ETSI TR 134 943-2005 Universal Mobile Telecommunications System (UMTS) Analysis of difference between FDD and 1 28 Mcps TDD and corresponding effect on terminal conformance test in_1.pdf

上传人:孙刚 文档编号:737055 上传时间:2019-01-12 格式:PDF 页数:150 大小:810.16KB
下载 相关 举报
ETSI TR 134 943-2005 Universal Mobile Telecommunications System (UMTS) Analysis of difference between FDD and 1 28 Mcps TDD and corresponding effect on terminal conformance test in_1.pdf_第1页
第1页 / 共150页
ETSI TR 134 943-2005 Universal Mobile Telecommunications System (UMTS) Analysis of difference between FDD and 1 28 Mcps TDD and corresponding effect on terminal conformance test in_1.pdf_第2页
第2页 / 共150页
ETSI TR 134 943-2005 Universal Mobile Telecommunications System (UMTS) Analysis of difference between FDD and 1 28 Mcps TDD and corresponding effect on terminal conformance test in_1.pdf_第3页
第3页 / 共150页
ETSI TR 134 943-2005 Universal Mobile Telecommunications System (UMTS) Analysis of difference between FDD and 1 28 Mcps TDD and corresponding effect on terminal conformance test in_1.pdf_第4页
第4页 / 共150页
ETSI TR 134 943-2005 Universal Mobile Telecommunications System (UMTS) Analysis of difference between FDD and 1 28 Mcps TDD and corresponding effect on terminal conformance test in_1.pdf_第5页
第5页 / 共150页
点击查看更多>>
资源描述

1、 ETSI TR 134 943 V5.0.0 (2005-10)Technical Report Universal Mobile Telecommunications System (UMTS);Analysis of difference between FDD and 1.28 Mcps TDD andcorresponding effect on terminal conformance testin radio access stratum protocol aspects(3GPP TR 34.943 version 5.0.0 Release 5)ETSI ETSI TR 13

2、4 943 V5.0.0 (2005-10) 1 3GPP TR 34.943 version 5.0.0 Release 5 Reference DTR/TSGR-0534943v500 Keywords UMTS ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistr

3、e la Sous-Prfecture de Grasse (06) N 7803/88 Important notice Individual copies of the present document can be downloaded from: http:/www.etsi.org The present document may be made available in more than one electronic version or in print. In any case of existing or perceived difference in contents b

4、etween such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the reference shall be the printing on ETSI printers of the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may

5、 be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the following services: http:/portal.etsi.org/chai

6、rcor/ETSI_support.asp Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2005. All rights reserved. DECTTM, PLUGTESTSTM and UMTST

7、M are Trade Marks of ETSI registered for the benefit of its Members. TIPHONTMand the TIPHON logo are Trade Marks currently being registered by ETSI for the benefit of its Members. 3GPPTM is a Trade Mark of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. ETSI E

8、TSI TR 134 943 V5.0.0 (2005-10) 2 3GPP TR 34.943 version 5.0.0 Release 5 Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and

9、 non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/webapp.etsi.org/

10、IPR/home.asp). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential

11、 to the present document. Foreword This Technical Report (TR) has been produced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or GSM identities. These should be interpreted as bein

12、g references to the corresponding ETSI deliverables. The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp . ETSI ETSI TR 134 943 V5.0.0 (2005-10) 3 3GPP TR 34.943 version 5.0.0 Release 5 Contents Intellectual Property Rights2 Fore

13、word.2 Foreword.8 Introduction 8 1 Scope 9 2 References 9 3 Abbreviations .10 4 Difference Analysis on Uu and Iub Interface.10 4.1 General Description on Uu and Iub Interface.10 4.2 Differences in L1 on Uu interface 11 4.2.1 General description.11 4.2.1.1 In 1.28Mcps TDD .11 4.2.1.2 In FDD 11 4.2.2

14、Specific frame structure 12 4.2.2.1 In 1.28Mcps TDD .12 4.2.2.2 In FDD 12 4.2.3 Different modulation.13 4.2.3.1 In 1.28Mcps TDD .13 4.2.3.2 In FDD 15 4.2.4 Different channel coding 15 4.2.5 Differences on Physical Channels 16 4.2.5.1 P-CCPCH16 4.2.5.1.1 In 1.28Mcps TDD16 4.2.5.1.2 In FDD.16 4.2.5.2

15、S-CCPCH17 4.2.5.2.1 In 1.28Mcps TDD17 4.2.5.2.2 In FDD.17 4.2.5.3 PRACH .17 4.2.5.3.1 In 1.28Mcps TDD17 4.2.5.3.2 In FDD.17 4.2.5.4 Common Pilot Channel (CPICH) (FDD only) 17 4.2.5.5 Synchronization Channel (SCH) (FDD only) .18 4.2.5.6 Physical Downlink Shared Channel (PDSCH)19 4.2.5.6.1 In 1.28Mcps

