MSFC NASA MWI 6410 1 REV F-2008 PACKAGING HANDLING AND MOVING PROGRAM CRITICAL HARDWARE《包装 装运和移动程序关键硬件》.pdf

上传人:lawfemale396 文档编号:822906 上传时间:2019-02-16 格式:PDF 页数:14 大小:54.31KB
下载 相关 举报
MSFC NASA MWI 6410 1 REV F-2008 PACKAGING HANDLING AND MOVING PROGRAM CRITICAL HARDWARE《包装 装运和移动程序关键硬件》.pdf_第1页
第1页 / 共14页
MSFC NASA MWI 6410 1 REV F-2008 PACKAGING HANDLING AND MOVING PROGRAM CRITICAL HARDWARE《包装 装运和移动程序关键硬件》.pdf_第2页
第2页 / 共14页
MSFC NASA MWI 6410 1 REV F-2008 PACKAGING HANDLING AND MOVING PROGRAM CRITICAL HARDWARE《包装 装运和移动程序关键硬件》.pdf_第3页
第3页 / 共14页
MSFC NASA MWI 6410 1 REV F-2008 PACKAGING HANDLING AND MOVING PROGRAM CRITICAL HARDWARE《包装 装运和移动程序关键硬件》.pdf_第4页
第4页 / 共14页
MSFC NASA MWI 6410 1 REV F-2008 PACKAGING HANDLING AND MOVING PROGRAM CRITICAL HARDWARE《包装 装运和移动程序关键硬件》.pdf_第5页
第5页 / 共14页
点击查看更多>>
资源描述

1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 6410.1 REVISION F EFFECTIVE DATE: October 23, 2008 EXPIRATION DATE: October 23, 2013 MARSHALL WORK INSTRUCTION AS01 PACKAGING, HANDLING, AND MOVING PROGRAM CRITIC

2、AL HARDWARE Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date: October 23, 2008 Page 2 of 14 CHECK THE MASTER LIST at https:/repository

3、.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/14/99 Document converted from MSFC-P15.1-CO1 to a Directive. Previous history retained in sys

4、tem as part of canceled or superseded ISO Document files. Revision A 8/20/99 Document updated to reflect new MSFC reorganization. Revision B 1/24/01 Clarify requirements for PHTR and Critical Item Label. Updated numbering per MPG 1410.2; deleted “and Mission Sensitive Hardware (MSH)” from section 1,

5、 Purpose; changed “MPG 1441.1” to “MPG 1440.2” and changed “MPG 1700.1” to “MPG 8715.1” in section 3, Applicable Documents; added MPG 8730.3 and MWI 3410.1 to Applicable Documents; removed item g. from section 5, Definitions; added “Redlines to the As Run handling/moving plans must be concurred by a

6、 representative from each signing organization. Also, the redlines must be documented on the Test Procedure Deviation MSFC Form 3959” to paragraph 5.5; deleted sections 5.6 and 5.7; deleted “The MM will assure the use of the PHTR and the NASA Critical Item Label” from the definition for Move Manager

7、; delete definition for Move Report; changed paragraph 5.14 to read “This document or an equivalent describes the information necessary to move PCH as required by NPG 6000.1 for all Class I items. The handling/moving plan suffices this requirement.”; section 6, Instructions, changed to read “For han

8、dcarry items, as defined in 5.3, perform the following instructions.”; deleted “or MSH” from paragraph 6.1; added “or equivalent” to paragraph 6.2; deleted paragraph 6.3; deleted section “For MSH items”; added An approved handling/moving plan shall be utilized each time a PCH item is moved unless th

9、e item is a handcarry. For PCH items, as defined in 5.12, perform the following instructions.”; added item 6.5; deleted paragraph 6.20.1.c; added “Assure that shipments of PCH to/from MSFC are coordinated with the PCH/PE” to paragraph 6.20.1.3; deleted paragraphs 6.20.1.f, h, and j”; added 6.20.1.8(

10、4); added paragraph 6.20.1.15; deleted “The degree of S deleted “A permanent record of completed handling/moving plans shall be impounded by the responsible quality organization for a minimum of 3 years” from paragraph 6.20.2.2; deleted paragraph 6.20.3.c.10 and 11; changed 6.20.3.3.i to read “certi

11、fications. In conjunction with S added 6.20.3.3.m; deleted paragraph 6.20.3.e.3; deleted 6.20.3.f.6; changed “MPG 1700.1” in section 8 to “MPG 8715.1”; changed section 9, Records to read “by S and changed “MPG 1700.1” in section 10 to “MWI 3410.1”. Revision C 2/18/2004 Renamed NSS/GO 1740.9 to NASA-

