FORD FLTM BI 115-1-2001 COLOR MATCH AND INTERCOAT ADHESION FOR REPAIR ENAMELS (Replaces FLTM BI 015-01 FLTM EU-BI 015-01).pdf

上传人:孙刚 文档编号:747006 上传时间:2019-01-14 格式:PDF 页数:2 大小:36.11KB
下载 相关 举报
FORD FLTM BI 115-1-2001 COLOR MATCH AND INTERCOAT ADHESION FOR REPAIR ENAMELS (Replaces FLTM BI 015-01 FLTM EU-BI 015-01).pdf_第1页
第1页 / 共2页
FORD FLTM BI 115-1-2001 COLOR MATCH AND INTERCOAT ADHESION FOR REPAIR ENAMELS (Replaces FLTM BI 015-01 FLTM EU-BI 015-01).pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BI 115-01 Date Action Revisions 2001 03 19 Revised Editorial no technical change A. Cockman 1990 12 04 Printed copies are uncontrolled Page 1 of 2 Copyright 2001, Ford Global Technologies, Inc. COLOR MATCH AND INTERCOAT ADHESION FOR REPAIR ENAMELS Application This proced

2、ure is used to determine the acceptability of production enamels for repair color matching and intercoat adhesion of repair coat to original coat. Apparatus and Materials Required Mechanical Convection Oven Capable of maintaining a constant temperature of 180 +/- 2 C. Test Panels Steel body skin pan

3、els: Per ASTM D 609 or 150 x 300 mm having a surface finish of 1.35 - 0.45 microns Ra. Masking Tape and Paper Color Matching Device - according to FLTM BI 109-01. Reference Ford Laboratory Test Methods BI 103-02 Preparation of Panels for Paint Tests BI 106-02 Intercoat Adhesion Test BI 109-01 Color

4、Matching with Artificial Light Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise s

5、pecified. FORD LABORATORY TEST METHOD BI 115-01 Page 2 of 2 Copyright 2001, Ford Global Technologies, Inc. Procedure 1. Prepare a panel as described in FLTM BI 103-02, Method “C“. 2. Allow panel to cool to 23 +/- 2 C and rebake for ten minutes at 140 +/-2 C metal temperature or as specified in the E

6、ngineering Materials specification. Care must be taken to avoid touching the panel test surface with hands. 3. Allow panel to cool to 23 +/- 2 C and mask upper half of the panel and respray the unmasked area with the original material under identical conditions to a dry film thickness of 40 +/- 10 m

7、icrons. Remove masking paper and tape, flash-off test panel for 3 minutes and bake according to the Engineering Materials Specification. Evaluation 1. After cooling to room temperature, compare repaired area with the unrepaired area of the panel for color match with each other, according to FLTM BI

8、109-01. 2. Age repaired panel for 16 h at 45 +/- 2 C, or 72 h at 23 +/- 2 C and check intercoat adhesion according to FLTM BI 106-02. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.

展开阅读全文
相关资源
猜你喜欢
  • DL T 5457-2012 Technical code for the design of substation buildings and structures《变电站建筑结构设计技术规程》.pdf DL T 5457-2012 Technical code for the design of substation buildings and structures《变电站建筑结构设计技术规程》.pdf
  • DL T 5458-2012 Code of content profundity for working drawing design for transmission and distribution projects《变电工程施工图设计内容深度规定》.pdf DL T 5458-2012 Code of content profundity for working drawing design for transmission and distribution projects《变电工程施工图设计内容深度规定》.pdf
  • DL T 5459-2012 Technical code for the design of converter station buildings and structures《换流站建筑结构设计技术规程》.pdf DL T 5459-2012 Technical code for the design of converter station buildings and structures《换流站建筑结构设计技术规程》.pdf
  • DL T 546-2012 Operation management code for power line carrier communication《电力线载波通信运行管理规程》.pdf DL T 546-2012 Operation management code for power line carrier communication《电力线载波通信运行管理规程》.pdf
  • DL T 5460-2012 Technical code for designing station service of converter station《换流站站用电设计技术规定》.pdf DL T 5460-2012 Technical code for designing station service of converter station《换流站站用电设计技术规定》.pdf
  • DL T 5461 1-2012 Regulations for content and depth of detailed design documents of fossil-fired power plant - Part 1 General《火力发电厂施工图设计文件内容深度规定 第1部分 总的部分》.pdf DL T 5461 1-2012 Regulations for content and depth of detailed design documents of fossil-fired power plant - Part 1 General《火力发电厂施工图设计文件内容深度规定 第1部分 总的部分》.pdf
  • DL T 5461 10-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 10 Architecture《火力发电厂施工图设计文件内容深度规定 第10部分 建筑》.pdf DL T 5461 10-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 10 Architecture《火力发电厂施工图设计文件内容深度规定 第10部分 建筑》.pdf
  • DL T 5461 11-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 11 Civil structure《火力发电厂施工图设计文件内容深度规定 第11部分 土建结构》.pdf DL T 5461 11-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 11 Civil structure《火力发电厂施工图设计文件内容深度规定 第11部分 土建结构》.pdf
  • DL T 5461 12-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 12 HVAC《火力发电厂施工图设计文件内容深度规定 第12部分 采暖通风及空气调节》.pdf DL T 5461 12-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 12 HVAC《火力发电厂施工图设计文件内容深度规定 第12部分 采暖通风及空气调节》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1