16、 TDD19 4.2.5.6.2 In FDD.19 4.2.5.7 Acquisition Indicator Channel (AICH) (FDD only) .19 4.2.5.8 CPCH Access Preamble Acquisition Indicator Channel (AP-AICH) (FDD only)19 4.2.5.9 CPCH Collision Detection/Channel Assignment Indicator Channel (CD/CA-ICH) (FDD only).20 4.2.5.10 Paging Indicator Channel (

17、PICH) .20 4.2.5.10.1 In 1.28 Mcps TDD.20 4.2.5.10.2 In FDD.20 4.2.5.11 CPCH Status Indicator Channel (CSICH) (FDD only).20 4.2.5.12 Fast Physical Access Channel (FPACH) (1.28McpsTDD only) .20 4.2.5.13 Synchronization channels (DwPCH, UpPCH) (1.28Mcps TDD only) .20 4.2.5.14 Physical Uplink Shared Cha

18、nnel (PUSCH) (1.28Mcps TDD only)21 4.2.5.15 Dedicated Physical Channel(DPCH).21 4.2.5.15.1 In 1.28 Mcps TDD.21 4.2.5.15.2 In FDD.21 ETSI ETSI TR 134 943 V5.0.0 (2005-10) 4 3GPP TR 34.943 version 5.0.0 Release 5 4.2.5.16 Physical Common Packet Channel (PCPCH) (FDD only)22 4.2.6 Differences on Transpo

19、rt Channels 22 4.2.7 Different Mapping between TrCHs on PhyCHs .23 4.2.7.1 In 1.28Mcps TDD .23 4.2.7.2 In FDD 23 4.2.8 Different physical procedure.23 4.2.8.1 Different random access procedure.23 4.2.8.2 Transmitter power control procedure23 4.2.8.2.1 Uplink control24 4.2.8.2.2 Downlink power Contro

20、l.25 4.2.8.3 Synchronization procedures 25 4.2.8.3.1 In 1.28Mcps TDD25 4.2.8.3.2 In FDD.25 4.2.8.3.3 Different channel synchronization procedures 26 4.2.9 Different Physical Layer Measurements.26 4.2.9.1 UE measurement abilities .26 4.2.9.2 UTRAN measurement abilities .27 4.2.9.3 Compressed mode (Fo

21、r FDD).27 4.2.9.4 Transmit diversity .29 4.2.9.4.1 In 1.28Mcps TDD29 4.2.9.4.2 In FDD.29 4.3 Differences in L2 on Uu interface 29 4.3.1 MAC Channel Structure .29 4.3.2 MAC Entities 29 4.3.3 MAC Functions 30 4.3.4 MAC Data PDU31 4.3.5 Specific Functions 32 4.3.6 Elements for layer-to-layer communicat

22、ion .38 4.4 Differences in L3 on Uu interface 38 4.4.1 RRC Services.38 4.4.2 RRC Functions.38 4.4.3 RRC Procedures.39 4.4.3.1 Specific procedures for 1.28Mcps TDD only39 4.4.3.1.1 Physical Shared Channel Allocation .39 4.4.3.1.2 PUSCH capacity request .39 4.4.3.1.3 Uplink Physical Channel Control 40

23、 4.4.3.1.4 UL Timing advance control.40 4.4.3.2 Specific procedures for FDD only 41 4.4.3.2.1 Active set update .41 4.4.3.2.2 Open loop power control upon establishment of DPCCH.42 4.4.3.2.3 Physical channel establishment criteria .42 4.4.3.3 Common procedures .42 4.4.3.3.1 Open loop power control .

24、42 4.4.3.3.2 CFN calculation.43 4.4.3.3.3 PRACH selection.43 4.4.3.3.4 RACH TTI selection44 4.4.3.3.5 Reception of Handover to UTRAN command message by UE.45 4.4.4 Generic actions on receipt of an information element 45 4.4.4.1 Specific information elements for 1.28Mcps TDD only .45 4.4.4.1.1 Repeti

25、tion period, Repetition length, Offset45 4.4.4.1.2 UL Timing advance control.46 4.4.4.1.3 FPACH/PRACH Selection46 4.4.4.2 Specific information elements for FDD only 47 4.4.4.2.1 DRAC static information.47 4.4.4.2.2 Secondary CPICH info 47 4.4.4.2.3 Primary CPICH usage for channel estimation.47 4.4.4

