NAVY MIL-STD-1323-387-1992 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB 2000 LB BLU-109-A B (THERMALLY PROTECTED) IN PALLET BOMB S S MHU-212 E (DWG《S S MHU-212 E(DWG # 3336AS100)炸弹货盘热.pdf

上传人:sumcourage256 文档编号:982202 上传时间:2019-03-12 格式:PDF 页数:3 大小:105.72KB
下载 相关 举报
NAVY MIL-STD-1323-387-1992 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB 2000 LB BLU-109-A B (THERMALLY PROTECTED) IN PALLET BOMB S S MHU-212 E (DWG《S S MHU-212 E(DWG # 3336AS100)炸弹货盘热.pdf_第1页
第1页 / 共3页
NAVY MIL-STD-1323-387-1992 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB 2000 LB BLU-109-A B (THERMALLY PROTECTED) IN PALLET BOMB S S MHU-212 E (DWG《S S MHU-212 E(DWG # 3336AS100)炸弹货盘热.pdf_第2页
第2页 / 共3页
NAVY MIL-STD-1323-387-1992 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB 2000 LB BLU-109-A B (THERMALLY PROTECTED) IN PALLET BOMB S S MHU-212 E (DWG《S S MHU-212 E(DWG # 3336AS100)炸弹货盘热.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-STD-1323 -387 9 9999911 0435009 902 TDA SYSCOM DATE REV LTR APPROVAL REV IS ION DESCR IPTION MIL-STD-1323-387 NAWI MILITARY STANDARD 25 NOVEMBER 1992 UNIT LOAD FOR UNDERWAY REPLENISHMENT STANDARDS. REFER TO INDEX TO STANDARDS, MIL -HDBK-236 (NAVY). I FSC 814 BOMB, 2000 LB. BLU-109-A/B (THERMALLY

2、 PROTECTED) IN PALLET, BOMB, S/S, MHU-ZlZ/E / (DWG # 3336AS100) _IT LOAD DATA NUMBER OF BOMBS/UNIT LOAD -2 GROSS WEIGHT OF ONE BOMBp1,988 LBS GROSS WEIGHT OF TOP FRAME -123 LBS GROSS WEIGHT OF BOTrOM FRAME-217 LBS WEIGHT OF STEEL STRAPPING -5 LBS GROSS WEIGHT OF UNIT LOAD / 4,321 LBS A 47 63 CU FT C

3、UBE DO NOT USE FOR SHIPPING WEIGHT DO NOT STACK MORE THAN 6 UNIT LOADS HIGH IN STORAGE HEIGHT , - N/A THIS UNIT LOAD IS AUTHORIZED AND RELEASED FOR SHIPPING. HANDLING, STORAGE AND TRANSFER-AT-SEA. IT MAY ALSO BE USED FOR DOMESTIC SHIPMENT IN COMPLIANCE WITH DOT REGULATIONS. SIGNATYQ! ,/ TDA. WPNSTA

4、EARLE OATE REQUIREMENTS FOR CONSTRUCTION OF THIS UNIT LOAD SHALL CONSIST OF THIS DOCUMENT AND THE LATEST ISSUE OF MIL-STD-1323 NAWI. ; 1 ., 7. L-L c, L /th - ,- QAT I/ I ORIGINATOR WPNSTA EARLE. NEW JERSEY ln Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I

5、HS-,-,-MIL-STD-1323-387 (NAVY) PALLETIZING PROCEDURE (A) (6) THREAD LONGITUDINAL STRAPPING, ITEM 3, THROUGH SLOTS IN BOTrOM FRAME, ITEM i, AS SHOWN IN VIEW A-A PRE-POSITION TWO BOMBS WITH THEIR SUSPENSION LUGS OUTBOARD IN THE FIVE OCLOCK AND SEVEN OCLOCK POSITIONS AND PLACE IN BOTOM FRAME, ITEM 1, A

6、S SHOWN IN SECTION 6-6 AND THEIR AFT ENDS SNUG AGAINST THE AFT RIM OF THE FRAME AS SHOWN IN VIEW C-C. POSITION THE TOP FRAME, ITEM 2, OVER THE BOMBS WITH THE AFT RIM SNUG AGAINST THE AFT END OF THE BOMBS AS SHOWN IN VIEW C-C. POSITION LATERAL STRAPPING, ITEM 4, UNDER THE UNIT LOAD AND OVER THE TOP F

