ASTM D7000-2008 809 Standard Test Method for Sweep Test of Bituminous Emulsion Surface Treatment Samples《含沥青乳化表面处理样品的扫除测试的试验方法》.pdf

上传人:appealoxygen216 文档编号:524208 上传时间:2018-12-04 格式:PDF 页数:4 大小:133.51KB
下载 相关 举报
ASTM D7000-2008 809 Standard Test Method for Sweep Test of Bituminous Emulsion Surface Treatment Samples《含沥青乳化表面处理样品的扫除测试的试验方法》.pdf_第1页
第1页 / 共4页
ASTM D7000-2008 809 Standard Test Method for Sweep Test of Bituminous Emulsion Surface Treatment Samples《含沥青乳化表面处理样品的扫除测试的试验方法》.pdf_第2页
第2页 / 共4页
ASTM D7000-2008 809 Standard Test Method for Sweep Test of Bituminous Emulsion Surface Treatment Samples《含沥青乳化表面处理样品的扫除测试的试验方法》.pdf_第3页
第3页 / 共4页
ASTM D7000-2008 809 Standard Test Method for Sweep Test of Bituminous Emulsion Surface Treatment Samples《含沥青乳化表面处理样品的扫除测试的试验方法》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: D 7000 08Standard Test Method forSweep Test of Bituminous Emulsion Surface TreatmentSamples1This standard is issued under the fixed designation D 7000; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last r

2、evision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method measures the curing performancecharacteristics of bituminous emulsion and aggregates bysimulating the broom

3、ing of a surface treatment in the labora-tory.1.2 The values stated in SI units are to be regarded asstandard. No other units of measurement are included in thisstandard.1.3 A precision and bias statement for this standard has notbeen developed at this time. Therefore, this standard should notbe use

4、d for acceptance or rejection of a material for purchasingpurposes.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the ap

5、plica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C 127 Test Method for Density, Relative Density (SpecificGravity), and Absorption of Coarse AggregateD 8 Terminology Relating to Materials for Roads and Pave-mentsD75 Practice for Sampling AggregatesD 140

6、Practice for Sampling Bituminous MaterialsD 226 Specification for Asphalt-Saturated Organic FeltUsed in Roofing and WaterproofingD 977 Specification for Emulsified AsphaltD 2397 Specification for Cationic Emulsified Asphalt2.2 ISSA Document:3ISSATechnical Bulletin No. 100 Test Method for Wet TrackAb

7、rasion of Slurry Surfaces3. Summary of Test Method3.1 The sweep test is effective for defining the film forma-tion stage of bituminous emulsions. A brush (designed toclosely replicate the sweeping action of a broom) exerts a forceon the aggregate used on surface treatments. Bituminousemulsion is app

8、lied to an asphalt felt disk.Aggregate is appliedand embedded into the bituminous emulsion. The sample isthen conditioned at a prescribed temperature and time periodbefore testing. A mixer abrades the surface of the sample usinga nylon brush.After one minute of abrasion, the test is stopped,any loos

9、e aggregate is removed, and the percent mass loss iscalculated.4. Significance and Use4.1 This test method is useful for classifying rapid-settingbituminous emulsions and is applicable to surface treatmentsthat require a quick return to traffic. It has the capability topredict surface treatment perf

10、ormance in the formative stageusing construction components. This performance test is in-tended to evaluate the potential curing characteristics of abinder-aggregate combination to ensure that the surface treat-ment is sufficiently cured before allowing traffic onto the seal.5. Apparatus5.1 Mixer4Us

11、e to abrade the sample.5.2 Quick-clamp Mounting Base5This base must be anadequate and level support for clamping the sample in place.The test sample should not move during abrasion.5.3 PanAn appropriate pan will contain the test sampleon the mixer and hold dislodged aggregate.1This test method is un

12、der the jurisdiction of ASTM Committee D04 on Roadand Paving Materials and is the direct responsibility of Subcommittee D04.24 onBituminous Surface Treatments.Current edition approved July 1, 2008. Published July 2008. Originally approvedin 2004. Last previous edition approved in 2004 as D 7000 04.2

13、For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from International Slurry Surfacing Association (IS

14、SA), 3 ChurchCircle, PMB 250, Annapolis, MD 21401, http:/www.slurry.org.4The sole source of supply of the Hobart Mixer13 H.P. Fixed Speed Motor,model A 120, apparatus known to the committee at this time is Hobart Corporation,701 S. Ridge Ave., Troy, OH 45374, http:/. If you are awareof alternative s

15、uppliers, please provide this information to ASTM InternationalHeadquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee,1which you may attend.5The sole source of supply of the Wet Track Abrasion Tester (ISSA TB100)apparatus known to the commit

