FORD ESB-M2P120-A-2000 PAINT PERFORMANCE - NON-VISIBLE CORROSION RESISTANT EPOXY POWDER COATINGS《油漆的性能 不可见耐腐蚀环氧树脂粉末涂料》.pdf

上传人:boatfragile160 文档编号:745331 上传时间:2019-01-14 格式:PDF 页数:3 大小:31.97KB
下载 相关 举报
FORD ESB-M2P120-A-2000 PAINT PERFORMANCE - NON-VISIBLE CORROSION RESISTANT EPOXY POWDER COATINGS《油漆的性能 不可见耐腐蚀环氧树脂粉末涂料》.pdf_第1页
第1页 / 共3页
FORD ESB-M2P120-A-2000 PAINT PERFORMANCE - NON-VISIBLE CORROSION RESISTANT EPOXY POWDER COATINGS《油漆的性能 不可见耐腐蚀环氧树脂粉末涂料》.pdf_第2页
第2页 / 共3页
FORD ESB-M2P120-A-2000 PAINT PERFORMANCE - NON-VISIBLE CORROSION RESISTANT EPOXY POWDER COATINGS《油漆的性能 不可见耐腐蚀环氧树脂粉末涂料》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2000 09 08 Revised Updated A. Cockman 1980 12 12 Released AL1 - 6000 - 217 Printed copies are uncontrolled Page 1 of 3 Copyright 2000, Ford Global Technologies, Inc. PAINT PERFORMANCE - NON-VISIBLE CORROSION

2、 RESISTANT, ESB-M2P120-A EPOXY POWDER COATINGS 1. SCOPE This specification defines the performance requirements for thermosetting epoxy powder coatings as applied to unprimed steel. The powder coating shall pro vide excellent corrosion resistance properties for non - visible applications. 2. APPLICA

3、TION This specification was released originally as a coating specified for bumper attachment and reinforcement components as an isolation coating between the steel com ponents and aluminum bumpers. 3. REQUIREMENTS Material specification requirements are to be used for initial qualification of materi

4、als. 3.1 QUALITY SYSTEM REQUIREMENTS Material suppliers and part producers must conform to the Companys Quality System Requirements. 3.2 SYSTEM COMPONENTS 3.2.1 Substrates CRLC, HRLC, HSLA steels. 3.2.2 Metal Preparation Zinc phosphate coating per ESB -M3P1 or iron phosphate coating per ESB - M3P2.

5、3.2.3 Powder Coating (Ref. para 5.1) A fully cure d single coating of thermosetting epoxy powder coating characteristic of the properties described in para 3.2 and 3.3. ENGINEERING MATERIAL SPECIFICATION ESB-M2P120-A Page 2 of 3 Copyright 2000, Ford Global Technologies, Inc. 3.3 FILM PROPERTIES 3.3.

6、1 Color Black (Unless specified otherwise) 3.3.2 Dry Film Thickness, min 0.003 in (FLTM BI 1 7 - 1) (76.2 micrometre) 3.3.3 Adhesion No flaking or chipping (FLTM BI 6 - 1) (Grade 0) 3.4 RESISTANCE PROPERTIES 3.4.1 Chip Resistance, max 4B (SAE J 400, 1 pt. (0.5L) of gravel) 3.4.2 Salt Spray Resistanc

7、e, min 240 h (FLTM BI 3 - 1) All parts shall be scribed prior to testing. Failure shall be defined as follows: . Rust, corrosion creepage, or loss of adhesion more than 1/8 in (3.2 mm) from the scribe line, near the edges or around holes. . Blistering or rust spot s in any areas. 3.5 FINISHED PARTS

8、3.5.1 This specification applies to finished parts which are defined as parts painted with the complete system including phosphate coating and powder coating as described in para 3.1. 3.5.2 When it is not feasible to test the actual part because of its size, laboratory panels may be substituted. Tes

9、t panels shall be processed concurrently with parts and shall be representative of parts with respect to substrate, phosphate coating, powder coating thickness and bake and all other operations. 3.5.3 All parts shall be aged 16 h at 43 C or 72 h above 23 +/ - 2 C before testing for resistance proper

10、ties. ENGINEERING MATERIAL SPECIFICATION ESB-M2P120-A Page 3 of 3 Copyright 2000, Ford Global Technologies, Inc. 3.5 SUPPLIERS RESPONSIBILITY All materials supplied to this specification must be equivalent in all character istics to the material upon which approval was originally granted. Prior to m

11、aking any changes to the material originally approved under this specification, whether or not such changes affect the materials ability to meet the specification requirements, the Supplier shall notify the affected Purchasing, and Materials Engineering activities (with reasons) of the proposed chan

12、ges. Upon notification of the Company, further instructions will be provided. Note: Suppliers should be prepared to provide test d ata and samples demonstrating compliance to this specification, if requested. Substance restrictions imposed by regulations or Company direction applies to the materials

13、 addressed by this document. The restrictions are identified in Restricted Substance Management Standard WSS - M99P9999 - A1. 4. APPROVAL OF SUPPLIERS: Materials defined by this specification for direct supply to the Company must have prior approval. Certain materials subcontracted by part suppliers

14、 may also require prior approval. These include materials critical to the Companys business for regulatory, safety, environmental or compatibility requirements or contractual agreements. Suppliers desiring approval of their materials shall first obtain an expression of interest from Purchasing , Des

15、ign or Materials Engineering activity. Upon request, the Supplier shall submit a completed copy of their laboratory test reports, signed by a qualified and authorized representative of the test facility, demonstrating full compliance with all the req uirements of this specification. 5. GENERAL INFOR

16、MATION: The information given below is provided for clarification and assistance in meeting the requirements of this specification. 5.1 MATERIAL REFERENCES ESB - M70J4 - Paint - Powdered, Thermosetting Epoxy Specific materials which can be used to meet this specification are released by the current CH - 499 chart. 5.2 PAINT PERFORMANCE SPECIFICATION REFERENCES ESB - M2P6 - Paint Performance, Underbody, Corrosion Resistance 240 h.

