NAVY MIL-B-81119 A-1989 BANDS HANDLING MISSILE AND BOOSTER MK 79 MOD 1 AND MK 81 MOD 0《 MK 79 MOD 1 和 MK 81 MOD 0导弹和助推器操作带》.pdf

上传人:tireattitude366 文档编号:977266 上传时间:2019-03-13 格式:PDF 页数:5 大小:229.57KB
下载 相关 举报
NAVY MIL-B-81119 A-1989 BANDS HANDLING MISSILE AND BOOSTER MK 79 MOD 1 AND MK 81 MOD 0《 MK 79 MOD 1 和 MK 81 MOD 0导弹和助推器操作带》.pdf_第1页
第1页 / 共5页
NAVY MIL-B-81119 A-1989 BANDS HANDLING MISSILE AND BOOSTER MK 79 MOD 1 AND MK 81 MOD 0《 MK 79 MOD 1 和 MK 81 MOD 0导弹和助推器操作带》.pdf_第2页
第2页 / 共5页
NAVY MIL-B-81119 A-1989 BANDS HANDLING MISSILE AND BOOSTER MK 79 MOD 1 AND MK 81 MOD 0《 MK 79 MOD 1 和 MK 81 MOD 0导弹和助推器操作带》.pdf_第3页
第3页 / 共5页
NAVY MIL-B-81119 A-1989 BANDS HANDLING MISSILE AND BOOSTER MK 79 MOD 1 AND MK 81 MOD 0《 MK 79 MOD 1 和 MK 81 MOD 0导弹和助推器操作带》.pdf_第4页
第4页 / 共5页
NAVY MIL-B-81119 A-1989 BANDS HANDLING MISSILE AND BOOSTER MK 79 MOD 1 AND MK 81 MOD 0《 MK 79 MOD 1 和 MK 81 MOD 0导弹和助推器操作带》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-B-8LLLA LL( = 7O6 0358678 3 H I I I 1 INCH POUND dIL-B-811198(06) - SUPERSEDING MXL-B-81119(8%) 8 April 1965 MILITARY SPECIFICATION BANDS, HdhBIDLINCI, MISSILE AND BOOSTER MK 79 MOD 1 AND MM 81 MOD O This specification is approved for use by the Naval Sea Systems Command, Department of the Navy

2、and is available for use by ell Departments and Agencies of the Department sf Defense. 1. SCOPE 1.1 Saopr. This speeificatisn establishes the requirements for the . manufaotupe of handling bands for Mip 79 Mod 1 and Mk 81 MOU O. 2. APPLICABLE DOCUMENIS 3.1. Spseiiieationa, aitandaPdi and handbooks.

3、The fo-Dwlng specifications, standards and handbooks form a part of thas document to the extent specified herein. Unless otherwise specified, the issues of these documents ere those listed in the issue of the Department of Defense Index of Specifications and Standards IDODISS) and supplement thereto

4、, cited in the solicitation (see 6.21. Beneficialaomments Irecommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Skation, Standardization Branch (37301, Indian Head, MD 20640-5000, by us

5、ing the self-addressed Standardization Document Improvement Proposal (D5 Form 1426) appearing at I the end of this document or by letter. AMSC N/A FSC 1450 . . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-BLLLSA L4 SSSS0b .035Bbi7 5 -1 SPECI

6、FICATIONS FEDERAL PPP-B-621 - BOX, Wood, Nailed and Lock-Corner MIL I TARY MIL-P-116 - Preservation, Methods of STANDARDS MIL I TARY MIL-STD-129 - Marking for Shipment and Storage (Unless otherwise indicated, copies of federal and militmy specifica- taons, standards and handbooks are available fmm t

7、he Nawal Publications and Forms Center, (ATTN: NPODS), 5801 Tabor Avenue, Philadelphia, PA 19120-5099.) d 2.1.2 Other Oovernment documenta, dmwingi, and publiektieae. The . following other overnment documents, drawings, and( publications form a papt of %his document to the extent speeified herein. U

8、nless ot;herwise specafied, the issues ape those cited in the solicitation. DRAWINdS NAVAL SEA SYSTEMS COMMAND (CAGE Code 10001) DL 1448529 - Band, Handling Mk 75, Mod 1 LD 484331 - Bond, Handlang Mk 81 Mod O (Application for copies of NAVSEA drawings should be addressed to: Commanding Officer, Nava

9、l Ordnance Station, (Attn: Code 8021, Louisville, KY 40214.1 3.2 Order of precedence. In the event sf a conflict between the text or thas document and the references cited herein, the text of this document takes precedence. Nothing ln this document, however, supersedes applicable laws and regulation

10、s unless a specific exemption has been obtained. CID REQUIREMENTS 3.1 Firsit article. When specified (see 6.2) a sample shall be subjected to first article inspection (see 6.3) in accordance with 4.2. a m Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,

