.3 Government verification. Using the contractors written quality assurance proce- dure, this detail specification, the applicable drawings and other contractual documents as a guide, the Government inspector shall verify at unscheduled intervals al

17、l quality assurance operations performed by the con- tractor. Verification will be in accordance with Specification MILI45208 and will be performed to the extent necessary to assure compliance with the contractual require- ments. Severity of Government inspection of individual characteristics will b

18、e directly re- lated to the seriousness of the classification assigned. In no instance will a characteristic classified “critical” be accepted solely on the basis of the contractors records. 4.2 Inspection provisions. 4.2.1 Lot formatiom. A lot shall consist of one or more batches of MI Propellant p

19、ro- duced by one manufacturer, in accordance with the same specification or same specifi- cation revision, under one continuous set of operating conditions. Each batch shall con- sist of that quantity of MI Propellant which has been subjected to the same unit chemical or physical mixing process inte

20、nded to make the final product homogeneous. 4.2.2 Testhg. 4.2.2.1 Ballistics. (See 3.2). A sample of 30 pounds shall be randomly selected from the lot for the ballistic test. A ten-round uni- formity series shall be fired after condition- ing the rounds at 70 degrees Fahrenheit. 4.2.2.1.1 Velocity a

21、nd pressure (Cyitical defect). The lot shall be rejected if the calculated pressure at the charge recom- mended for prescribed service velocity ex- ceeds the average maximum pressure limitation specified in 3.2.1. Code No. 01001. 4.2.2.1.2 Velocity unifomity (Major de- fect). The lot shall be reject

22、ed if the standard deviation of the uniformity series times the factor 0.73 fails to comply with the applicable requirement (see 3.2.2). f- ,. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-46990 (MU) 4.2.2.2 Betest. If for any reason the proo

23、f director considers that the test conditions have detrimentally affected the test results, he shall declare the results invalid and per- form a new test on additional charges as required. 4.3 Test methods and procedures. 4.3.1 BaiZ Example B-I. 6. PREPARATION FOR DELIVERY 5.1 Packing and marking. T

24、he propellant shall be packed and marked in accordance with Standard BIIL-STD-652. 6. NOTES 6.1 Ordering data. Procurement docu- (a) Title, number and date of this speci- ments should specify the following: fication Notice. When Government drawings, specifica- tions, or other data are used for any p

25、urpose other than in connection with a definitely related Govern- ment procurement action, he United States Govern- ment thereby incurs no responsibility nor any obli- gation whatsoever; and the fact that the Govern- ment may have formulated, fmishecl, or in any way supplied the said drawings, speci

26、fications, or other data is not intended to be regarded by implication or otherwise as in any manner licensing the holder or any other person or corporation or conveying any rights or permission to manufacture, use, or sell any patented invention that may in any way be related thereto. Custodian: ARMY-MU Preparing activity: ARMY-MU Project No. 1375-A631 f? U. S. GOVERNMENT PRINTING O*ICE: 1S63-701044/610 Y, 5 _-. . . 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1