12、STD-8719.9,” Safety Standard for Lifting Devices and Equipment” Section 6.20.3.5 changed “Property Management Group” to “Transportation and Logistics Engineering Group” Revision D 10/28/2004 In compliance with Centerwide action (CAITS# 04- DA01-0387) changed all occurrences of MPG to MPR and reworde

13、d document as necessary to differentiate requirement statements from supporting text. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date

14、: October 23, 2008 Page 3 of 14 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE Revision E 03/09/2006 Renamed organization codes. Updated S (2) unique handling equipment for each operation; (3) the preparation and

15、approval of handling/moving plans at MSFC; and/or (4) the preparation of the PHTR or equivalent for each item of PCH to be moved. This responsibility encompasses MSFC and offsite contractor efforts to assure that all elements understand and accomplish assigned function, all equipment and handling/mo

16、ving plans are available to support program schedules, and handling/moving problems are promptly identified and resolved. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revisi

17、on: F Program Critical Hardware Date: October 23, 2008 Page 10 of 14 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 6.16.1.9 Design or review and approve the design of all special loading and handling equipment, t

18、est fixtures, special shipping containers, tooling, and support hardware required in the off-loading, loading, transporting, and installation of PCH. 6.16.1.10 Technically manage and physically perform, using certified personnel/equipment, the handling/moving and assembly of PCH within the organizat

19、ions operational perimeters (test stands, test fixtures, buildings) whenever the move is incidental to the test or work being performed on the hardware. 6.16.1.11 Provide a civil service MM for those handling/moving operations which do not require FMO COSS contractor support. The MM shall monitor mo

20、vements of PCH. 6.16.1.12 Assure that all equipment used by the director/managers organization for lifting and handling of PCH is tested and operated in accordance with NASA-STD-8719.9 and MWI 6430.1. 6.16.1.13 For contractor-developed hardware, assure that procurement specifications contain the req

21、uirement for preparation and implementation of detailed handling/moving plans. 6.16.1.14 Utilize the services of SQ&MS Department and the PCH/PE in the development of the required handling/moving plans and techniques to assure the maximum consideration of the safety of personnel and material is obse

22、rved. 6.16.1.15 A permanent record of completed handling/moving plans shall be maintained by the MLR. The MLR shall maintain and disposition these documents within their Program/Project Plan documentation in accordance with NPR 1441.1. 6.16.2 Director, SQ&MS Directorate, shall: 6.16.2.1 Ensure advic

23、e and assistance to Center organizations on the safety and quality aspects of the design and operational activities involved in packaging, handling, and moving PCH. 6.16.2.2 Ensure PCH handling/move plans and related documentation (hazard analysis and equipment variances, when required) are reviewed

24、 and approved by the appropriate SQ&MS (safety and quality representatives). 6.16.2.3 Ensure PCH handling/moves are monitored by the appropriate SQ&MS Department (safety and quality representatives). NOTE: Hand-carried PCH does not require SQ&MS monitoring unless specified in a procedure or program/

25、project requirements. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date: October 23, 2008 Page 11 of 14 CHECK THE MASTER LIST at https:

26、/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 6.16.2.4 Coordinate with OCO the training and certification required for all personnel who directly handle and are directly involved in the Packaging, Handling and Moving of PCH. 6.16.2.5 Provide a

27、 copy of the Certrak data base of personnel certified to directly handle PCH to the MLR upon request. 6.16.3 Director, OCO, shall: 6.16.3.1 Appoint a PCH/PE to administer the requirements of this document, develop implementation plan for management and handling of PCH at MSFC, and approve any detail

28、ed handling/moving plans for this hardware. 6.16.3.2 Assure that all contracts which involve the procurement of PCH contain appropriate provisions to assure contractor compliance with the intent of this document and that such contracts require that all documentation be conspicuously marked “PROGRAM

29、CRITICAL HARDWARE.” Through the auspices of the program/project office manager, assure that prime contractors establish packaging, handling, and moving plans consistent with the requirements provided in this document. These handling/moving plans shall include intra-plant as well as offsite shipments

30、. 6.16.3.3 PCH/PE shall: a. Serve as the MSFC central point of contact for all PCH operations. b. Certify completion of PCH orientation for all personnel involved in PCH moving/handling operations at all MSFC facilities or worksites. c. Assist in the determination of the modes of transportation avai

