ISA TR18 02-2016 Alarm Identification and Rationalization.pdf

上传人:inwarn120 文档编号:789959 上传时间:2019-01-31 格式:PDF 页数:42 大小:529.99KB
下载 相关 举报
ISA TR18 02-2016 Alarm Identification and Rationalization.pdf_第1页
第1页 / 共42页
ISA TR18 02-2016 Alarm Identification and Rationalization.pdf_第2页
第2页 / 共42页
ISA TR18 02-2016 Alarm Identification and Rationalization.pdf_第3页
第3页 / 共42页
ISA TR18 02-2016 Alarm Identification and Rationalization.pdf_第4页
第4页 / 共42页
ISA TR18 02-2016 Alarm Identification and Rationalization.pdf_第5页
第5页 / 共42页
点击查看更多>>
资源描述

1、 TECHNICAL REPORT ISA-TR18.02-2016 Alarm Identification and Rationalization Approved 29 June 2016 ISATR18.022016, Alarm Identification and Rationalization ISBN: 978-1-945541-00-1 Copyright 2016 by the International Society of Automation. All rights reserved. Printed in the United States of America.

2、No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior written permission of the publisher. ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park

3、, North Carolina 27709 E-mail: standardsisa.org 3 ISA-TR18.02-2016 Preface This preface, as well as all footnotes and annexes, is included for information purposes only and is not part of ISA TR18.02-2016. This technical report has been prepared as part of the service of ISA, the International Soc i

4、ety of Automation, toward a goal of helping in the understanding and use of the ISA/ANSI -18.02-2009 Management of Alarm Systems for the Process Industries. To be of real value, this document should not be static but should be subject to periodic review. Toward this end, the Society welcomes all com

5、ments and criticisms and asks that they be addressed to the Secretary, Standards and Practices Board; ISA, 67 Alexander Drive; P.O. Box 12277; Research Triangle Park, NC 277099; Telephone (919) 549-8411; Fax (919) 549-8288; E-mail: standardsisa.org. This ISA Standards and Practices Department is awa

6、re of the growing need for attention to the metric system of units in general, and the International System of Units (SI) in particular, in the preparation of instrumentation standards, recommended practices, and technical reports. The Department is further aware of the benefits of USA users of ISA

7、standards of incorporating suitable references to the SI (and the metric system) in their business and professional dealings with other countries. Toward this end, the Department will endeavor to introduce SI and acceptable metric units in all new and revised standards to the greatest extent possibl

8、e. The Metric Practice Guide, which has been published by the Institute of Electrical and Electronics Engineers (IEEE) as ANSI/IEEE Std. 268-1992, and future revisions, will be the reference guide for definitions, symbols, abbreviations, and conversion factors. It is the policy of ISA to encourage a

9、nd welcome the participation of all concerned individuals and interests in the development of ISA standards. Participation in the ISA standards-making process by an individual in no way constitutes endorsement by the employer of that individual, of ISA, or of any of the standards, recommended practi

10、ces, and technical reports that ISA develops. This technical report is structured to follow the ISA Style Guide. CAUTION ISA ADHERES TO THE POLICY OF THE AMERICAN NATIONAL STANDARDS INSTITUTE WITH REGARD TO PATENTS. IF ISA IS INFORMED OF AN EXISTING PATENT THAT IS REQUIRED FOR USE OF THE DOCUMENT, I

11、T WILL REQUIRE THE OWNER OF THE PATENT TO EITHER GRANT A ROYALTY-FREE LICENSE FOR USE OF THE PATENT BY USERS COMPLYING WITH THE DOCUMENT OR A LICENSE ON REASONABLE TERMS AND CONDITIONS THAT ARE FREE FROM UNFAIR DISCRIMINATION. EVEN IF ISA IS UNAWARE OF ANY PATENT COVERING THIS DOCUMENT, THE USER IS

12、CAUTIONED THAT IMPLEMENTATION OF THE DOCUMENT MAY REQUIRE USE OF TECHNIQUES, PROCESSES, OR MATERIALS COVERED BY PATENT RIGHTS. ISA TAKES NO POSITION ON THE EXISTENCE OR VALIDITY OF ANY PATENT RIGHTS THAT MAY BE INVOLVED IN IMPLEMENTING THE DOCUMENT. ISA IS NOT RESPONSIBLE FOR IDENTIFYING ALL PATENTS

