BS 7121-13-2009 Code of practice for safe use nof cranes – nPart 13 Hydraulic gantry lifting systems《起重机安全使用实施规程 第13部分 液压龙门吊装系统》.pdf

上传人:孙刚 文档编号:546567 上传时间:2018-12-09 格式:PDF 页数:70 大小:744.87KB
下载 相关 举报
BS 7121-13-2009 Code of practice for safe use nof cranes – nPart 13 Hydraulic gantry lifting systems《起重机安全使用实施规程 第13部分 液压龙门吊装系统》.pdf_第1页
第1页 / 共70页
BS 7121-13-2009 Code of practice for safe use nof cranes – nPart 13 Hydraulic gantry lifting systems《起重机安全使用实施规程 第13部分 液压龙门吊装系统》.pdf_第2页
第2页 / 共70页
BS 7121-13-2009 Code of practice for safe use nof cranes – nPart 13 Hydraulic gantry lifting systems《起重机安全使用实施规程 第13部分 液压龙门吊装系统》.pdf_第3页
第3页 / 共70页
BS 7121-13-2009 Code of practice for safe use nof cranes – nPart 13 Hydraulic gantry lifting systems《起重机安全使用实施规程 第13部分 液压龙门吊装系统》.pdf_第4页
第4页 / 共70页
BS 7121-13-2009 Code of practice for safe use nof cranes – nPart 13 Hydraulic gantry lifting systems《起重机安全使用实施规程 第13部分 液压龙门吊装系统》.pdf_第5页
第5页 / 共70页
亲,该文档总共70页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI British StandardsWB9423_BSI_StandardColCov_noK_AW:BSI FRONT COVERS 5/9/08 12:55 Page 1Code of practice for safe use of cranes Part 13: Hydraulic gantry lifting systemsBS 7121-13:2009BS 7121-13:2009 B

2、RITISH STANDARDPublishing and copyright informationThe BSI copyright notice displayed in this document indicates when the document was last issued. BSI 2009ISBN 978 0 580 68410 4ICS 53.020.20The following BSI references relate to the work on this standard: Committee reference MHE/3/11 Draft for comm

3、ent 02/710845 DCPublication historyFirst published August 2009Amendments issued since publicationDate Text affected BRITISH STANDARD BSI 2009 iBS 7121-13:2009ContentsForeword iii1 Scope 12 Normative references 13 Terms and definitions 14 Management of installation and the lifting operations 45 Contr

4、act lift or HGLS hire 96 Planning of the lifting operation 117 Selection and duties of personnel 138 Minimum attributes of personnel 159 Training and qualifications 1610 Selection of HGLS and equipment 1811 Safety 1812 Siting of the HGLS 2113 Erection and dismantling 2414 Procedures and precautions

5、3015 Operating conditions 3316 Slinging and handling of loads 3917 Thorough examination including testing 42AnnexesAnnex A (normative) Training of appointed persons and HGLS lift supervisors 45Annex B (normative) Training of HGLS operators and HGLS slingers/signallers 52Annex C (informative) Backgro

6、und to the BS 7121 series 60Bibliography 61List of figuresFigure 1 HGLS contract options 10Figure 2 Basic jacking system 25Figure 3 Track beams 26Figure 4 Jacking unit details 27Figure 5 Jacking unit on track showing track wheel guide locations 28Figure 6 Header and cross beams 29Figure 7 Typical li

7、ft link 30Figure 8 Propel cylinder attachment 37List of tablesTable 1 Mass of materials 40Table A.1 HGLS categories 47Summary of pagesThis document comprises a front cover, an inside front cover, pages i to iv, pages 1 to 62, an inside back cover and a back cover.BS 7121-13:2009ii BSI 2009BRITISH ST

8、ANDARDThis page deliberately left blankBRITISH STANDARD BSI 2009 iiiBS 7121-13:2009ForewordPublishing informationThis part of BS 7121 is published by BSI and came into effect on 31 August 2009. It was prepared by Subcommittee MHE/3/11, Crane safety and testing, under the authority of Technical Commi

9、ttee MHE/3, Cranes and derricks. A list of organizations represented on this committee can be obtained on request to its secretary.Relationship with other publicationsThe Lifting Operations and Lifting Equipment Regulations (LOLER) 1 and the Provision and Use of Work Equipment Regulations (PUWER) 2

10、came into force in December 1998. Details of the Regulations, an Approved Code of Practice plus Health and Safety Executive (HSE) guidance can be found in the HSE books Safe use of lifting equipment 3 and Safe use of work equipment 4.BS 7121-1 provides general recommendations for crane types not cov

