ASTM C1611 C1611M-2009b Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf

上传人:刘芸 文档编号:465295 上传时间:2018-11-27 格式:PDF 页数:6 大小:261.60KB
下载 相关 举报
ASTM C1611 C1611M-2009b Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf_第1页
第1页 / 共6页
ASTM C1611 C1611M-2009b Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf_第2页
第2页 / 共6页
ASTM C1611 C1611M-2009b Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf_第3页
第3页 / 共6页
ASTM C1611 C1611M-2009b Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf_第4页
第4页 / 共6页
ASTM C1611 C1611M-2009b Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: C 1611/C 1611M 09bStandard Test Method forSlump Flow of Self-Consolidating Concrete1This standard is issued under the fixed designation C 1611/C 1611M; the number immediately following the designation indicates theyear of original adoption or, in the case of revision, the year of last r

2、evision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This test method covers the determination of slump flowof self-consolidating concrete.1.2 The values stated in either SI un

3、its or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two systems may result in non-conformancewith the standard.1.3 The text of this sta

4、ndard references notes and footnotesthat provide explanatory material. These notes and footnotes(excluding those in tables and figures) shall not be consideredas requirements of the standard.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It

5、is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WARNINGFresh hydraulic cementitious mixtures are caustic and maycause chemical burns to skin and tissue upon prolongedexpo

6、sure.2)2. Referenced Documents2.1 ASTM Standards:3C 125 Terminology Relating to Concrete and ConcreteAggregatesC 143/C 143M Test Method for Slump of Hydraulic-Cement ConcreteC 172 Practice for Sampling Freshly Mixed ConcreteC 173/C 173M Test Method for Air Content of FreshlyMixed Concrete by the Vol

7、umetric MethodC 670 Practice for Preparing Precision and Bias Statementsfor Test Methods for Construction Materials3. Terminology3.1 For definitions of terms used in this test method, refer toTerminology C 125.3.2 Definitions of Terms Specific to This Standard:3.2.1 halo, nan observed cement paste o

8、r mortar ring thathas clearly separated from the coarse aggregate, around theoutside circumference of concrete after flowing from the mold.3.2.2 spread, nthe distance of lateral flow of concreteduring the slump-flow test.3.2.3 stability, nthe ability of a concrete mixture to resistsegregation of the

9、 paste from the aggregates.3.2.4 viscosity, nresistance of a material to flow under anapplied shearing stress.4. Summary of Test Method4.1 A sample of freshly mixed concrete is placed in a moldeither in the upright or inverted position. The concrete is placedin one lift without tamping or vibration.

10、 The mold is raised, andthe concrete is allowed to spread. After spreading ceases, twodiameters of the concrete mass are measured in approximatelyorthogonal directions. Slump flow is the average of the twodiameters.5. Significance and Use5.1 This test method provides a procedure to determine theslum

11、p flow of self-consolidating concrete in the laboratory orthe field.5.2 This test method is used to monitor the consistency offresh, unhardened self-consolidating concrete and its uncon-fined flow potential.5.3 It is difficult to produce self-consolidating concrete thatis both flowable and nonsegreg

12、ating using coarse aggregateslarger than 25 mm 1 in. Therefore, this test method isconsidered applicable to self-consolidating concrete havingcoarse aggregate up to 25 mm 1 in. in size. Appendix X1provides non-mandatory visual rating criteria that may be used1This test method is under the jurisdicti

13、on of ASTM Committee C09 onConcrete and Concrete Aggregates and is the direct responsibility of SubcommitteeC09.47 on Self-Consolidating Concrete.Current edition approved Aug. 1, 2009. Published September 2009. Originallyapproved in 2009. Last previous edition approved in 2009 as C 1611/C 1611M 09a.

14、2Section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol. 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to t

15、he standards Document Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.to classify the ability of a self-consolidating concrete mixturet

16、o resist segregation (stability).5.4 The rate at which the concrete spreads is related to itsviscosity. Appendix X1 provides a non-mandatory procedurethat may be used to provide an indication of relative viscosityof self-consolidating concrete mixtures.6. Apparatus6.1 MoldThe mold used in this test

17、method shall conformto that described in Test Method C 143/C 143M.6.2 Base PlateAnonabsorbent, smooth, rigid plate havinga minimum diameter of 915 mm 36 in. (See Note 1).NOTE 1Field experience and results from the round robin testprogram have shown that base plates made from sealed/laminatedplywood,

18、 acrylic plastic, or steel are suitable for performing this test.6.3 Strike-off BarAs described in Test Method C 173/C 173M.6.4 Measuring DeviceA ruler, metal roll-up measuringtape, or similar rigid or semi-rigid measuring instrumentmarked in increments of 5 mm 14 in. or less.7. Sample7.1 The sample