13、 THAT MAY REQUIRE A LICENSE BEFORE IMPLEMENTATION OF THE DOCUMENT OR FOR INVESTIGATING THE VALIDITY OR SCOPE OF ANY PATENTS BROUGHT TO ITS ATTENTION. THE USER SHOULD CAREFULLY INVESTIGATE RELEVANT PATENTS BEFORE USING THE DOCUMENT FOR THE USERS INTENDED APPLICATION. HOWEVER, ISA ASKS THAT ANYONE REV

14、IEWING THIS DOCUMENT WHO IS AWARE OF ANY PATENTS THAT MAY IMPACT IMPLEMENTATION OF THE DOCUMENT NOTIFY THE ISA STANDARDS AND PRACTICES DEPARTMENT OF THE PATENT AND ITS OWNER. ADDITIONALLY, THE USE OF THIS DOCUMENT MAY INVOLVE HAZARDOUS MATERIALS, OPERATIONS OR EQUIPMENT. THE DOCUMENT CANNOT ANTICIPA

15、TE ALL POSSIBLE APPLICATIONS OR ADDRESS ALL POSSIBLE SAFETY ISSUES ASSOCIATED WITH USE IN HAZARDOUS CONDITIONS. THE USER OF THIS DOCUMENT MUST EXERCISE SOUND PROFESSIONAL JUDGMENT CONCERNING ITS USE AND APPLICABILITY UNDER THE USERS PARTICULAR CIRCUMSTANCES. THE USER MUST ALSO CONSIDER THE APPLICABI

16、LITY OF ANY ISA-TR18.02-2016 4 GOVERNMENTAL REGULATORY LIMITATIONS AND ESTABLISHED SAFETY AND HEALTH PRACTICES BEFORE IMPLEMENTING THIS DOCUMENT. THE USER OF THIS DOCUMENT SHOULD BE AWARE THAT THIS DOCUMENT MAY BE IMPACTED BY ELECTRONIC SECURITY ISSUES. THE COMMITTEE HAS NOT YET ADDRESSED THE POTENT

17、IAL ISSUES IN THIS VERSION. The following people served as members of ISA Committee ISA18 WG2 and contributed to this technical report: The following people served as voting members of ISA18 and contributed to this technical report: NAME COMPANY D. Dunn, ISA18 Co-Chair Phillips 66 N. Sands, ISA18 Co

18、-Chair DuPont B. Fitzpatrick, ISA18 Managing Director Wood Group Mustang D. Logerot, ISA18 WG2 Co-Chair ProSys Inc. D. Strobhar, ISA18 WG Co-Chair Beville Engineering Inc. J. Alford Consultant S. Apple Schneider Electric J. Bogdan J Bogdan Consulting LLC K. Brown Enbridge Inc. M. Brown Matrikon Inc.

19、 A. Bryant Oxy Inc. J. Campbell Consultant M. Carter Consultant L. Dubois UReason B. Hollifield PAS S. Kandasamy Chevron Energy Technology Company C. Lunty Suncor M. Marvan Shell Canada D. Metzger DPM Consulting L. Myers Consultant G. Nasby City of Guelph Water Services G. Plowman Rockwell Automatio

20、n D. Rothenberg D Roth Inc. T. Stauffer Exida Co. B. Vail URS PS / AECOM K. Van Camp Emerson Process Management D. Visnich Burns however, several tasks should be completed prior to assembling the group. 6.2.1 Obtain alarm philosophy Since rationalization entails comparison of an alarm to the criteri

21、a in the philosophy document, the alarm philosophy needs to exist, be studied, and available to the group. If a philosophy has not been created, see TR1 for guidance on the creation of an alarm philosophy document. 6.2.2 Determine rationalization approach and scope Rationalization can be done in eit

22、her a comprehensive or staged approach. The comprehensive approach would be the application to all alarms at one time. This approach has both the greatest benefit and greatest resource demand. The staged approach is to apply the material to a logical subset of alarms. For example, one major oil comp

23、any chose to rationalize just their existing highest priority alarms on all process units at a refinery before working on the lower priority alarms. This approach prolongs the rationalization effort for any unit, but ensures that all the highest priority alarms are addressed sooner. The major pitfal

24、l of the staged approach is that the effort can stall at a particular stage and not be completed. Other pitfalls include (a) the staged approach is not amenable to advanced alarms and (b) can lead to an inefficient and possibly incomplete rationalization. In addition, the staged approach (a) may ign

25、ore alarms that do not currently exist but might be appropriate, and (b) might delay consideration of alarms that should be higher priority but are configured as a lower priority. 6.2.3 Identify team/personnel Rationalization should be performed by representatives with the knowledge and skills liste

