ARMY MIL-PRF-44330 B-1996 FOOD SANITATION CENTER COMPONENTS THEREOF USED WITH FIELD KITCHENS《野外厨房一起使用零件食品卫生中心》.pdf

上传人:explodesoak291 文档编号:447250 上传时间:2018-11-16 格式:PDF 页数:15 大小:580.62KB
下载 相关 举报
ARMY MIL-PRF-44330 B-1996 FOOD SANITATION CENTER COMPONENTS THEREOF USED WITH FIELD KITCHENS《野外厨房一起使用零件食品卫生中心》.pdf_第1页
第1页 / 共15页
ARMY MIL-PRF-44330 B-1996 FOOD SANITATION CENTER COMPONENTS THEREOF USED WITH FIELD KITCHENS《野外厨房一起使用零件食品卫生中心》.pdf_第2页
第2页 / 共15页
ARMY MIL-PRF-44330 B-1996 FOOD SANITATION CENTER COMPONENTS THEREOF USED WITH FIELD KITCHENS《野外厨房一起使用零件食品卫生中心》.pdf_第3页
第3页 / 共15页
ARMY MIL-PRF-44330 B-1996 FOOD SANITATION CENTER COMPONENTS THEREOF USED WITH FIELD KITCHENS《野外厨房一起使用零件食品卫生中心》.pdf_第4页
第4页 / 共15页
ARMY MIL-PRF-44330 B-1996 FOOD SANITATION CENTER COMPONENTS THEREOF USED WITH FIELD KITCHENS《野外厨房一起使用零件食品卫生中心》.pdf_第5页
第5页 / 共15页
亲,该文档总共15页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 MIL-PRF-44330B W 0b 2025525 571 m MIL-PRF-44330B (GL) 25 September 1996 SUPERSEDING 13 January 1995 MIL-F-443 3 OA (GL) PERFORMANCE SPECIFICATION FOOD SANITATION CENTER, COMPONENTS THEREOF, USED WITH FIELD KITCHENS This specification is approved for use by the U. S. Army Natick Research, Developmen

2、t, and Engineering Center and is available for use by all Departments and Agencies of the Department of Defense (DoD). 1. SCOPE 1.1 Scope. This specification covers fabricated components that are unique to the Food Sanitation Center (FSC) which will provide a means for effectively sanitizing utensil

3、s and serving equipment associated with the combat feeding system, in a field environment. 2. APPLICABLE DOCUMENTS (None) 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.1.1. 3.2 Design. materials. and manufact

4、uring processes. Unless otherwise specified, the design, materials, and manuacturing process selection is the prerogative of the contractor as long as all articles submitted to the Government fully meet the requirements specified herein. Beneficial comments (recommendations, additions, deletions) an

5、d any pertinent data which may be of use in improving this document should be addressed to: U.S. Army Natick Research, Development, and Engineering Center, Natick, MA 01760-501 8 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by let

6、ter. AMSC NIA FSC 7360 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-PRF-44330B = 9999906 2025526 408 Item No. 1 2 3 MIL-PRF-44330B (GL) Description Sinks SinkCovers Thermometer Bracket 3.3 OperatinP reauirements. The Food Sanitation Center co

7、mponents (reference Figure 1) identified in table I shall satis the following requirements. 3.3.1 thni3.3.7 I 3 TABLE I. Food Sanitation Center Components I Maximum Weight Allowance. Each (lbs.) I 60 I 4 I Hose, Drain, 3-Sink I 3.3.10 3 3.3.1 1 and 3.3.12 1 3.3.1 1 and 3.3.12 1 3.3.13 and 3.3.14 1 3

8、.3.15 and 3.3.16 2 3.3.17 2 Sets 5 I Hose, Drain, 1-Sink 6 7 8 Table, Drain Rack, Sink, Immersion Rack Set, Storage and Drying Reference Paragraph Quantity I 40 I 14 I 42 I 8 I 45 3.3.1 Sink size. The sink interior dimensions shall be not less than 25 inches long, 24 inches wide and 14 inches deep.