16、tee at this time is Mastrad Limited, Finch House, 25Finch Road, Douglas, United Kingdom IM1 2PS, http:/. If youare aware of alternative suppliers, please provide this information to ASTMInternational Headquarters. Your comments will receive careful consideration at ameeting of the responsible techni

17、cal committee,1which you may attend.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5.4 OvenThe conditioning oven shall be a constant tem-perature forced draft oven meeting the following requirementscontaining shelves with at least 6

18、5 % voids. The shelves shallbe placed at least 120 mm apart and 100 mm away from the topand floor.Oven Type Forced draft ovenMin Inside D 3 W 3 H 460 3 460 3 460 mmAccuracy 61.0C5.5 BalanceA balance capable of weighing 800 g or moreto within 60.1 g.Aminimum platform length and width of 240mm is requ

19、ired.5.6 Removable Brush HolderThe brush holder shall beattachable to the mixer and capable of a free floating verticalmovement of 19 6 1 mm having the dimensions listed in Fig.1. A drawing of this apparatus can be seen in Fig. 1. The totalweight of the brush head and the attached weight shall weigh

20、1500 6 15 g. The collar and nylon strip brush are not includedin this weight. The brush clamping system shall hold the nylonstrip brush in place so that it will not move or dislodge duringtesting.5.7 Nylon Strip Brush6The brush shall conform to thefollowing specifications.Overall Trim 25.4 mmOverall

21、 Length 127 6 1mmBacking Size #7Fill Material Crimped black nylonNylon Type 6.0Fill Diameter 0.254 mmWeight 35 6 2g5.8 Strike-off TemplateThe template should consist of aflat, stainless steel metal plate. It shall include a 280 6 3mmdiameter cut out with a flush edge. A 16 gage U.S. Standard(Plate a

22、nd Sheet Metal) will suffice in most cases.NOTE 1Emulsion mass may vary according to emulsion viscosity andapplied strike off pressure. Alternative gages may be necessary foremulsion mass correction for varying aggregate sizes and shapes.5.9 Strike-off RodThe 750 6 100 mm rod shall be madeof 8 mm el

23、ectrical conduit for striking off emulsion from thetemplate surface.5.10 Sweep Test CompactorA suitable compaction devicewith a minimum curved surface radius of 550 6 30 mm andshall weigh 7500 6 500 g. A picture of this apparatus can beseen in Fig. 2.6. Materials6.1 Bituminous EmulsionThe bituminous

24、 emulsionshould meet all applicable specifications for the surface treat-ment application. The bituminous emulsion shall be equili-brated to a temperature of 60C for sample production.6.2 AggregatesThe job aggregates should be sampled andsplit according to Practice D75. They shall be placed in anove

25、n and dried to a constant weight. The aggregates shall bedry sieved to obtain a test sample that has 100 % passing the9.5 mm sieve and 1 % passing the 4.75 mm sieve. Theamount of aggregate used for each specimen shall be inaccordance to the equation below and can be seen by theexample in Table 1. Th

26、e aggregate amount shall be interpolatedbetween values when necessary, and with a tolerance of 61%.A 202.1X 2 15.8!1001B 146.4X 2 4.7!1005 Y (1)where:A = % of aggregate from 9.5 to 6.3 mm,B = % of aggregate from 6.3 to 4.75 mm,X = bulk specific gravity (BSG), andY = amount of aggregate needed for th

27、e sweep test, g.6.3 Asphalt Felt DiskProduce sample disks from 30 lbasphalt felt paper, Specification D 226, Type II. The asphalt feltdiscs shall not have breaks, cracks, tears, protuberances,indentations, or splices. The felt shall be cut to make 300 6 10mm diameter disks. The disks shall be placed

28、 in a 50C ovenfor 24 to 72 h to flatten. Manipulate the disks until they are flatand store at room temperature at least three days before use.7. Test Specimens7.1 Weigh the asphalt felt disk to the nearest 0.1 g andrecord as the asphalt sample disk weight. Place the asphalt feltdisk on a flat table.

