NAVY MIL-T-24381 SUPP 1-1972 TERMINALS CASUALTY POWER SYSTEMS GENERAL SPECIFICATION FOR《紧急状况供电终端的一般规格》.pdf

上传人:progressking105 文档编号:982648 上传时间:2019-03-12 格式:PDF 页数:1 大小:45.93KB
下载 相关 举报
NAVY MIL-T-24381 SUPP 1-1972 TERMINALS CASUALTY POWER SYSTEMS GENERAL SPECIFICATION FOR《紧急状况供电终端的一般规格》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MILITARY SPECIFICATION TERMINALS, CASUALTY POmR SYSTEXS, GENERAL SPECIFICATION FOR This supplement lists the Specification Sheets associated with Military Specification MIL-T-24381(SHIPS), 21 September 1972. Specification Sheets: MIL-T-24381/1 - Terminal, Casualty Power, Bulkhead, aOO-Ampere, 500 Vo

2、lt, Three-phase, Alternating Current, Symbol Number 1025. MIL-T-24381/2 - Terminals, Casualty Power, Riser, 200-Ampere, 500-Volt, Three-phase, Alternating Current, Symbol Numbers 1032, 1033 and 1034. MIL-T-24381/3 - Terminal, Casualty Power, Terminal Block, Single Pole, 200- Ampere, 120-Volt, Direct

3、 Current, Symbol Number 1035. MIL-T-2438114 - Terminal, Casualty Power, Bulkhead, 200-Amperc, 120-Volt, Direct Current, Symbol Number 1024. MIL-T-24381/5 - Terminal, Casualty Power, Switch, Portable, 60- Ampere, 500-Volt, Three-phase, Alternating Current, Symbol Nunber 1041. MIL-T-24381/6 - Terminal

4、 Casualty Power, Canvas Cover (for Riser Terminals, Symbol Numbers 1032, 1033 and 1034). MIL-T-24381/7 - Terminal, Casualty.Power, Alternating Current, Enclosure Assembly for, Symbol Number 1038. MIL-T-24381/8 - Terminal, Casualty Power, Guard, Symbol, Number 1044 (for Bulkhead Terminal, Symbol Num

5、ber 1024). MIL-T-24381/9 - Terminal, Casualty Power, Terminal Guard, Symbol Number 1037 (for Terminal Block Symbol Number 1035). MIL-T-24381/10 - Terminal, Casualty Power, Canvas Cover (for Bulkhead Terminal Symbol Number 1025). Preparing activity: Navy - SH *US. GOVERNMENT PRINTING OFFICE :19?2-714-63?/1533 FSC 5940 t THIS DOCUMENT CONTAINS - / -I PAGES T. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DL T 5461 9-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 9 Instrumentation and control《火力发电厂施工图设计文件内容深度规定 第9部分 仪表与控制》.pdf DL T 5461 9-2013 Regulations for content and depth of detailed design documents of fossil-fired power plant Part 9 Instrumentation and control《火力发电厂施工图设计文件内容深度规定 第9部分 仪表与控制》.pdf
  • DL T 5462-2012 Technical code for icing measurement of overhead transmission line《架空输电线路覆冰观测技术规定》.pdf DL T 5462-2012 Technical code for icing measurement of overhead transmission line《架空输电线路覆冰观测技术规定》.pdf
  • DL T 5463-2012 Regulations for content and depth of the working drawing design of 110 kV-750 kV overhead transmission lines《110kV~750kV架空输电线路施工图设计内容深度规定》.pdf DL T 5463-2012 Regulations for content and depth of the working drawing design of 110 kV-750 kV overhead transmission lines《110kV~750kV架空输电线路施工图设计内容深度规定》.pdf
  • DL T 5464-2013 Guidelines for primary design budgetary estimate of fossil fired power project《火力发电工程初步设计概算编制导则》.pdf DL T 5464-2013 Guidelines for primary design budgetary estimate of fossil fired power project《火力发电工程初步设计概算编制导则》.pdf
  • DL T 5465-2013 Guidelines for construction detail design estimate of fossil fired power project《火力发电工程施工图预算编制导则》.pdf DL T 5465-2013 Guidelines for construction detail design estimate of fossil fired power project《火力发电工程施工图预算编制导则》.pdf
  • DL T 5466-2013 Guidelines for feasibility study cost estimation of fossil fired power project《火力发电工程可行性研究投资估算编制导则》.pdf DL T 5466-2013 Guidelines for feasibility study cost estimation of fossil fired power project《火力发电工程可行性研究投资估算编制导则》.pdf
  • DL T 5467-2013 Guidelines for preliminary design budgetary estimate of transmission and transformer project《输变电工程初步设计概算编制导则》.pdf DL T 5467-2013 Guidelines for preliminary design budgetary estimate of transmission and transformer project《输变电工程初步设计概算编制导则》.pdf
  • DL T 5468-2013 Guidelines for working drawing estimate of transmission and transformer project《输变电工程施工图预算编制导则》.pdf DL T 5468-2013 Guidelines for working drawing estimate of transmission and transformer project《输变电工程施工图预算编制导则》.pdf
  • DL T 5469-2013 Guidelines for feasibility study cost estimation of transmission and transformer project《输变电工程可行性研究投资估算编制导则》.pdf DL T 5469-2013 Guidelines for feasibility study cost estimation of transmission and transformer project《输变电工程可行性研究投资估算编制导则》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1