11、ered in an additional part of BS 7121. BS 7121-2 covers in-service inspection, thorough examination and, where appropriate, testing for the safe use of all types of cranes. Subsequent parts of BS 7121 deal with the specific crane types as follows: Part 3: Mobile cranes; Part 4: Lorry loaders; Part 5

12、: Tower cranes; Part 6: Derrick cranes; Part 7: Overhead/under-hung travelling and goliath cranes; Part 8: High pedestal and portal jib dockside cranes; Part 9: Container handling cranes; Part 10: Rail mounted cranes; Part 11: Offshore cranes; Part 12: Recovery vehicles and equipment; Part 13: Hydra

13、ulic gantry lifting systems; Part 14: Side boom pipelayers.When all parts of BS 7121 have been published, CP 3010 will be withdrawn and BS 5744 will be revised to cover manually operated and light cranes only.Information on the background to the development and use of the BS 7121 series since the in

14、itial publication of BS 7121-1 in 1989 is given in Annex C.The BS 7121 series has been accepted as representing the consensus of practical experience for safety on cranes.Information about this documentThis document is intended to be used in conjunction with other parts of BS 7121 to ensure, so far

15、as is reasonably practicable, that lifting operations are carried out safely.BS 7121-13:2009iv BSI 2009BRITISH STANDARDThe Health and Safety Executive (HSE) commends the use of this British Standard to those who have duties under the Health and Safety at Work etc. Act 1974 5. This standard was drawn

16、 up with the participation of HSE representatives and will be referred to in relevant HSE publications.Use of this documentAs a code of practice, this British Standard takes the form of guidance and recommendations. It should not be quoted as if it were a specification, and particular care should be

17、 taken to ensure that claims of compliance are not misleading.Any user claiming compliance with this British Standard is expected to be able to justify any course of action that deviates from its recommendations.It has been assumed in the preparation of this British Standard that the execution of it

18、s provisions will be entrusted to appropriately qualified and experienced people, for whose use it has been produced.Presentational conventionsThe provisions in this standard are presented in roman (i.e. upright) type. Its recommendations are expressed in sentences in which the principal auxiliary v

19、erb is “should”.Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative element.Contractual and legal considerationsThis publication does not purport to include all the necessary provisions of a contract. Users are responsible

20、 for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.BRITISH STANDARD BSI 2009 1BS 7121-13:20091 ScopeThis part of BS 7121 gives recommendations for the safe use of hydraulic gantry lifting systems (HGLS). Subjects covered include safe systems

21、 of work, management, planning, selection, erection and dismantling, inspection, testing, examination, training, operation and maintenance. NOTE 1 This part of BS 7121 has been developed along the lines of BS 7121-1 with significant modifications to incorporate HGLS-specific aspects. The modificatio

22、ns include some information contained in the US Specialized Carriers and Rigging Association (SCb) external cylinder: used on free wheeling jacking units, a cylinder is pinned close to the bottom of the units base at one end and to the track at the other. The cylinder is extended and retracted repea

23、tedly to move the jacking units;c) external drive wheels: one or more motor-driven drive wheels are mounted on the base of the jacking units.3.20 rated capacitymaximum load that the HGLS is designed to lift with the telescopic cylinder(s) at a specific stageNOTE The rated capacity was formerly known

24、 as “safe working load” (SWL).3.21 rated capacity indicatorRCIdevice that warns of the approach to overload and prevents the HGLS from being overloaded NOTE 1 This was previously known as an “automatic safe load indicator (ASLI)” and “overload protection”. For information on ASLIs, see BS 7262.NOTE

25、2 Further information on RCIs is given in BS EN 12077-2.3.22 side shiftinglateral movement of a suspended lifting object, usually accomplished by means of hydraulically propelled skates built into the lifting links or rack and pinion travelling deviceBS 7121-13:20094 BSI 2009BRITISH STANDARD3.23 tra

26、ckassembly consisting of two parallel beams, usually tied together at regular intervals, to guide the wheels of the jacking unitNOTE 1 The beams are either wide flange shapes or fabricated box sections, and are typically fitted with one or more structural elements that guide the jacking units wheels

27、. The beam gauge is equal to the transverse wheel spacing of the jacking unit. Most track is designed in short sections that can be bolted together end to end.NOTE 2 The track members can be designed to carry the jacking unit wheel loads over significant clear spans or to be fully supported by the u

28、nderlying surface, functioning only to provide a smooth, guided surface for the jacking units wheels. Since jacking units are usually operated in pairs, two track assemblies (parallel to one another) are usually required for a lifting operation.4 Management of installation and the lifting operations