9、The height of the sink, when mounted on the burner rack and base rack (see 6.9) shall be approximately 39 inches. 3.3.2 Sink drain. Each sink shall contain a drain and a drain ball-valve with a quick- disconnect coupling at the rear of the sink. 3.3.3 Sink interface. Each sink shall fit securely on

10、the burner rack (see 6.9) and shall interface with a drain hose quick-disconnect coupling. 3.3.4 Sink modularity. Sinks shall be capable of being utilized individually or in multiples of three sinks joined together. The method utilized to join the sinks together shall prevent spillage between the si

11、nks. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- _ MIL-PRF-44330B Ob 2025527 344 MIL-PRF-44330B (GL) 4 5 6. Drain Table *Not covered by this specification FIGURE 1. Sanitation Center Layout - Typical Provided by IHSNot for ResaleNo reproductio

12、n or networking permitted without license from IHS-,-,-MIL-PRF-44330B - 9999906 2025528 280 M MIL-PRF-44330B (GL) 3.3.5 Sink heating. The sink shall permit water to be rapidly heated. The sink shall withstand the direct heat from the burner unit (see 6.9). 3.3.6 Sink drainage. The sink drain shall p

13、ermit rapid drainage. 3.3.7 Sink leakage. Sinks shall not leak. 3.3.8 Sink cover. Sinks shall be provided with covers that minimize liquid splashing and the escape of steam and that have restricted lateral movement in any direction. 3.3.9 Sink cover. handle. Sink covers shall have a handle. The hand

14、le shall have an opening not less than 4 inches wide and 1 3/4 inches high. 3.3.10 Thermometer bracket. The thermometer bracket shall position a thermometer (see 6.9) to measure the temperature of the sink contents when the sink is filled to within 2 inches from the top. The bracket shall not interf

15、ere with washing operations. 3.3.11 Hoses. drain. A 1-sink and a 3-sink drain hose shall be provided. The hoses shall have quick-disconnect couplings and shall interface with the quick-disconnect coupling on the sink drain. The 3-sink drain hose shall be a single hose assembly that connects to 3 sin

16、ks and the hose shall extend not less than 50 feet from the sink. The 1-sink drain hose shall extend not less than 15 feet from the sink. 3.3.12 Hose. drain. drainage and leakage. The 1 -sink and 3-sink drain hose assemblies shall be capable of rapidly draining the sink contents and shall not leak.

17、3.3.13 Table. drain. size and configuration. The drain table shall have a surface area of approximately 9 square feet. The table shall be supported on one end and on the other end the table edge shall mate with either side edge of the sink. The table configuration shall prevent spillage of liquid fr

18、om the sides and the end that is away fiom the sink. The table supports shall be capable of being stored for transport. 3.3.14 Table. drain, drainage. When the drain table is joined to the sink edge and the supports are secured in the supportive position, liquids on the drain table shall quickly dra

19、in into the sink without leakage between the drain table and the sink. 3.3.1 5 Rack. sink. immersion. size and configuration. The sink immersion rack shall fit easily into the sink and shall accommodate utensils associated with food preparation and serving. Two handles shall extend above the top of

20、the rack. The handles shall have an opening not less than 4 inches wide and 5-1/2 inches high. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-44330B 9999906 2025529 117 = MIL-PRF-44330B (GL) 3.3.16 Rack. sink. immersion. drainage. The sink

21、 immersion rack shall provide for the rapid drainage of water. 3.3.17 Rack set. storage and drying. The rack set shall have 3 stackable storage racks. When stacked, the racks shall interlock and shall not be able to move laterally in any direction. Each rack assembly shall have a volume of 16 shall

22、be provided with each storage rack. The shelf shall be able to function as a front cover and shall fasten to the front of the rack. The shelf shall support loads encountered in FSC operation without damage. The bottom, sides and rear of the storage rack, and the shelfkover shall allow for circulatio