26、.2.4 PDSCH with SHO DCH Info 47 4.4.4.2.5 PDSCH code mapping.47 4.4.4.2.6 CPCH SET Info.48 4.4.4.2.7 CPCH set ID48 4.4.4.2.8 Secondary Scrambling Code, Code Number .48 ETSI ETSI TR 134 943 V5.0.0 (2005-10) 5 3GPP TR 34.943 version 5.0.0 Release 5 4.4.4.2.9 SRB delay, PC preamble .49 4.4.4.3 Common i

27、nformation elements.49 4.4.4.3.1 New DSCH-RNTI .49 4.4.4.3.2 Capability Update Requirement 49 4.4.4.3.3 Transport Format Set.50 4.4.4.3.4 Transport format combination subset 50 4.4.4.3.5 TFCS Reconfiguration/Addition Information .50 4.4.4.3.6 Uplink DPCH power control info50 4.4.5 RRC Messages51 4.4

28、.5.1 Specific messages for 1.28Mcps TDD51 4.4.5.2 Specific messages for FDD.51 4.4.5.3 Common messages with different IEs.51 4.4.6 RRC Information Elements 52 4.4.6.1 Specific information elements for 1.28Mcps TDD .52 4.4.6.2 Specific information elements for FDD 53 4.4.6.3 Common information elemen

29、ts with different contents54 4.5 Differences on Iub Interface.56 4.5.1 Node B logical model over Iub interface 56 4.5.2 Iub aspects of common resources .57 4.5.2.1 General57 4.5.2.2 Cell configuration .57 4.5.2.3 Common transport channels management 57 4.5.2.4 Shared Channels57 4.5.2.4.1 Iub aspects

30、 of USCH TDD only .58 4.5.2.4.1.1 USCH Data Transfer procedure TDD .58 4.5.2.4.1.2 USCH DATA FRAME structure TDD .58 4.5.2.4.1.3 Dynamic PUSCH Assignment procedure TDD 59 4.5.2.4.2 Iub aspects of DSCH .59 4.5.2.4.2.1 DSCH Data Transfer procedure.59 4.5.2.4.2.2 DSCH DATA FRAME structure .60 4.5.3 Iub

31、 aspects of dedicated resources61 4.5.4 Iub aspects of Synchronization procedure 61 4.5.4.1 General61 4.5.4.2 Establishment and Maintenance of UL Synchronization 62 4.5.5 Iub aspects of Power Control62 4.5.5.1 General62 4.5.5.2 Transmission of TPC.62 4.5.5.3 Power Control characteristics63 4.5.5.4 M

32、easurement of Downlink Power Control for 1.28Mcps TDD63 4.5.6 Iub aspects of Measurements64 4.5.6.1 General64 4.5.6.2 Measurement related to DCA64 4.5.6.3 Measurement related to RACH.64 4.5.7 Iub aspects of NBAP protocol 65 4.5.7.1 Different NBAP Functions/EPs/Messages65 4.5.7.2 Common NBAP messages

33、 with different contents .66 4.5.7.3 Specific Parameters for TDD only 67 5 Effect on 3GPP TS 34.123-169 5.1 Idle mode operations 69 5.1.1 In a pure 3GPP environment.69 5.1.2 In Multi-mode environment (2G/3G case)70 5.2 Layer 2 .71 5.2.1 MAC .71 5.2.2 RLC 72 5.2.3 PDCP 72 5.2.4 BMC .72 5.3 Radio Reso

34、urce Control RRC 72 5.3.1 RRC Connection Management Procedure 72 5.3.2 Radio Bearer Control Procedure.75 5.3.3 RRC Connection Mobility Procedure.83 5.3.4 Measurement Procedure .93 ETSI ETSI TR 134 943 V5.0.0 (2005-10) 6 3GPP TR 34.943 version 5.0.0 Release 5 5.4 Elementary procedures of mobility man

35、agement .98 5.5 Circuit Switched Call Control (CC) .98 5.6 Session Management Procedures .98 5.7 Elementary procedure for Packet Switched Mobility Management .98 5.8 General Tests98 5.9 Interoperability Radio Bearer Tests98 5.10 Supplementary Services .98 5.11 Short message service (SMS).98 5.12 Spe

36、cific features .99 5.13 Multi-Layer Functional Tests.99 6 Effect on 3GPP TS 34.123-299 7 Effect on 3GPP TS 34.123-399 7.1 Effect on ATS structure99 7.1.1 Modularity 99 7.2 Effect on Test method and testing architecture 99 7.3 Effect on PCO and ASP definitions .100 7.4 Effect on Design Considerations

37、 102 8 Effect on 3GPP TS 34.108 104 8.1 Effect on Common requirements of test equipment .104 8.1.1 General Functional Requirements.104 8.1.2 Minimum performance levels.104 8.1.2.1 Supported Cell Configuration .104 8.1.2.1.1 Supported Channels.104 8.1.2.2 RF Performance 104 8.1.2.3 Timers Tolerances.