29、4.1 Safe system of workA safe system of work should be established and this should be followed for every lifting operation, whether for an individual lift or a group of repetitive operations. The same principles should be applied when the lifting operations are carried out at a temporary site or whe

30、n the HGLS is being used in a permanent fixture for a length of time.The safe system of work should include:a) planning of the operation (by way of the method statement; see 6.3);b) selection, provision and use of a suitable HGLS configuration and associated equipment (may be included in risk assess

31、ment; see 6.2);c) any necessary preparation of the site and erection and dismantling of the HGLS;d) maintenance, examination and, where necessary, testing of the HGLS and equipment;e) the provision of properly trained and competent personnel who have been made aware of their relevant responsibilitie

32、s under the Heath and Safety at Work etc. Act 1974 5, the Management of Health and Safety at Work Act 1992 7 (which is specific to risk assessments and method statements) and Regulation 9 of PUWER 2;f) adequate supervision by properly trained and competent personnel having the necessary authority gi

33、ven by the operator company;g) ensuring that all necessary reports of thorough examination and other documents are available;h) preventing unauthorized movement or use at all times;i) ensuring the safety of persons not involved in the lifting operation.The safe system of work should be communicated

34、to all parties concerned with the lifting operation.BRITISH STANDARD BSI 2009 5BS 7121-13:2009It is essential for the safety of the operation to ensure that all personnel can communicate clearly in the same language.NOTE Attention is drawn to PUWER 2 Regulation 4 and 20 on “Suitability of work equip

35、ment” and “Stability” respectively and LOLER 1 Regulation 4 on “Strength and stability” in relation to the safe system of work.4.2 Control of the lifting operation4.2.1 GeneralIn order to implement the safe system of work effectively, one person should be appointed to have overall control of the lif

36、ting operation to act on behalf of the management of the employing organization. The appointment of the person does not remove any legal responsibility from the management but enables them to use the appointed persons expertise, the better to fulfil their responsibilities. The person appointed may h

37、ave other duties and need not be an employee of the employing organization. The appointed person should have adequate training and experience to enable these duties to be carried out competently. NOTE The appointed person is appointed by either the employing organization or by the HGLS company, depe

38、nding on the contractual circumstances. Occasionally, for the duration of the actual lifting operation, the role of the appointed person may be delegated to the HGLS lift supervisor if this is considered to be more appropriate.4.2.2 Selection and assessment of appointed personWhen selecting an appoi

39、nted person, the employing organization should take into account the variety and complexity of the operation, as well as all the problems that could arise from proximity hazards and environmental courses. The appointed person should be notified formally in writing of their appointment. The appointed

40、 person should be given authority to carry out the duties involved, including consulting others with specialist knowledge and experience, and should be able to delegate duties and tasks for any part of the safe system of work to suitably qualified individuals.The employing organization should review

41、 and assess the performance of the appointed person periodically. The complexity of the installation/lifting operations might entail selection of a more experienced appointed person, as appropriate, or provision of additional training to the existing appointed person.4.2.3 Avoidance of collisionsOn

42、sites where there is a risk of collision between the HGLS and other equipment, the appointed person should plan the sequence of HGLS movements to prevent collisions. Any corresponding instructions from the appointed person to the HGLS lift supervisor should be given directly or via the respective si

43、gnallers. In such circumstances, the signallers should obtain the agreement of the appointed person before carrying out any operation.The positioning of the HGLS and components in the out-of-service condition, as specified by the manufacturers instructions, should be such that no collisions can take

44、 place. This activity should be part of the initial planning process.NOTE To assist in the selection of an appointed person, some examples of lifting operations that require different levels of expertise, training and experience, and that impose different duties on the appointed person, are given in

45、 4.3. Recommendations for installation operations are given in Clause 12 and Clause 13.BS 7121-13:20096 BSI 2009BRITISH STANDARD4.3 Duties of the person appointed to control the lifting operation4.3.1 GeneralThe appointed persons duties should include the following:a) assessing the lifting operation

46、 to provide such planning, selection of HGLS, its configuration and lifting accessories, instruction and supervision (by personnel with the necessary competence, experience and qualifications) as is necessary for the task to be undertaken safely. This might include consultation with other responsibl

47、e bodies, if necessary, and ensuring that, where different organizations are involved, they collaborate as necessary;b) ensuring that adequate inspection/examination and maintenance of the HGLS and associated lifting accessories has been carried out;NOTE 1 For further information, see BS 7121-2.c) e

48、nsuring that there is an effective procedure for reporting defects and incidents and taking any necessary corrective action;d) taking responsibility for the organization and control of the lifting operation.The appointed person should be given the necessary authority for the performance of all these