11、-,-MIL-B-BLLLSA 14 77Ob 0358680 I d 3.2 Design and construction. The Mk 79 Mod 1 handling band and the Mk Ei1 Mod O handling band shall be fabricated and assembled in aceordance with ISL 1448526 and LU 484331 respectively. 3.3 Materiale. The detailed requirements for materials of the handling bands

12、are provided on LD 484331, UL i448529 and the drawings, specifications and standards listed thereon. 3.4 Holeting etrength on$ interface. The hoisting strength and interface of the handling bands wnen tested in accordance with 4.4 and 4.5 shall compiy with the requirements specified on the appropria

13、te DWLU including drawings and specifications listed therein. 3.5 Workmanship. The assembled handling bands shall be free from foreign matter, bonding, marking, and from burrs and sharp edges. 4. QUALITY ASSURANCE PROVISIONS 4.1 Reaponaibility for inagection. Unless otherwise specified in the contra

14、ct or purchase order, the contractor is responsible for the performance of all inspection requirements examinations and tests! specified herein. Except as otherwise specified in the contract or purchase order, the contrac- tor may use his own OF any other facilities suitable for the performance O th

15、e inspection requirements specified herein, unless disapproved by the Qovernment. The Government resepves the right to perform any of tne inspections set forth in the specification where such rnspections are deemed necessary to ensure supplies and services conform to prescribed requirements. & 4.1.1

16、 Respongibility for compliance. All items shall meet all require- ments of sections 3 and 5. The inspection set forth in this specification shali become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not r

17、elieve the contpactor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements,

18、 however, this does. not authorize submission of defective material, either indicated or actual, nor does it commit the Government to accept defective material. 4.2 Claaelfication of inspectione. The inspection requirements specified herein are classified as follows: a. First article inspection (see

19、 4.3). b. Quality conformance inspection (See 4.41. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-B-BLLLSA /II W 9977906 035BbL 3 il 4.3 First article inspection. Unless otherwise specified, all inspections shall be performed under the follo

20、wing conditions: a. Temperature: 70 i 20 OF. b. Al ti tude : normal ground. 4.4 Quality eonformanse inspection. Quality conformance inspection shall consist of the tests specified in table I. Measuring instruments sufficient to verify drawing tolerances shall be used. The procedures used for inspect

21、ion are at the option of the contractor provided ObJeative, documented evidence is maintained and made available upon request by the Bovernment. Failure to meet the requirements specified herein shall be cause for rejection of the handling bands. TABLE I. Quality conformance inspection. Mk 79 Mod 1

22、3000 (1100, -01 Mk 81 Mod O 6900 (tlO0, -O) 4.5 Static overload teet. The handling bands shall withstand a static overload test of three times the safe working load (3 x SW1 for a period of 5 minutes for each test Specified in table I. The Government reserves the right to perform a $tatic overload t

23、est to failure. Any handling band which fails at a point less than the static design load (5 x SWL) shall be considered unacceptable. 5.1 Packing. Unless otherwise specified in the contract or purchase order tsee 6.21, each handling band shall be preserved in accordance with MIL- . B-116, Method III

24、 and individually packed into a wood box conforming to PPP-B- 621, Class I, Style 4, Grade E. 5,2 Mapking. In addition to any special marking required by the eontract or order Isee 6.21, the wood boxes shall be marked in aacordance with MIL-STD-126. 6, NOTES (This section contains information of tha

25、t may be helpful, but is not mandatory. a genepal or explanatory nature Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-8.1 Intended 80. The Mk 79 Mod 1 handling band is intended for use with the Standard Missile (extended range) and the hk 80 Mod O

26、is intended for use with the Standard Missile hlk 12 and Mk 70 boosters. 6.2 Acquietion requiremonte. Acquisition documents must specify the following: a. Title, number and date of this specification. b. Issue of DODISS to be cited in the solicitation, and if required, the specific issue of individu

27、al documents referenced (see 2.1.1, and 2.1.2 J. 6.3 First artiple. When a first article inspection is required, the contracting officer should provide specafic guidance to offerors whether the itemta) should be a preproduction sample, a first artiele sample, a first production item, a sample select

28、ed from the first pfoduction items, a standard production atem from the contractors current inventoroy (see 3.1). The contracting officer should also include specific instructions in acquisition documents regarding arrangements for examinations, approval of first article test results, and dispositio

29、n of first articles. Invitations for bids should provide that the Uovernment reserves the right to waave the requirement for samples for first article inspection to those bidders offefing a product which has been previously acquired or tested by the Government, and that bidders offefing such product

30、s, who wish to rely on Such produckion or teat, must fuPnish evidence with the bid that priop Government approval is presentby appfspriate for the pending contract. Bidders should not submit alternate bids unless specifically requested to do so an the solicitation. 8.4 Subject term (key word) listin

31、g. Handl ing bands Standard Missile Standard Missile Booster 6.0 Changea frons psrviour iaaue. Astefisks are not used in this revision to identify changes with respect to the previous issue due to the extensiveness of the changes. Preparing Activity: (Project 1450-NO55) Navy - OS 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1