[专升本类试卷]语法词汇练习试卷5及答案与解析.doc

上传人:brainfellow396 文档编号:911135 上传时间:2019-02-28 格式:DOC 页数:7 大小:31.50KB
下载 相关 举报
[专升本类试卷]语法词汇练习试卷5及答案与解析.doc_第1页
第1页 / 共7页
[专升本类试卷]语法词汇练习试卷5及答案与解析.doc_第2页
第2页 / 共7页
[专升本类试卷]语法词汇练习试卷5及答案与解析.doc_第3页
第3页 / 共7页
[专升本类试卷]语法词汇练习试卷5及答案与解析.doc_第4页
第4页 / 共7页
[专升本类试卷]语法词汇练习试卷5及答案与解析.doc_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、语法词汇练习试卷 5 及答案与解析一、Vocabulary and Structure1 I did not learn to drive_I was thirty-three years old and bought my own car.(A)not until(B) until(C) not till(D)till2 It was not until 1969_the American astronaut succeeded in landing on the moon.(A)which(B) then(C) when(D)that3 Not until quite recently_a

2、ny idea what a spaceship was like.(A)did I have(B) that I had(C) when did I have(D)didnt I have4 Not until all the fish died in the river_how serious the pollution was.(A)the villagers did realize(B) the villagers realize(C) did the villagers realize(D)didnt the villagers realize5 _I was fifteen tha

3、t I set my foot in Ireland.(A)It was not until(B) Not until(C) Although(D)Even if6 Not until Saturday afternoon_arrange for me to see Mr. Simpson.(A)he did(B) that he(C) he could(D)could he7 _started mowing the lawn when it began raining.(A)No sooner I had(B) No sooner had I(C) Hardly I had(D)Hardly

4、 had I8 Scarcely_to sleep when the telephone rang once more.(A)had I gone(B) I had gone(C) did I go(D)I went9 Hardly had the sun started to shine_it was clouded over again.(A)then(B) when(C) than(D)so10 _the door when the dog came running into the house.(A)Scarcely did I open(B) Hardly did I open(C)

5、 Scarcely had I opened(D)No sooner had I opened11 Hardly had the play started_a power cut.(A)when there was(B) when was there(C) than there was(D)than was there12 _his speech than a young woman stood up to ask a question.(A)Scarcely the chairman finished(B) No sooner had the chairman finished(C) Sca

6、rcely did the chairman finish(D)No sooner did the chairman finish13 No sooner had the rain stopped_the spectators began to return to the field.(A)then(B) when(C) so(D)than14 _opened the book when I heard steps outside the room.(A)I hardly(B) Hardly I had(C) Hardly had I(D)Hardly did I15 He has never

7、 been to London before,_he knows everything about the people and the customs there.(A)and(B) but(C) for(D)so语法词汇练习试卷 5 答案与解析一、Vocabulary and Structure1 【正确答案】 B【知识模块】 语法词汇2 【正确答案】 D【知识模块】 语法词汇3 【正确答案】 A【知识模块】 语法词汇4 【正确答案】 C【知识模块】 语法词汇5 【正确答案】 A【知识模块】 语法词汇6 【正确答案】 D【知识模块】 语法词汇7 【正确答案】 D【知识模块】 语法词汇8 【正确答案】 A【知识模块】 语法词汇9 【正确答案】 B【知识模块】 语法词汇10 【正确答案】 C【知识模块】 语法词汇11 【正确答案】 A【知识模块】 语法词汇12 【正确答案】 B【知识模块】 语法词汇13 【正确答案】 D【知识模块】 语法词汇14 【正确答案】 C【知识模块】 语法词汇15 【正确答案】 B【知识模块】 语法词汇

展开阅读全文
相关资源
猜你喜欢
  • ASTM F945-2006 Standard Test Method for Stress-Corrosion of Titanium Alloys by Aircraft Engine Cleaning Materials《航空发动机清洗材料对钛合金的应力腐蚀标准试验方法》.pdf ASTM F945-2006 Standard Test Method for Stress-Corrosion of Titanium Alloys by Aircraft Engine Cleaning Materials《航空发动机清洗材料对钛合金的应力腐蚀标准试验方法》.pdf
  • ASTM F945-2012 Standard Test Method for Stress-Corrosion of Titanium Alloys by Aircraft Engine Cleaning Materials《用飞行器发动机清洗剂对钛合金应力腐蚀的标准试验方法》.pdf ASTM F945-2012 Standard Test Method for Stress-Corrosion of Titanium Alloys by Aircraft Engine Cleaning Materials《用飞行器发动机清洗剂对钛合金应力腐蚀的标准试验方法》.pdf
  • ASTM F946-1985(2004) Standard Guide for Establishing Security Seal Control and Accountability Procedures《制定安全密封控制和衡算计量程序的标准指南》.pdf ASTM F946-1985(2004) Standard Guide for Establishing Security Seal Control and Accountability Procedures《制定安全密封控制和衡算计量程序的标准指南》.pdf
  • ASTM F946-1985(2010) Standard Guide for Establishing Security Seal Control and Accountability Procedures《制定安全密封控制和衡算计量程序的标准指南》.pdf ASTM F946-1985(2010) Standard Guide for Establishing Security Seal Control and Accountability Procedures《制定安全密封控制和衡算计量程序的标准指南》.pdf
  • ASTM F946-1985(2018) Standard Guide for Establishing Security Seal Control and Accountability Procedures《建立安全印章控制和责任程序的标准指南》.pdf ASTM F946-1985(2018) Standard Guide for Establishing Security Seal Control and Accountability Procedures《建立安全印章控制和责任程序的标准指南》.pdf
  • ASTM F948-1994(2006) Standard Test Method for Time-to-Failure of Plastic Piping Systems and Components Under Constant Internal Pressure With Flow《在恒定内流动压力下塑料管道系统和组件损坏时间的标准试验方法》.pdf ASTM F948-1994(2006) Standard Test Method for Time-to-Failure of Plastic Piping Systems and Components Under Constant Internal Pressure With Flow《在恒定内流动压力下塑料管道系统和组件损坏时间的标准试验方法》.pdf
  • ASTM F949-2006a Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings《光滑内壁聚氯乙烯(PVC)波纹和配件的标准规范》.pdf ASTM F949-2006a Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings《光滑内壁聚氯乙烯(PVC)波纹和配件的标准规范》.pdf
  • ASTM F949-2009 Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings.pdf ASTM F949-2009 Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings.pdf
  • ASTM F949-2010 Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings《内部光滑的聚(氯乙烯)(PVC)波纹污水管及配件标准规范》.pdf ASTM F949-2010 Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings《内部光滑的聚(氯乙烯)(PVC)波纹污水管及配件标准规范》.pdf
  • 相关搜索

    当前位置:首页 > 考试资料 > 大学考试

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1