49、 duties and, in particular, the authority to stop the operation whenever they consider that danger is likely to arise if the operation were to continue.Duties may be delegated to another person (perhaps the HGLS lift supervisor) where considered appropriate.NOTE 2 See 4.2.1 regarding delegation of the role of the appointed person to the HGLS lift supervisor during the actual lift if considered to be more appropriate.The duties of appointed persons for HGLS operations can vary according to the complexity of

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
  • AECMA PREN 3182-1989 Aerospace Series Ball Bearings Rigid in Corrosion Resisting Steel Cadmium Plated for Control Cable Pulleys Dimensions and Loads Issue P 1《航空航天系列.圆轴承严格 防腐蚀钢镉涂层用.pdf AECMA PREN 3182-1989 Aerospace Series Ball Bearings Rigid in Corrosion Resisting Steel Cadmium Plated for Control Cable Pulleys Dimensions and Loads Issue P 1《航空航天系列.圆轴承严格 防腐蚀钢镉涂层用.pdf
  • AECMA PREN 3196-1987 Aerospace Series Nuts Self-Locking Hexagonal in Heat Resisting Steel FE-PA92HT (A286) Silver Coated Classification  1100 MPa 425 Degrees Celsius Issue P 1《航空航天.pdf AECMA PREN 3196-1987 Aerospace Series Nuts Self-Locking Hexagonal in Heat Resisting Steel FE-PA92HT (A286) Silver Coated Classification 1100 MPa 425 Degrees Celsius Issue P 1《航空航天.pdf
  • AECMA PREN 3197-2010 Aerospace series Design and installation of aircraft electrical and optical interconnection systems Edition P 2《航空航天系列.飞机电力和光学互连系统的设计和安装.版本P2》.pdf AECMA PREN 3197-2010 Aerospace series Design and installation of aircraft electrical and optical interconnection systems Edition P 2《航空航天系列.飞机电力和光学互连系统的设计和安装.版本P2》.pdf
  • AECMA PREN 3201-1990 Aerospace Series Design Standard Holes for Metric Threaded Fasteners Issue P 1《航空航天系列.设计基孔公制螺纹.P1版》.pdf AECMA PREN 3201-1990 Aerospace Series Design Standard Holes for Metric Threaded Fasteners Issue P 1《航空航天系列.设计基孔公制螺纹.P1版》.pdf
  • AECMA PREN 3202-1989 Aerospace Series T-Head Bolt Traps Design Dimensions Issue P 1《航空航天系列.T头螺钉设计尺寸.P1版》.pdf AECMA PREN 3202-1989 Aerospace Series T-Head Bolt Traps Design Dimensions Issue P 1《航空航天系列.T头螺钉设计尺寸.P1版》.pdf
  • AECMA PREN 3207-1996 Aerospace Series Rubber Compounds Technical Specification Edition 1《航空航天系列.橡胶封口胶技术规范.第1版》.pdf AECMA PREN 3207-1996 Aerospace Series Rubber Compounds Technical Specification Edition 1《航空航天系列.橡胶封口胶技术规范.第1版》.pdf
  • AECMA PREN 3212-1993 Aerospace Series Paints and Varnishes Corrosion Test by Alternate Immersion in a Buffered Sodium Chloride Solution Edition 1《航空航天系列.清漆和油漆腐蚀测试交替浸渍试验氯化钠缓冲器溶液处理.P.pdf AECMA PREN 3212-1993 Aerospace Series Paints and Varnishes Corrosion Test by Alternate Immersion in a Buffered Sodium Chloride Solution Edition 1《航空航天系列.清漆和油漆腐蚀测试交替浸渍试验氯化钠缓冲器溶液处理.P.pdf
  • AECMA PREN 3218-001-1995 Aerospace Series Connector Rectangular with Metallic Shells and Screw-Locking Part 001  Technical Specification Edition P 1《航空航天系列.用金属壳体和螺旋锁模矩形连接器 001部分 技术.pdf AECMA PREN 3218-001-1995 Aerospace Series Connector Rectangular with Metallic Shells and Screw-Locking Part 001 Technical Specification Edition P 1《航空航天系列.用金属壳体和螺旋锁模矩形连接器 001部分 技术.pdf
  • AECMA PREN 3218-002-1995 Aerospace Series Connector Rectangular with Metallic Shells and Screw-Locking Part 002 Specification of Performance and Contact Arrangements Edition P1《航空航.pdf AECMA PREN 3218-002-1995 Aerospace Series Connector Rectangular with Metallic Shells and Screw-Locking Part 002 Specification of Performance and Contact Arrangements Edition P1《航空航.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1