FORD FLTM BI 120-04-2001 PUMPING STABILITY FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-04)《电涂底漆的泵送稳定性 替代FLTM BI 020-04[替代 FORD FLTM BI 020-04]》.pdf

上传人:吴艺期 文档编号:747012 上传时间:2019-01-14 格式:PDF 页数:3 大小:41.60KB
下载 相关 举报
FORD FLTM BI 120-04-2001 PUMPING STABILITY FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-04)《电涂底漆的泵送稳定性 替代FLTM BI 020-04[替代 FORD FLTM BI 020-04]》.pdf_第1页
第1页 / 共3页
FORD FLTM BI 120-04-2001 PUMPING STABILITY FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-04)《电涂底漆的泵送稳定性 替代FLTM BI 020-04[替代 FORD FLTM BI 020-04]》.pdf_第2页
第2页 / 共3页
FORD FLTM BI 120-04-2001 PUMPING STABILITY FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-04)《电涂底漆的泵送稳定性 替代FLTM BI 020-04[替代 FORD FLTM BI 020-04]》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BI 120-04 Date Action Revisions 2001 03 19 Revised Editorial no technical change A. Cockman 1989 10 25 Printed copies are uncontrolled Page 1 of 3 Copyright 2001, Ford Global Technologies, Inc. PUMPING STABILITY FOR ELECTROCOATING PRIMERS Application This procedure is us

2、ed to determine the mechanical stability of electrocoating bath consisting of not more than 20 % non-volatile material content on agitation in open vessels. Apparatus Required Tank - (18.9 liters) Heat insulated, with conical bottom and variable speed circulating pump with one rheostat and a plastic

3、 flexible tube system as shown in Figure 1. The pump is submerged in a separate thermostat bath. Source: Model #1 Little Giant Pump Co. 3210 N. Tulsa St. Oklahoma City, Oklahoma U.S.A. Measuring Vessel - (7.6 liters) Electrocoating Equipment See Ford Laboratory Test Method BI 120-01. Procedure 1. Th

4、e tank is filled with paint as used in an electrocoating tank, using some of the paint for the priming of the pump and hose system. 2. The pump is started and the paint flow measured by closing rubber hose “A“ by means of a pinch clamp and letting paint flow from “B“ for 60 sec into a 7.6 liter meas

5、uring vessel. The rheostat is used to adjust the flow to 7.6 liter/min. Valve “B“ is closed, the pinch clamp removed, so that the paint circulates from hose “A“ through the tank and the pump. 3. The bottom and walls of the tank are provided with thermal insulation so that the mechanical and other en

6、ergy produced by the agitating system maintains a bath temperature of 35 +/- 2 C against the ambient room temperature. FORD LABORATORY TEST METHOD BI 120-04 Page 2 of 3 Copyright 2001, Ford Global Technologies, Inc. 4. Water, alkali or acid, and solvent level, are maintained through periodic additio

7、ns. 5. The agitation, temperature, pH, solubilizer conc, solvent level, etc. are maintained as specified by vendor for 20 days. At the end of this period the paint bath and the electrocoated panels from it must not show deviation from the original properties. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities. FORD LABORATORY TEST METHOD BI 120-04 Page 3 of 3 Copyright 2001, Ford Global Technologies, Inc. Figure 1

展开阅读全文
相关资源
猜你喜欢
  • BS 5306-4-2001+A1-2012 Fire extinguishing installations and equipment on premises Specification for carbon dioxide systems《房屋用灭火装置及设备 二氧化碳系统规格》.pdf BS 5306-4-2001+A1-2012 Fire extinguishing installations and equipment on premises Specification for carbon dioxide systems《房屋用灭火装置及设备 二氧化碳系统规格》.pdf
  • BS 5306-5 1-1992 Code of practice for fire extinguishing installations and equipment on premises - Halon systems - Specification for halon 1301 total flooding systems《房屋灭火装置及设备惯例 第.pdf BS 5306-5 1-1992 Code of practice for fire extinguishing installations and equipment on premises - Halon systems - Specification for halon 1301 total flooding systems《房屋灭火装置及设备惯例 第.pdf
  • BS 5306-5 2-1984 Code of practice for fire extinguishing installations and equipment on premises - Halon systems - Halon 1211 total flooding systems《住宅灭火装置及设备 第5部分 哈朗(聚四氟乙烯)灭火系统 第2.pdf BS 5306-5 2-1984 Code of practice for fire extinguishing installations and equipment on premises - Halon systems - Halon 1211 total flooding systems《住宅灭火装置及设备 第5部分 哈朗(聚四氟乙烯)灭火系统 第2.pdf
  • BS 5306-8-2012 Fire extinguishing installations and equipment on premises Part 8 Selection and positioning of portable fire extinguishers Code of practice《房屋灭火装置及设备 第8部分 便携式灭火器的选择和.pdf BS 5306-8-2012 Fire extinguishing installations and equipment on premises Part 8 Selection and positioning of portable fire extinguishers Code of practice《房屋灭火装置及设备 第8部分 便携式灭火器的选择和.pdf
  • BS 5306-9-2015 Fire extinguishing installations and equipment on premises Recharging of portable fire extinguishers Code of practice《处所内的灭火装置及设备 便携式灭火器的再充装 实践规程》.pdf BS 5306-9-2015 Fire extinguishing installations and equipment on premises Recharging of portable fire extinguishers Code of practice《处所内的灭火装置及设备 便携式灭火器的再充装 实践规程》.pdf
  • BS 5307-1976 Specification - Basic ball-lock punches《普通球锁冲床规范》.pdf BS 5307-1976 Specification - Basic ball-lock punches《普通球锁冲床规范》.pdf
  • BS 5315-1991 Hose clamps (worm drive type) for general purpose use (metric series)《通用软管夹子(蜗杆驱动型)(米制系列)》.pdf BS 5315-1991 Hose clamps (worm drive type) for general purpose use (metric series)《通用软管夹子(蜗杆驱动型)(米制系列)》.pdf
  • BS 5317-1976 Specification - Metric length bars and their accessories《米制长度量棒及其附件规范》.pdf BS 5317-1976 Specification - Metric length bars and their accessories《米制长度量棒及其附件规范》.pdf
  • BS 5325-2001 Installation of textile floor coverings - Code of practice《铺地纺织物的铺设 实施规程》.pdf BS 5325-2001 Installation of textile floor coverings - Code of practice《铺地纺织物的铺设 实施规程》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1