31、lable that satisfy the PCH transportation requirements specified. d. Maintain cognizance of all PCH handling/moving operations at all MSFC facilities or worksites. e. Coordinate PCH moves at MSFC. Coordinate the pickup and delivery of PCH at local contractors facilities. f. Maintain real-time cogniz

32、ance over maintenance, operation, testing, and certification of lifting and handling equipment used in a specific PCH handling/moving operation. g. Upon request from MLR, assist in the preparation of the PCH handling/move plan, initiate work orders, and coordinate all activities necessary for PCH op

33、erations. h. Coordinate and approve PCH handling/moving plans. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date: October 23, 2008 Page

34、 12 of 14 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE i. Review outside contractors PCH handling/moving plans. j. Provide MLR support in reviewing, evaluating, and investigating adequacy and/or mishaps associat

35、ed with the prime or support contractors in the area of PCH handling and certifications. In conjunction with S&MA Directorate, conduct audits of prime and support contractors upon the request of the MLR. k. Ascertain the escorts needed for the move by taking into consideration the size of the item,

36、route to be traveled, and the sensitivity of the item. l. Serve as MM and technical monitor for all PCH operations requiring the services of the COSS contractor. m. Provide assistance with non-PCH hardware moves when requested by the MLR. 6.16.3.4 Logistics Services Office shall assist the MLR in th

37、e interpretation and contractual application of MSFC standards, NASA standards and specifications, and other applicable specifications on packaging, marking, handling, and moving PCH. 6.16.3.5 Transportation and Logistics Engineering Office shall: a. Provide special conveyance at designated docking

38、area ready for cargo loading and unloading. b. Coordinate receipt and delivery of incoming PCH at MSFC. c. Provide certified personnel and equipment. Assure that all equipment used in lifting and handling of PCH is tested and operated in accordance with NASA-STD-8719.9 and MWI 6430.1. d. Physically

39、perform handling/moving operations when PCH materials are received, shipped, and delivered (distributed at MSFC). e. Provide a properly-trained packaging crew and associated equipment to package PCH. Handle/move PCH during crating/packing and shipping operations. f. Assure hardware has been complete

40、ly prepared for shipment and secured aboard the special conveyance in accordance with approved handling/moving plans. g. Maintain, test, and certify all mobile handling equipment in accordance with NASA-STD-8719.9 and MWI 6430.1. h. Provide the transportation mode in accordance with program requirem

41、ents and schedule the carrier within allowable operating limitations in accordance with NPR 6200.1. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical

42、 Hardware Date: October 23, 2008 Page 13 of 14 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE i. Provide traffic management support for the administration of contracted PCH moves conducted by carriers on Governmen

43、t Bills of Lading in accordance with MWI 6000.1. 6.16.3.6 FMO shall: a. Assure that adequate equipment, supplies, and tools are available for the timely performance of the operation. Perform the “hands on” handling/moving of PCH as defined in the handling/moving plans. b. Assure that support personn

44、el have received adequate training and certification for the assignment being addressed. c. Assure that the maintenance, test, and certification of all fixed lifting equipment and auxiliary handling equipment is in accordance with NASA-STD-8719.9 and MWI 6430.1. Conduct special test and certificatio

45、n of equipment upon request. d. Arrange for support for contractual implementation of the intent of this document. e. Arrange for the review of the draft and final handling/moving plans to be used and assure that they are provided to the support personnel on a timely basis. 6.16.3.7 Protective Servi

46、ces Office shall: a. Support the handling/moving of PCH within MSFC by furnishing security vehicles and personnel as required to afford protection to equipment and operations during the operational timeframe of preparation, handling, and transportation by providing escorts and guards. b. Interface w

47、ith law enforcement and other security organizations and agencies. c. Provide security plans as required. d. Provide escort for movement of PCH by vehicle through traffic over MSFC roads. e. Provide a security representative at locations other than MSFC as requested. 7. NOTES None 8. SAFETY PRECAUTI

48、ONS AND WARNING NOTES See MPR 8715.1. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction AS01 Packaging, Handling, and Moving MWI 6410.1 Revision: F Program Critical Hardware Date: October 23, 2008 Page 14 of 14 CHECK THE MASTE

49、R LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 9. RECORDS 9.1 Final handling/moving plan completed and stamped by SQ&MS Department shall be maintained by the MLR. 9.2 The permanent record of completed handling/moving plans shall be maintained and disposition by the MLR within their Program/Project Pla

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1