展开阅读全文
相关资源
猜你喜欢
  • EN 45510-3-1-1999 en Guide for Procurement of Power Station Equipment - Part 3-1 Boilers - Water Tube Boilers《发电站设备的采购指南 第3-1部分 锅炉 水管锅炉》.pdf EN 45510-3-1-1999 en Guide for Procurement of Power Station Equipment - Part 3-1 Boilers - Water Tube Boilers《发电站设备的采购指南 第3-1部分 锅炉 水管锅炉》.pdf
  • EN 45510-3-3-1999 en Guide for Procurement of Power Station Equipment - Part 3-3 Boilers - Boilers with Fluidized Bed Firing《发电站设备的采购指南 第3-3部分 锅炉 流化床燃烧锅炉》.pdf EN 45510-3-3-1999 en Guide for Procurement of Power Station Equipment - Part 3-3 Boilers - Boilers with Fluidized Bed Firing《发电站设备的采购指南 第3-3部分 锅炉 流化床燃烧锅炉》.pdf
  • EN 45510-4-1-1999 en Guide for Procurement of Power Station Equipment - Part 4 Boiler Auxiliaries - Section 1 Equipment for Reduction of Dust Emissions《发电站设备的采购指南 第4部分 锅炉辅助设备 第1节 减.pdf EN 45510-4-1-1999 en Guide for Procurement of Power Station Equipment - Part 4 Boiler Auxiliaries - Section 1 Equipment for Reduction of Dust Emissions《发电站设备的采购指南 第4部分 锅炉辅助设备 第1节 减.pdf
  • EN 45510-4-10-1999 en Guide for Procurement of Power Station Equipment - Part 4-10 Boiler Auxiliaries - Flue Gas Denitification (De-NOx) Plant《发电站设备的采购指南 第4-10部分 锅炉辅助设备 烟道气脱氮(DE-NO.pdf EN 45510-4-10-1999 en Guide for Procurement of Power Station Equipment - Part 4-10 Boiler Auxiliaries - Flue Gas Denitification (De-NOx) Plant《发电站设备的采购指南 第4-10部分 锅炉辅助设备 烟道气脱氮(DE-NO.pdf
  • EN 45510-4-2-1999 en Guide for Procurement of Power Station Equipment - Part 4 Boiler Auxiliaries - Section 2 Gas-Air Steam-Air and Gas-Gas Heaters《发电站设备的采购指南 第4部分 锅炉辅助设备 第2节 烟气-空气.pdf EN 45510-4-2-1999 en Guide for Procurement of Power Station Equipment - Part 4 Boiler Auxiliaries - Section 2 Gas-Air Steam-Air and Gas-Gas Heaters《发电站设备的采购指南 第4部分 锅炉辅助设备 第2节 烟气-空气.pdf
  • EN 45510-4-3-1999 en Guide for Procurement of Power Station Equipment - Part 4 Boiler Auxiliaries - Selection 3 Draught Plant《发电站设备的采购指南 第4部分 锅炉辅助设备 第3节 鼓风机设备》.pdf EN 45510-4-3-1999 en Guide for Procurement of Power Station Equipment - Part 4 Boiler Auxiliaries - Selection 3 Draught Plant《发电站设备的采购指南 第4部分 锅炉辅助设备 第3节 鼓风机设备》.pdf
  • EN 45510-4-4-2002 en Guide for procurement of power station equipment - Part 4-4 Boiler auxiliaries Fuel preparation equipment《发电站设备的采购指南 第4-4部分 锅炉辅助设备 燃料制备设备》.pdf EN 45510-4-4-2002 en Guide for procurement of power station equipment - Part 4-4 Boiler auxiliaries Fuel preparation equipment《发电站设备的采购指南 第4-4部分 锅炉辅助设备 燃料制备设备》.pdf
  • EN 45510-4-4-2002 en Guide for the Procurement of Power Station Equipment - Part 4-4 Boiler Auxiliaries - Fuel Preparation Equipment《电厂设备采置指南 第4-4部分 锅炉辅助设备 燃料制备设备》.pdf EN 45510-4-4-2002 en Guide for the Procurement of Power Station Equipment - Part 4-4 Boiler Auxiliaries - Fuel Preparation Equipment《电厂设备采置指南 第4-4部分 锅炉辅助设备 燃料制备设备》.pdf
  • EN 45510-4-5-2002 en Guide for procurement of power station equipment - Part 4-5 Boiler auxiliaries Coal handling and bulk storage plant《发电站设备的采购指南 第4-5部分 锅炉辅助设备 煤搬运和散货堆存》.pdf EN 45510-4-5-2002 en Guide for procurement of power station equipment - Part 4-5 Boiler auxiliaries Coal handling and bulk storage plant《发电站设备的采购指南 第4-5部分 锅炉辅助设备 煤搬运和散货堆存》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1