23、n of air and drainage of water. 1 cubic feet. A removable height-adjustable shelf 3.3.18 Corrosion resistance. Components listed in table I shall be corrosion resistant. 3.3.19 Chemical resistance. Components listed in table I shall be resistant to the detergents and sanitizers used for washing and

24、sanitizing operations. 3.3.20 Safety. Components listed in table I shall be safe to set up , operate, and transport and shall not create personnel hazards. Burner unit heat and exhaust shall be directed away from the operator. 3.3.2 1 SanitatiodCleaning. Surfaces shall be smooth, washable, free of u

25、nnecessary ledges, projections or crevices, and readily accessible for cleaning. 3.4 Ownership and support reauirements. 3.4.1 Shelf life. The depot storage life shall be not less than 10 years. 3.4.2 Service life. The service life of the drain hoses shall be not less than 3 years of continuous use.

26、 All other components shall have a service life of not less than 5 years of continuous use in a field environment. 3.4.3 Durability. Repeated operational use shall not cause the components to leak, fracture, deform or undergo dimensional changes that prevent acceptable performance or prevent interfa

27、cing with associated assemblies/components. 3.4.4 Weight. The weight of the FSC components shall not exceed the weights specified in table I. 3.4.5 Interoperability and interchanpeability. The components listed in table I shall be functionally interoperable and physically interchangeable with compon

28、ents of the currently fielded Food Sanitation Center. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-PRF-44330B 9979906 2025530 939 m MIL-PRF-44330B (GL) 3.5 Environmental requirements. The components listed in table I shall operate and be fu

29、nctional in ambient temperatures from -25F to +125F. 4. VERIFICATION 4.1 Classifications of inspections. The inspection requirements specified herein are classified as first article inspection and conformance inspection. 4.1.1 First article inspection. When a first article inspection is required (se

30、e 3.1 and 6.2), the first article shall be examined and tested in accordance with table II. Sampling for fxst article inspection shall be as specified in the contract or purchase order (see 6.2). TABLE II. Matrix - Requirements vs Verification Methods Title Requirement 3.3 3.3.1 3.3.2 3.3.3 Verifica

31、tion 4.3.2 4.3.2.1 4.3.2.2 Operating requirements Sink size Sink drain 4.3.2.3 Sink interface Sink modularity Sink heating Sink drainage Sink leakage 3.3.4 4.3.2.4 3.3.5 4.3.2.5 3.3.6 4.3.2.6 3.3.7 4.3.2.7 Sink cover 3.3.8 4.3.2.8 Sink cover, handle 3.3.9 3.3.10 3.3.11 4.3.2.9 Thermometer bracket 4.

32、3.2.10 Hoses, drain 4.3.2.1 1 Hose, drain, drainage and leakage 3.3.12 4.3.2.12 4.3.2.13 Table, drain, size and configuration 3.3.13 I 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-44330B (GL) Rack set, storage and drying Component corros

33、ion Chemical resistance Safety SanitatiodCleaning Ownership and support requirements Shelf life Title Table, drain, drainage Rack, sink, immersion, size and configuration 3.3.17 4.3.2.17 3.3.18 4.2.3.18 3.3.19 4.3.2.19 3.3.20 4.3.2.20 3.3.21 4.3.2.21 3.4 4.3.3 3.4.1 4.3.3.1 Requirement 3.5 3.3.14 3.

34、3.15 4.3.4 Verification 4.3.2.14 4.3.2.1 5 I Rack, sink, immersion, drainage I 3.3.16 14.3.2.16 I I Service life I 3.4.2 14.3.3.2 I I Durability I 3.4.3 I 4.3.3.3 I I Weight I 3.4.4 I 4.3.3.4 I Interoperability and interchangeability Environmental recmirements 3.4.5 14.3.3.5 I 4.1.2 Conformance insr

35、iection. Conformance inspection includes those examinations and tests from table II, as defined in the contract or purchase order, performed on specified samples (see 6.2 and 6.7). 4.1.3 Certification comriliance examination. Certification, certified test reports, labels, or listing marks for standa