7、RAME IN POSITIONS SHOWN. TENSION AND DOUBLE NOTCH SEALS, ITEM 5. POSITION LONGITUDINAL STRAPPING, ITEM 3, OVER THE TOP FRAME (C) (0) E) TENSION AND DOUBLE NOTCH SEAL, ITEM 5 MARKING IN ADDITION TO ANY SPECIAL MARKING REQUIRED BY CONTRACT OR ORDER, THE UNIT LOAD SHALL BE MARKED IN ACCORDANCE WITH MIL

8、STD-129. STACKING HEIGHT UNLESS OTHERWISE SPECIFIED, ALL MATERIALS SHALL BE IN ACCORDANCE WITH MIL-STD-1323 (NAVY). DEPALLETIZING PROCEDURE 1 CUT AND REMOVE STRAPPING. 2. REMOVE TOP FRAME. 3 REMOVE BOMBS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,

9、MIL-STD-1323 -387 9999933 0435011 560 MI L-STD- 1323 -387 (NAVY 1 )y=- / 1 REF.RUN STRAPPING THROUGH SLOT (3) PL VIEW A-A / i / SECTION B-B ROTATED 30C C 0 REF VIEW C-C ROTATED 30C C PREPARING ACTIVITY NAVY-OS (PROJECT NO 8140-N1041) PAGE 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 15494-2007 en Candles - Product safety labels《蜡烛 产品安全标签》.pdf EN 15494-2007 en Candles - Product safety labels《蜡烛 产品安全标签》.pdf
  • EN 15495-2007 en Non Destructive testing - Acoustic emission - Examination of metallic pressure equipment during proof testing - Zone location of AE sources《无损检测 声发射 验证试验过程中金属压力设备的.pdf EN 15495-2007 en Non Destructive testing - Acoustic emission - Examination of metallic pressure equipment during proof testing - Zone location of AE sources《无损检测 声发射 验证试验过程中金属压力设备的.pdf
  • EN 15496-2008 en Cycles - Requirements and test methods for cycle locks《自行车 自行车车锁的要求和试验方法》.pdf EN 15496-2008 en Cycles - Requirements and test methods for cycle locks《自行车 自行车车锁的要求和试验方法》.pdf
  • EN 15497-2014 en Structural finger jointed solid timber - Performance requirements and minimum production requirements《指形结合立方体结构木材 性能要求及最小产量要求》.pdf EN 15497-2014 en Structural finger jointed solid timber - Performance requirements and minimum production requirements《指形结合立方体结构木材 性能要求及最小产量要求》.pdf
  • EN 15498-2008 en Precast concrete products - Wood-chip concrete shuttering blocks - Product properties and performance《预制混凝土制品 木屑混凝土模块 产品性能和特性》.pdf EN 15498-2008 en Precast concrete products - Wood-chip concrete shuttering blocks - Product properties and performance《预制混凝土制品 木屑混凝土模块 产品性能和特性》.pdf
  • EN 15500-1-2017 en Energy Performance of Buildings - Control for heating ventilating and air conditioning applications - Part 1 Electronic individual zone control equipment - Modul.pdf EN 15500-1-2017 en Energy Performance of Buildings - Control for heating ventilating and air conditioning applications - Part 1 Electronic individual zone control equipment - Modul.pdf
  • EN 15500-2008 en Control for heating ventilating and air-conditioning appl cations - Electronic individual zone control equipment《加热、通风和空气调节设施用控制 电子单个区域控制设备 n》.pdf EN 15500-2008 en Control for heating ventilating and air-conditioning appl cations - Electronic individual zone control equipment《加热、通风和空气调节设施用控制 电子单个区域控制设备 n》.pdf
  • EN 15501-2015 en Thermal insulation products for building equipment and industrial installations - Factory made expanded perlite (EP) and exfoliated vermiculite (EV) products - Spe.pdf EN 15501-2015 en Thermal insulation products for building equipment and industrial installations - Factory made expanded perlite (EP) and exfoliated vermiculite (EV) products - Spe.pdf
  • EN 15502-1-2012 en Gas-fired heating boilers - Part 1 General requirements and tests (Incorporates Amendment A1 2015)《燃气供热锅炉 一般要求和试验》.pdf EN 15502-1-2012 en Gas-fired heating boilers - Part 1 General requirements and tests (Incorporates Amendment A1 2015)《燃气供热锅炉 一般要求和试验》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1