29、 Manipulate the felt disk so that it lies flatagainst the surface. Replace the disk if the edges curl or bubbleor the disk contains foreign matter. Pre-weigh the aggregateand record as aggregate weight (see Table 1 for proper amountsof aggregate). A strike-off template is placed over the felt disk,c

30、entering the hole of the template over the felt disk. 83 6 5gof bituminous emulsion (application rate of 1.42 kg/m2)at60C is poured along the top arc of the exposed felt disk.6The sole source of supply of the Nylon Strip Brush Part #MB7006 apparatusknown to the committee at this time is Tanis Incorp

31、orated, 3660 Kettle Court E.,Delafield, WI 53018, http:/. If you are aware of alternativesuppliers, please provide this information to ASTM International Headquarters.Your comments will receive careful consideration at a meeting of the responsibletechnical committee,1which you may attend.DimensionsI

32、D Name mmA Collar diameter 36B Collar height 76C Brush head length 128D Overall brush head height 19E Groove height 17F Groove width 18H Slot height 19W Slot width 7FIG. 1 Brush HolderD7000082Excess bituminous emulsion is removed with the strike-off rodin a gentle side-to-side continuous motion. Thi

33、s shall becompleted within a 3 6 1 s period. The strike-off motionshould not be stopped until the excess materials are off of thefelt disk. The template is quickly removed. A picture of thisprocedure can be seen in Fig. 3.NOTE 2Downward pressure, strike-off speed, and template thicknesscan be adjust

34、ed to ensure correct emulsion mass.7.2 Immediately apply the pre-weighed aggregate sampleonto the bituminous emulsion using an even back and forthmotion. Once the aggregate has been placed on the sample,compact the aggregates using the sweep test compactor threehalf cycles in one direction and three

35、 half cycles in aperpendicular direction to set the aggregate. Care should betaken not to apply any additional manual downward force tothe compactor. Immediately weigh the sample and record assample weight. Place the specimen in the forced draft oven.Sample production and weighing shall take no more

36、 than fourminutes.8. Conditioning8.1 The specimen is immediately placed in a forced draftoven for the specified time, temperature, and relative humiditybased on desired field performance.NOTE 3Typical testing parameters for a rapid return to traffic andquick brooming of the product have been a time

37、of one hour at 35C and30 % relative humidity. These values vary based on different climate areasof product application.8.1.1 The time and oven temperature shall be kept to atolerance of 10 % of the desired values. The tolerance of therelative humidity shall be 25 % of the desired value unlessotherwi

38、se specified.NOTE 4The oven door should only be opened once within a 20 minperiod to maintain constant curing conditions.8.2 At the end of the conditioning time, the specimen isturned vertically and any loose aggregate is removed by gentlehand brushing of the technicians fingers back and forth acros

39、sthe sample. The specimen is then weighed, and the weightrecorded to the nearest 0.1 g as the initial specimen weight. Thetime from conditioning oven to being placed in the testapparatus should be no greater than two minutes.NOTE 5The hand brushing of the technicians fingers across thesample has pro

40、ven to be the preferred method versus a brush for removingany loose aggregate that has not fallen off when the specimen is turnedvertically.9. Procedure9.1 Attach, then leave the specimen in the clamping devicefor 180 6 30 s. During the equilibration time, the brush issecured into the brush head and

41、 the brush head with the weightis attached to the mixer.At the end of the equilibrating time, thebrush head is put into contact with the sample making surethere is free floating vertical movement of the brush head. Themixer is then turned onto Setting #1 (0.83 gyrations persecond) for 60 s. After th

42、e brush head has come to a completestop, the table is lowered and the sample is removed from theclamping device. The specimen is held vertically and any looseaggregate is removed by gentle hand brushing of the techni-cians fingers back and forth across the sample (see Note 5).The abraded sample is w

43、eighed to the nearest 0.1 g andrecorded as final specimen weight. A picture of this procedurecan be seen in Fig. 4.10. Calculation10.1 This equation represents the total mass loss based onthe initial aggregate sample weight. The mass loss as apercentage of the area exposed to the abrading force:% Ma

44、ss Loss 5SA 2 BA 2 CD3 100 3 1.33 (2)where:A = initial specimen weight,B = final specimen weight, andC = asphalt sample disk weight.11. Precision and Bias11.1 The appropriate number of labs required to do anadequate precision statement is not available at this time. Forthe initial samples tested, th

45、e repeatability standard deviationwas 15 % of the measured loss. Results were from repeatedFIG. 2 Sweep Test CompactorTABLE 1 ExampleBSG100 %6.3to4.75mm50/50 Blend100 %9.5to6.3mm2.00 288 g 338 g 388 g2.25 325 g 382 g 439 g2.50 361 g 425 g 489 g2.75 398 g 469 g 540 g3.00 435 g 513 g 591 gFIG. 3 Emuls

46、ion Strike-Off In TemplateD7000083tests on two different emulsions with different types of emul-sifiers and varying curing conditions. Twenty replicates wererun so that the results would be of statistical significance. Theaverage loss for each sample run was reported along with thestandard deviation

47、 reported as a percentage of the average loss.11.2 No information can be presented on the bias formeasuring percent mass loss in this test method because nomaterial having an acceptable reference value is available.12. Keywords12.1 aggregate; bituminous emulsion; surface treatment;sweepASTM Internat

48、ional takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely the

49、ir own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1