GMW GMW16998-2013 Dust-Out From Fiber Sound Absorber Pad Issue 1 English.pdf

上传人:周芸 文档编号:757963 上传时间:2019-01-19 格式:PDF 页数:3 大小:153.33KB
下载 相关 举报
GMW GMW16998-2013 Dust-Out From Fiber Sound Absorber Pad Issue 1 English.pdf_第1页
第1页 / 共3页
GMW GMW16998-2013 Dust-Out From Fiber Sound Absorber Pad Issue 1 English.pdf_第2页
第2页 / 共3页
GMW GMW16998-2013 Dust-Out From Fiber Sound Absorber Pad Issue 1 English.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16998 Dust-Out From Fiber Sound Absorber Pad Copyright 2013 General Motors Company All Rights Reserved September 2013 Page 1 of 3 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conflict betwe

2、en the English and domestic language, the English language shall take precedence. 1.1 Purpose. This procedure describes a method for measurement of dust-out from fiber sound absorber pad. It applies to both needled and resin-bonded constructions and to unfaced as well as coated and film-covered mate

3、rials. 1.2 Foreword. Not applicable. 1.3 Applicability. This procedure is intended for use in assembly plants and/or production quality control. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. ISO 17025 ISO/TS 16

4、949 2.2 GM Standards/Specifications. None 2.3 Additional References. None 3 Resources 3.1 Facilities. Facilities must be certified to ISO 17025 and/or certified to ISO/TS 16949 and be acceptable to the responsible GM department. Supplier shall submit a letter of compliance. 3.1.1 Calibration. The te

5、st facilities and equipment shall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their phys

6、ical definition. 3.2 Equipment. 3.2.1 Cutting dye, 50 mm x 50 mm. 3.2.2 Cutting press. 3.2.3 Coated metal can with lid. 3.2.4 Air-circulating oven. 3.2.5 Balance that weighs in grams. 3.2.6 Low-pressure air line with nozzle opening 5 mm 0.5 mm. 3.2.7 Isopropyl alcohol. 3.2.8 Lint-free cloth. 3.3 Tes

7、t Vehicle/Test Piece. 3.3.1 Cut four (4) specimens using cutting press and cutting dye to 50 mm x 50 mm. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERI

8、NG STANDARDS GMW16998 Copyright 2013 General Motors Company All Rights Reserved September 2013 Page 2 of 3 Note: Do not disturb or remove any loose fibers or dust from samples after cutting. 3.4 Test Time. Not applicable. 3.5 Test Required Information. Not applicable. 3.6 Personnel/Skills. Not appli

9、cable. 4 Procedure 4.1 Preparation. 4.1.1 Place the four (4) test specimens in an air-circulating oven at 100 C for 1 h. 4.1.2 After 1 h at 100 C, remove specimens and immediately weigh each specimen to the nearest 0.01 g. 4.1.3 Moisten lint-free cloth with alcohol and wipe the inside of the metal c

10、an. Allow can to dry for 15 minutes. 4.1.4 Place four (4) specimens in the can and seal with lid. 4.1.5 Shake the can 150 times 2 times within 60 s. 4.1.6 Remove the specimens from the can. Holding the low-pressure air nozzle about 200 mm from each of the specimens, gently blow all loose material fr

11、om the specimens. 4.1.7 Place the four (4) specimens in an air-circulating oven for 1 h at 100 C. 4.1.8 After 1 h at 100 C, remove specimens and weigh each to the nearest 0.01 g. 4.2 Conditions. 4.2.1 Environmental Conditions. Not applicable. 4.2.2 Test Conditions. Deviations from the requirements o

12、f this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. 4.3 Instructions. Not applicable. 5 Data 5.1 Calculations. 5.1.1 Calculate the percent dust loss on each specimen per the following equation: 5.2 Interpretation o

13、f Results. Not applicable. 5.3 Test Documentation. Not applicable. 6 Safety This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to es