19、 of concrete from which test specimens aremade shall be representative of the entire batch. It shall beobtained in accordance with Practice C 172.8. Procedure8.1 Perform the test on a flat, level, nonabsorbent surfacesuch as a concrete floor or a base plate. Use the base plate inconditions where a f

20、lat, level surface is not available, such ason a construction site. When the base plate is used, position andshim the base plate so that it is fully supported, flat, and level.Pre-moisten the work surface or base plate with a damp towel,rag, or sponge.8.1.1 When performing the slump flow test for a

21、given studyor project, do not change the base plate surface type for theduration of the study or project.8.2 Filling the Mold: Fill the mold by following eitherProcedure A or Procedure B (See Note 2).8.2.1 Filling Procedure A (Upright Mold): Dampen themold and place it on the work surface, or center

22、ed on the baseplate, with the larger opening facing down. Hold the moldfirmly in place during filling by standing on the two footpieces. Fill the mold in a continuous manner (See Note 3).Overfill the mold slightly above its top.8.2.2 Filling Procedure B (Inverted Mold): Dampen themold and place it o

23、n the work surface, or centered on the baseplate, with the smaller opening facing down (See Note 4). Fillthe mold in a continuous manner (See Note 3). Overfill themold slightly above its top.NOTE 2During the development of this test method, it was found thatsome of the users preferred to perform the

24、 test with the large opening ofthe mold facing down as is performed in Test Method C 143/C 143M. Theprovision of a collar to the top of the mold is useful to reduce theprobability of concrete spilling over the mold and on to the base plate.Other users preferred to place the mold with the smaller ope

25、ning facedown, which facilitates the ease of filling. Both filling procedures havebeen found to be suitable when performing this test. The precisionstatement in Section 10 reflects the use of both procedures. Test data usingthe two filling procedures can be obtained in the round robin test reportava

26、ilable from ASTM headquarters.NOTE 3Filling the mold with concrete by using multiple scoops or bypouring from a bucket or similar container has been found to beacceptable.NOTE 4As a precaution, when filling the mold in the inverted position,the mold may be supported to prevent accidental movement or

27、 tipping.Experienced users of this test method have found that it is not necessaryto support the mold.8.3 Strike off the surface of the concrete level with the topof the mold by a sawing motion of the strike-off bar. Removeconcrete from the area surrounding the base of the mold topreclude interferen

28、ce with the movement of the flowingconcrete. Remove the mold from the concrete by raising itvertically. Raise the mold a distance of 225 6 75 mm 9 6 3in. in 3 6 1 s by a steady upward lift with no lateral ortorsional motion. Complete the entire test from the start offilling through removal of the mo

29、ld without interruption withinan elapsed time of 212 min.8.4 Wait for the concrete to stop flowing and then measurethe largest diameter (d1) of the resulting circular spread ofconcrete. When a halo is observed in the resulting circularspread of concrete, it shall be included as part of the diametero

30、f the concrete. Measure a second diameter (d2) of the circularspread at an angle approximately perpendicular to the firstmeasured diameter (d1). Measure the diameters to the nearest 5mm 14 in. Determine the Slump flow in accordance withSection 9.8.5 If the measurement of the two diameters differs by

31、 morethan 50 mm 2 in., the test is invalid and shall be repeated.9. Calculation9.1 Calculate the slump flow using Eq 1:Slump flow 5d11 d2!/2 (1)where:d1= the largest diameter of the circular spread of theconcrete, andd2= the circular spread of the concrete at an angle approxi-mately perpendicular to

32、 d19.2 Record the average of the two diameters to the nearest10 mm 12 in.10. Report10.1 Report the filling procedure (A or B) used.10.2 Report the slump flow to the nearest 10 mm 12 in.11. Precision and Bias11.1 The precision of this test method was determined basedon the results obtained from a rou

33、nd robin test programconducted by members of the ASTM C09.47 subcommittee onJanuary 9, 2003. The round robin test program consisted ofusing single and multiple operators performing 3 replicas of thetest using the mold in both the upright and inverted positions.The tests were performed using self-con

34、solidating concretewith high and low levels of slump flow and on stable andunstable mixes. Complete details of the round robin testprogram are available from ASTM headquarters in a reportentitled “Report on Development of a Precision Statement forthe Slump Flow Test Method for Self-Consolidating Con

35、crete.”C 1611/C 1611M 09b211.2 Single-Operator PrecisionThe single-operator preci-sion statement reflects the use of both procedures A and B. Thesingle-operator standard deviation for slump flow has beenfound to be 27 mm 1.1 in. (See Note 5) for mixtures havingslump flow values between approximately

36、 480 and 680 mm 19and 27 in. Therefore, results of two properly conducted testsby the same operator on the same batch of concrete should notdiffer by more than 75 mm 3.0 in. (See Note 5).11.3 Multi-Operator PrecisionThe multi-operator preci-sion statement reflects the use of both procedures A and B.