38、104 8.2 Reference Test Conditions .105 8.2.1 Test frequencies 105 8.2.2 Radio conditions .105 8.2.3 Standard test signals106 8.2.4 Signal levels106 8.3 Reference System Configurations 106 8.3.1 Simulated network environment .106 8.3.1.1 Default Master Information Block and scheduling Block messages.

39、106 8.3.1.2 Default System Information Block Messages .107 8.3.1.2.1 System Information Block type 1107 8.3.1.2.2 System Information Block type 2107 8.3.1.2.3 System Information Block type 3107 8.3.1.2.4 System Information Block type 4108 8.3.1.2.5 System Information Block type 5109 8.3.1.2.6 System

40、 Information Block type 6115 8.3.1.2.7 System Information Block type 7115 8.3.1.2.8 System Information Block type 8, 9, 10115 8.3.1.2.9 System Information Block type 11116 8.3.1.2.10 System Information Block type 12121 8.3.1.2.11 System Information Block type 13121 8.3.1.2.12 System Information Bloc

41、k type 16121 8.3.1.2.13 System Information Block type 17122 8.3.1.2.14 System Information Block type 18122 8.3.1.3 SCCPCH configuration with Stand-alone SRB for PCCH in the first SCCPCH and Interactive/Background 32 kbps PS RAB + SRBs for CCCH/DCCH/BCCH in the second SCCPCH .122 8.3.1.4 SCCPCH confi

42、guration with Stand-alone SRB for PCCH in the first SCCPCH, RB for CTCH + SRBs for CCCH/BCCH in the second SCCPCH and Interactive/Background 32 kbps PS RAB + SRBs for CCCH/DCCH/BCCH in the third SCCPCH (FDD only)122 8.3.1.5 SCCPCH configuration with Stand-alone SRB for PCCH in the first SCCPCH and I

43、nteractive/Background 32 kbps PS RAB + SRBs for CCCH/DCCH/BCCH in the second and third SCCPCHs .123 8.3.1.6 Default parameters for 1 to 8 cell environments 123 8.3.1.6.1 Default parameters for cell No.1 environments.123 8.3.1.6.2 Default parameters for cell No.2 environments.123 ETSI ETSI TR 134 943

44、 V5.0.0 (2005-10) 7 3GPP TR 34.943 version 5.0.0 Release 5 8.3.1.6.3 Default parameters for cell No.3 environments.125 8.3.1.6.4 Default parameters for cell No.4 environments127 8.3.1.6.5 Default parameters for cell No.5 environments.129 8.3.1.6.6 Default parameters for cell No.6 environments.131 8.

45、3.1.6.7 Default parameters for cell No.7 environments.133 8.3.1.6.8 Default parameters for cell No.8 environments.134 8.3.1.6.9 Default parameters for cell No.9 environments.135 8.3.1.6.10 Default parameters for cell No.10 environments.136 8.3.1.6.11 Default parameters for cell No. 11 environments13

46、6 8.3.1.6.12 Default Cell parameters Two PLMN in UTRAN test scenario .136 8.3.1.7 Reference Radio Conditions for signalling test cases .136 8.3.2 Number of neighbour cells .138 8.3.3 Cell/BS codes etc138 8.3.4 Routing/location area138 8.3.5 Network options settings 138 8.3.6 Power control mode138 8.

47、3.6.1 Downlink Power Control 138 8.3.6.2 Uplink Power Control .138 8.3.7 Tx Diversity modes.139 8.3.8 Compressed Mode Parameters139 8.3.9 BCCH parameters.139 8.3.10 Reference Radio Bearer configurations used in Radio Bearer interoperability testing.139 8.3.10.1 QoS Architecture and RAB attributes.13

48、9 8.3.10.2 RAB and signalling RB.139 8.3.10.2.1 RABs and signalling RBs139 8.3.10.2.2 Combinations of RABs and Signalling RBs140 8.4 Generic setup procedures .142 8.4.1 Basic Generic Procedures .142 8.4.2 Generic setup procedures142 8.4.3 Test procedures for RF test.143 8.4.4 Common generic procedur

49、es for AS testing .143 8.5 Default Message Contents144 8.5.1 Default Message Contents for Signalling .144 8.5.2 Default Message Contents for RF.147 Annex A: Change history 148 History 149 ETSI ETSI TR 134 943 V5.0.0 (2005-10) 8 3GPP TR 34.943 version 5.0.0 Release 5 Foreword This Technical Report (TR) has been produced by the 3rdGeneration Partnership Project (3GPP). The contents of the present document are subject to continuing work within the TSG RAN WG5 and may change following formal TSG approval. Should the TSG modify the contents of the present document, it will b

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1