1、 i _ - t MIL-P-10480D (PA) i 1 P - = Amendment 1 10 May 1976 L I i- MILITARY SPECIFICATION PLUNGER, DELAY, M1 LOADING, ASSEMBLING AND PACKING This Amendment forms a part of Military Specificatfon MIL-P-10480D (MU), 5 March 1973 and is approved for use by all Department and Agencies of the Department
2、 of Defense. 1 . 2. 3. Para, 3.2: delete “8797864“ and substitute “9311193“. 4. Para. 4.2.2.1 : delete “8797864“ and substitute “931119311. 5. Para. 4.2.2.2: delete “8797864“ and substitute “9311193“. 6. Add.Il4.2.3.7 Delay Element Torque Test - Critical Defect - Code No. 01006 - Beginning with the
3、first lot produced and continuing until three consecutive 1 ots have compl ied with the disassembly torque requirement (dwg. 9311193), 36 loaded delay plunger assemblies (less firing pin assembly) shall be selected from each lot. Thereafter, 12 assemblies shall be selected from each lot. If one or m
4、ore assemblies fail to comply with the specified requirement, the lot shall be rejected. The test shall be performed as specified in 4.3.7 using equipment in accordance with 4.2.4“. - 7. Add “4.3.7 Delay Element Torque Test - The loaded M1 Delay Plunger .Assembly, less firing pin assembly, shall be
5、placed in a suitable holding fixture. A disassembly torque of the magnitude specified on dwg. 9311193 shall be applied to the Ma Delay Element. Observation shall be made to determine compl iance with the drawing requirement.“ 8. Para. 2.1 , drawing subpara. : delete “8797864“ and substi tute “931 11
6、 93“. Para. 2.1, publication subpara.: delete in its entirety. a-. (=- -, I L ! Para. 4.2.4: delete “by Equipment Tabulation -ET-8797864 and“. - -r . i t i- . ! Custodian: Preparing Activity; Army- PA Arniy-PA Project Number: 1375-A-1 72 / . US. GOVERNMENT PRINTING OFFICE: 1976-603766/5526 1 f Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-