14、tablish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 7 Notes 7.1 Glossary. Not applicable. 7.2 Acronyms, Abbreviations, and Symbols. GSSLT Global Subsystem Leadership Team ISO International Organization for Standardization I ni t i a

15、l W ei gh t F i na l W ei gh t% D ust = _ _ _ _ _ x 100 I ni t i al W ei ghtCopyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16998 Copyrig

16、ht 2013 General Motors Company All Rights Reserved September 2013 Page 3 of 3 8 Coding System This standard shall be referenced in other documents, drawings, etc., as follows: Test to GMW16998 9 Release and Revisions This standard was originated in June 2013. It was first approved by the Trim Materi

17、als/Textiles/Leather/Foam Global Subsystem Leadership Team (GSSLT) in September 2013. It was first published in September 2013. Issue Publication Date Description (Organization) 1 SEP 2013 Initial publication. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ETSI TS 101 394-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 1 (GSM 02 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统(第2+阶段)_1.pdf ETSI TS 101 394-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 1 (GSM 02 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统(第2+阶段)_1.pdf
  • ETSI TS 101 395-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 2 (GSM 03 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统(第2+阶段).pdf ETSI TS 101 395-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 2 (GSM 03 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统(第2+阶段).pdf
  • ETSI TS 101 395-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 2 (GSM 03 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统(第2+阶段)_1.pdf ETSI TS 101 395-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 2 (GSM 03 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统(第2+阶段)_1.pdf
  • ETSI TS 101 396-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 3 (GSM 04 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统v第2+代) .pdf ETSI TS 101 396-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 3 (GSM 04 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统v第2+代) .pdf
  • ETSI TS 101 396-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 3 (GSM 04 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统v第2+代) _1.pdf ETSI TS 101 396-1999 Digital Cellular Telecommunications System (Phase 2+) Name Identification Supplementary Services Stage 3 (GSM 04 96 Version 7 0 0 Release 1998)《数字蜂窝通信系统v第2+代) _1.pdf
  • ETSI TS 101 402-2000 Digital Cellular Telecommunications System (Phase 2+) Support of Private Numbering Plan (SPNP) Service Description Stage 1《数字蜂窝通信系统(第2+阶段) 专用编号计划(SPNP)支持 业务描述 .pdf ETSI TS 101 402-2000 Digital Cellular Telecommunications System (Phase 2+) Support of Private Numbering Plan (SPNP) Service Description Stage 1《数字蜂窝通信系统(第2+阶段) 专用编号计划(SPNP)支持 业务描述 .pdf
  • ETSI TS 101 402-2000 Digital Cellular Telecommunications System (Phase 2+) Support of Private Numbering Plan (SPNP) Service Description Stage 1《数字蜂窝通信系统(第2+阶段) 专用编号计划(SPNP)支持 业务描述 _1.pdf ETSI TS 101 402-2000 Digital Cellular Telecommunications System (Phase 2+) Support of Private Numbering Plan (SPNP) Service Description Stage 1《数字蜂窝通信系统(第2+阶段) 专用编号计划(SPNP)支持 业务描述 _1.pdf
  • ETSI TS 101 413-2005 Digital cellular telecommunications system (Phase 2+) Subscriber Identity Module Application Programming Interface (SIM API) Stage 1 (3GPP TS 02 19 Version 8 1.pdf ETSI TS 101 413-2005 Digital cellular telecommunications system (Phase 2+) Subscriber Identity Module Application Programming Interface (SIM API) Stage 1 (3GPP TS 02 19 Version 8 1.pdf
  • ETSI TS 101 413-2005 Digital cellular telecommunications system (Phase 2+) Subscriber Identity Module Application Programming Interface (SIM API) Stage 1 (3GPP TS 02 19 Version 8 1_1.pdf ETSI TS 101 413-2005 Digital cellular telecommunications system (Phase 2+) Subscriber Identity Module Application Programming Interface (SIM API) Stage 1 (3GPP TS 02 19 Version 8 1_1.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1