36、rds, submitted as proof of compliance with 3.2 and 4.3.3 shall be examined and validated (see 6.2). 4.2 Order of verification. Environmental tests shall be conducted prior to remaining verifications which may be conducted in any sequence. Sink and hose drainage and leakage tests and quick-disconnect

37、 tests may be combined. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-44330B 9979906 2025532 701 W MIL-PRF-44330B (GL) 4.3 Verification methods. The types of verification methods may be visual inspection, measurement, sample tests, full-s

38、cale demonstration tests, simulation, modeling, engineering evaluation, component properties analysis, and similarity to previously-approved or previously- qualified designs. 4.3.1 Verification alternatives. The manufacturer may propose alternative test methods, techniques, or equipment, including t

39、he application of statistical process control, tool control, or cost-effective sampling procedures to veri performance. The contract may speci alternatives that replace verifications required by this specification (see 6.2) 4.3.2 OperatinP reauirements verification. 4.3.2.1 Sink size measurement Mea

40、sure and veri the interior dimensions of the sink. 4.3.2.2 Sink drain inspection. Visually inspect for a drain, a drain ball-valve and a quick- disconnect coupling. 4.3.2.3 Sink interface demonstration. Demonstrate that the sink can be securely mounted on the burner rack. Demonstrate that the drain

41、hose coupling can be connected to and disconnected fiom the sink drain in less than 1 minute. 4.3.2.4 Sink modularity demonstration. Demonstrate that three sinks can be joined together. Verify that the sink joining method does not allow leakage between the sinks. 4.3.2.5 Sink heating demonstration.

42、Demonstrate sink heating capability by mounting the sink on the burner and base racks and filling the sink with 20 gallons of water. The temperature of the water shall be 60F 2 5F. Ambient temperature during testing shall be 70F & 10F and wind velocity shall be not more than 2 mph. Sink water shall

43、be heated to 125F in not more than 25 minutes and then to 1 70F in not more than an additional 20 minutes. Veri the sink does not have damage caused by burner heat. 4.3.2.6 Sink drainage demonstration. Demonstrate the drainage capability of the sink by filling the sink with 20 gallons of water. Atta

44、ch a 1-sink drain hose assembly to the sink drain coupling. Open the sink drain valve completely. The water shall drain fiom the sink to a level less than 3/4 inch deep in 6 minutes or less. 4.3.2.7 Sink leakage inspection. Visually inspect the sink during and subsequent to the heating and drainage

45、demonstrations. Veri that leakage has not occurred. 4.3.2.8 Sink cover functional demonstration. Demonstrate that the cover, when placed on the sink, is restricted in lateral movement in any direction. Visually inspect the covedsink interface configuration and veri that it will minimize splashing an

46、d the escape of steam. 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-44330B = 9999906 2025533 b48 m # MIL-PW-44330B (GL) 4.3.2.9 Sink cover handle measurement. Measure and ven the handle dimensions. 4.3.2.1 O Thermometer bracket functiona

47、l demonstration. Demonstrate that the thermometer bracket affixed to the fi-ont of a sink will place the thermometer (see 6.9) in a position to measure the temperature of sink contents when the sink is filled to within 2 inches fiom the top. Veri that the bracket will not interfere with washing oper

48、ations. 4.3.2.1 1 Hose. drain. interface demonstration. Demonstrate that the hose quick-disconnect couplings can be connected to the quick-disconnect couplings of the drain valve of the sinks in less then 1 minute. Measure the common 3-sink drain hose length and verifj that it extends not less than

49、50 feet from the sink. Measure the length of the 1-sink drain hose and veri that it extends not less than 15 feet fi-om the sink. 4.3.2.12 Hose. drain. drainage and leakage demonstration. Demonstrate the rate of drainage with the 3-sink drain hose connected to the sinks. Each sink shall be filled with 20 gallons of water. The sink drain valves shall be

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1