1、MIL-C-14884 AMENDMENT 3 23 Jan 1981 SUPERSEDING AMENDMENT 2 29 December 1977 * f MILITARY SPECIFICATION CATAPUZT, AIRCRAFT EJECTION SEAT: M37 ASSEMBLY This amendment forms a part of Military Specification MIL-C-14884, dated 25 February 1969, and is approved for use by- all Departments and Agencies o
2、f the Department of Defense. In the title, and wherever it appears in the nomenclature, delete “XM37 I and substitute “M37“. Page 1 * Below title, add: “This specification is approved or use by all Departments and Agencies of the Department of Defense.“ * 2.1, STANDARDS, add: “MIL-STD-1167 Annuuniti
3、on Data Card MIL-STD-1168 Annuunition Lot Numbering“ Bottom center of page, ad: * II Beneficial comments (recommendations, additions, deletions) and any perttnent data dich may be of use in fmproving this document: should be addressed to: Standardization/DocuentatTon Diviston (Sol), Indian Head, MD
4、20640, by using te self-addressed Standardization Document document or by letter. 1 1 Commanding Officer, Naval Ordnance Station, I ! i mprovement: Proposal (DD Form 14261 appearing at the end of this i I “ FSC 1377 Provided by IHSNot for ResaleNo reproduction or networking permitted without license
5、 from IHS-,-,-* MIL-C-14884 Anendnent 3 Page 2 After 3.1, add as follows: “3.1.1 Production lot designation. The production lot number-shall follow MIL-STD-1168. The construction of the lot number shall be follows: IHM75D002-007 TTIT T abcd e where : a = Manufacturers Identification Code b = The yea
6、r of manufacture of the oldest batch of propellant in the lot. e = The month of manufacture of the oldest batch of propellant in the lot expressed as an alpha code in accordance with 4.1.3 of d = Lot interfix number (controlled by Naval Ordnance Station, Code e = Lot sequence number - lot number (ma
7、nufacturer is responsible MIL-STD-1168. 5152, Indian Head, MD 20640 or procuring activity). for the assignment of lot numbers). 3.1.2 Explosive components. All explosive components, including but not limited to ignftion powders and igniters, shall be manufactured within the 12 months prior to the co
8、ntract scheduled delivery date for the assembly lot. months prior to the contract scheduled delivery date for the assembly lot. , Primers shall be manufactured or requalified within 12 3.1.3 Propellant. The propellant shall be manufactured within the 150 days prior to the contract scheduled delivery
9、 date for the assembly lot.“ Table 1, across from “Trunnion and Tube, Launcher“ delete “400 + 50“ and substitute “500 + 50“. Page 13 Delete paragraph 5.2 in its entfrety. The margins of this amendment aremarked with an asterisk to indicate where changes *(additons, modifications, corrections, deleti
10、ons) from the previous amendment were made. ThSs was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. requirements of this doeument based on the entire content irrespective of the marginal notations and relat-ionship to the last p
11、revious issue. Bidders and contractors are cautioned to evaluate the Custodian: Preparing Activity : AIR FORCE - 99 NAW - OS NAVY - OS Project No. 1377-0710 QU& GOVERNMENT PRINTING OFFICE: 1981 - 703923/897 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-