37、 Themulti-operator standard deviation for slump flow has beenfound to be 27 mm 1.1 in. (See Note 5) for mixtures withslump flow values between approximately 530 and 740 mm 21and 29 in. Therefore, the results of properly conducted testsby two operators on the same batch of concrete should notdiffer b

38、y more than 75 mm 3.0 in. (See Note 5).NOTE 5These numbers represent, respectively, the (1s) and (d2s)limits as described in Practice C 670.11.4 BiasThe procedure used in this test method has nobias since slump flow is defined only in terms of this testmethod.12. Keywords12.1 halo; self-consolidatin

39、g concrete; slump flow; spread;stability; viscosity; visual stability indexAPPENDIX(Nonmandatory Information)X1. RELATIVE MEASURE OF FLOW RATE, VISCOSITY, AND STABILITYX1.1 The flow rate of a self-consolidating concrete mixtureis influenced by its viscosity. Hence, for the purpose ofdeveloping a sel

40、f-consolidating concrete mixture in the labo-ratory, a relative measure of viscosity is useful. When perform-ing the slump flow test, the time it takes for the outer edge ofthe concrete mass, to reach a diameter of 500 mm 20 in. fromthe time the mold is first raised, provides a relative measure ofth

41、e unconfined flow rate of the concrete mixture. For similarmaterials, this time period, termed T50, gives an indication ofthe relative viscosity of the self-consolidating concrete mix-ture.NOTE X1.1The T50value can provide information on the flowproperties of the self-consolidating concrete mixture,

42、 whereby longervalues normally correspond to increased viscosity. Special high-rangewater-reducing admixtures are typically used to modify the flow proper-ties of the self-consolidating concrete mixture. In addition, viscosity-modifying admixtures and other changes in mixture proportions andmaterial

43、s can also influence flow properties and resistance to segregation.X1.2 The stability of self-consolidating concrete can beobserved visually by examining the concrete mass and there-fore can be used for quality control of self-consolidatingconcrete mixtures. Table X1.1 contains Visual Stability Inde

44、x(VSI) values with corresponding criteria to qualitatively assessthe stability of self-consolidating concrete. However, thesevalues do not quantify a concrete property.X1.3 Apparatus:X1.3.1 Inscribed base plate - a base plate as described in6.2, with a circular mark centrally located for the placeme

45、nt ofmold, and a further concentric circle at 500 mm 20 in.NOTE X1.2The centrally located circular mark made at the 500 mm20 in. location on the base plate will assist the user in determining theT50value.X1.3.2 Stop watch least reading of not more than 0.01 s.X1.4 Procedure:X1.4.1 To determine T50,

46、use a stopwatch to measure thetime in seconds it takes any part of the outer edge of thespreading concrete to reach the inscribed mark on the baseplate from the time the mold is first lifted.X1.4.2 After spreading of the concrete has stopped, visuallyinspect the concrete mixture by observing the dis

47、tribution ofthe coarse aggregate within the concrete mass the distributionof the mortar fraction particularly along the perimeter, and thebleeding characteristics. Assign a Visual Stability Index (VSI)value to the concrete spread using the criteria shown in TableX1.1 and illustrated in Figs. X1.1-X1

48、.4.X1.5 Recording:X1.5.1 Record T50to the nearest 0. 2 second.X1.5.2 Record the VSI value.TABLE X1.1 Visual Stability Index ValuesVSI Value Criteria0 = Highly Stable No evidence of segregation or bleeding.1 = Stable No evidence of segregation and slight bleeding observedas a sheen on the concrete ma

49、ss.2 = Unstable A slight mortar halo # 10 mm # 0.5 in. and/or aggregatepile in the of the concrete mass.3=HighlyUnstableClearly segregating by evidence of a large mortar halo 10 mm 0.5 in. and/or a large aggregate pile in thecenter of the concrete mass.C 1611/C 1611M 09b3FIG.X1.1VSI=0Concrete Mass is Homogeneous and NoEvidence of Bleeding.FIG.X1.2VSI=1Concrete Shows Slight Bleeding Observed asa Sheen on the Surface.C 1611/C 1611M 09b4FIG.X1.3VSI=2Evidence of a Mortar Halo and Water Sheen.FIG.X1.4VSI=3

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1