26、d below. In some cases, one person may have the knowledge from several different areas. More specialized personnel can attend on an as-needed basis. 6.2.3.1 Full time skill sets Personnel with the following skill sets should be considered as full time members of the team: a) process engineering (pro

27、duction engineers, operations engineers) familiar with the process workings, economics, and with the control system; b) operations (operators, controllers, operating technicians, trainers, operating supervisors), preferably two operators from different shift teams with experience in use of the contr

28、ol system; c) process control (process control engineers, instrumentation engineers); d) experienced alarm rationalization facilitator, knowledgeable in alarm management principles and practices, with background in areas such as human factors, process engineering, operations, or control systems; and

29、 without vested interest in the previous configuration; ISA-TR18.02-2016 22 e) scribe (this depends upon the database and computer skills of the other fulltime members); f) regulatory compliance (may only be needed for certain processes in highly regulated industries or industries with certain types

30、 of operating permits). 6.2.3.2 As-needed skill sets The team should be supplemented as needed by personnel with the following skill sets on an as-needed basis: a) safety and environmental; b) maintenance/equipment reliability (usually when specific equipment is being discussed); c) management (may

31、only need to be involved in the kick-off meeting and MOC process); d) instrumentation/analyzer specialists; e) electrical and rotating equipment engineers; f) metallurgical and other specialized disciplines; g) knowledge of product quality requirements (e.g., cGMPs). 6.2.4 Analyze alarm system perfo

32、rmance (for existing control system) A history of alarm system activity and characteristics can be useful during the rationalization sessions. Operator interviews / audits can also be used to establish alarm management issues. Several months of alarm data is typically needed to capture the range of

33、plant operations needed to assess alarm problem areas. The data should be reviewed to identify a) bad actors; b) standing alarms; c) highly correlated/duplicate alarms (alarm sequences). More information on obtaining this information is contained in TR5. 6.2.5 Prepare master alarm database The resul

34、ts of rationalization should be entered into a master alarm database (MADB). A database of all tags in the process control system, and their possible alarms, is needed. Set-up of this database will need to occur prior to the group sessions. The list of alarms to be rationalized comes from the previo

35、usly completed identification work process. Clause 9 contains a more detailed discussion of the MADB. An initial review of the master alarm database may be warranted prior to the rationalization sessions. The purpose of the review is to identify systematic trends, deficiencies, and issues in alarm i

36、dentification. For example, if all temperature alarms have a high, hi-hi, low, and lo-lo alarm, then the rationale behind this (if any) should be investigated prior to the group meetings. Or, if the alarm priorities skew heavily to the highest priority category, then investigation prior to the group

37、 sessions may be worthwhile. 6.2.6 Assemble process analyses Different processes impose different requirements on rationalization. Operational details of the process are needed, including normal process variables and their tolerable limits. If these vary depending on factors such as operating mode,

38、batch stage or recipe, then details of each variant are needed. For batch processes, it is likely that the different phases of the batch and/or recipe demands will need to be known. 6.2.7 Assemble reference documents Having relevant process documentation on-hand during rationalization is critical to

39、 the process. Some types of documentation can be more easily shared between meeting participants. Certain documents, such as the P b) hazard and risk analysis (e.g., PHA, HAZOP, FMEA) reports; c) LOPA results and safety requirements specifications; d) safe operating limits; e) equipment design param

40、eters, such as temperature, pressure and capacity; f) interlocks/cause-effect diagrams; g) environmental/other permits; h) production/quality targets; i) key operating procedures; j) complex loop documentation; k) operating graphics (on-line or hardcopy); l) incident reports; m) access to process hi

41、storical data; n) task checklists; o) process narrative or description; p) manufacturer/licensor alarm requirements/recommendations; q) instrument parameters such as span and response time. 6.2.8 Kick-off meeting Since it is important for (a) management support to ensure resource availability (opera

42、tors, engineers) and (b) management understanding of the results of the rationalization, a kick-off session is used to acquaint management and all other interested parties as to the reasons for, method, and potential results of the rationalization process. A review of current alarm system performanc

43、e usually confirms the need for improvement. A presentation on the basis for alarm rationalization, as well as examples of past rationalizations, will assist the group in understanding the overall intent of the effort. Requirements for participation by specialists can be discussed as well as any con

44、cerns different plant groups might have regarding alarm removal or addition. The kickoff meeting can include the first part of the rationalization team training. Having the kick-off meeting prior to the rationalization sessions enables any potentially serious issues, such as a manager questioning th

45、e philosophy or authority of the rationalization effort, to be resolved prior to rationalization of any alarm. 6.2.9 Train rationalization team Prior to the commencement of the actual rationalization sessions, it may be useful to conduct a brief training session on alarm rationalization to all likel

46、y participants. This would include full and part time members, as well as anyone in the organization that may be impacted by the results (e.g., safety, instrument maintenance, operations). The course should cover the following: ISA-TR18.02-2016 24 a) Objectives / Goals These should be clearly stated

47、 such that each member of the rationalization team has an understanding of why the effort is being undertaken and what the results of the effort hope to achieve. b) Methodology The actual process to be used during the sessions should be explained to all participants. This includes how the Alarm Phil

48、osophy is applied, how the need for alarms is determined, how alarms are prioritized, any advanced alarm techniques to be employed, etc. c) Roles and Responsibilities Each member of the team has certain responsibilities during the rationalization effort. These should be explained and agreed upon pri

49、or to commencing the rationalization sessions. d) Scope Each member of the rationalization team should have a clear understanding of what is within the scope of rationalization sessions. This is to ensure that the meetings focus on the alarm system and the team does not get sidetracked by trying to improve or redesign the actual control system. e) Progress Expectations of daily progress and overall effort duration should be set ahead of the rationalization sessions. Team members should be aware that progress is to be tracked and reported back to managemen

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 13446-2002 Wood-based panels - Determination of withdrawal capacity of fasteners German version EN 13446 2002《木基板材 紧固件拔出能力的测定 德文版本 EN 13446 2002》.pdf DIN EN 13446-2002 Wood-based panels - Determination of withdrawal capacity of fasteners German version EN 13446 2002《木基板材 紧固件拔出能力的测定 德文版本 EN 13446 2002》.pdf
  • DIN EN 13448-2010 Agricultural and forestry machinery - Inter-row mowing units - Safety German version EN 13448 2001+A1 2009《农林机械 行间割草机 安全性 德文版本EN 13448-2001+A1-2009》.pdf DIN EN 13448-2010 Agricultural and forestry machinery - Inter-row mowing units - Safety German version EN 13448 2001+A1 2009《农林机械 行间割草机 安全性 德文版本EN 13448-2001+A1-2009》.pdf
  • DIN EN 13450 Berichtigung 1-2004 Corrigenda to DIN EN 13450 2003-06《对DIN EN 13450-2003的勘误》.pdf DIN EN 13450 Berichtigung 1-2004 Corrigenda to DIN EN 13450 2003-06《对DIN EN 13450-2003的勘误》.pdf
  • DIN EN 13450-2003 Aggregates for railway ballast German version EN 13450 2002《铁道路基用集料》.pdf DIN EN 13450-2003 Aggregates for railway ballast German version EN 13450 2002《铁道路基用集料》.pdf
  • DIN EN 13451-1-2016 Swimming pool equipment - Part 1 General safety requirements and test methods German version EN 13451-1 2011+A1 2016《游泳池设备 第1部分 一般安全要求和试验方法 德文版本EN 13451-1-2011+.pdf DIN EN 13451-1-2016 Swimming pool equipment - Part 1 General safety requirements and test methods German version EN 13451-1 2011+A1 2016《游泳池设备 第1部分 一般安全要求和试验方法 德文版本EN 13451-1-2011+.pdf
  • DIN EN 13451-10-2014 Swimming pool equipment - Part 10 Additional specific safety requirements and test methods for diving platforms diving springboards and associated equipment Ge.pdf DIN EN 13451-10-2014 Swimming pool equipment - Part 10 Additional specific safety requirements and test methods for diving platforms diving springboards and associated equipment Ge.pdf
  • DIN EN 13451-11-2014 Swimming pool equipment - Part 11 Additional specific safety requirements and test methods for moveable pool floors and moveable bulkheads German version EN 13.pdf DIN EN 13451-11-2014 Swimming pool equipment - Part 11 Additional specific safety requirements and test methods for moveable pool floors and moveable bulkheads German version EN 13.pdf
  • DIN EN 13451-2-2016 Swimming pool equipment - Part 2 Additional specific safety requirements and test methods for ladders stepladders and handle bends German version EN 13451-2 201.pdf DIN EN 13451-2-2016 Swimming pool equipment - Part 2 Additional specific safety requirements and test methods for ladders stepladders and handle bends German version EN 13451-2 201.pdf
  • DIN EN 13451-3-2016 Swimming pool equipment - Part 3 Additional specific safety requirements and test methods for inlets and outlets and water air based water leisure features Germ.pdf DIN EN 13451-3-2016 Swimming pool equipment - Part 3 Additional specific safety requirements and test methods for inlets and outlets and water air based water leisure features Germ.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1