NAVY MIL-V-17462 B (1)-1990 VALVE SAFETY BOILER (SHIPBOARD USE)《锅炉阀安全性(舰载使用)》.pdf

上传人:medalangle361 文档编号:983006 上传时间:2019-03-12 格式:PDF 页数:2 大小:61KB
下载 相关 举报
NAVY MIL-V-17462 B (1)-1990 VALVE SAFETY BOILER (SHIPBOARD USE)《锅炉阀安全性(舰载使用)》.pdf_第1页
第1页 / 共2页
NAVY MIL-V-17462 B (1)-1990 VALVE SAFETY BOILER (SHIPBOARD USE)《锅炉阀安全性(舰载使用)》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-V-l7462B(SH) AMENDMENT 1 12 March 1990 MILITARY SPECIFICATION VALVE, SAFETY: BOILER (SHIPBOARD USE) This amendment forms a part of MIL-V-l7462B(SH), dated 11 March 1981, and is approved for use by the Department of the Navy and is available or use by all Departments and Agencies of the Departmen

2、t of Defense. PAGE 3 3.1: Delete and substitute: “3.1 First article. When specified (see 6.2.1), a sample shall be subjected to first article inspection (see 6.3 ) in accordance with 4.3.“ PAGE 10 4.2 (a) : Delete llQualificationll and substitute IIFirst article“. 4 . 3: Delete IQualificationtt and

3、substitute #First article“. AMSC N/A FSC 4820 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 1 of 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL.-V-374bZB. (3) 48 W 7779706 0434357 8 MIL-V-l7462B(SH) AMENDMEN

4、T 1 PAGE 14 6.2.1: Add: “(j) First article inspection, if required (see 3.1) .I PAGE 15 6.3: Delete and substitute: “6.3 First article. When first article inspection iS required, guidance to offerors whether the item should be a first article sample and the number of items to be tested as specified

5、in 4.3. The contracting officer should also include specific instructions in acquisition documents regarding arrangements for examinations, approval of first article test results, and disposition of first articles. Invitations for bids should provide that the Government reserves the right to waive t

6、he requirement for samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid that prior Government a

7、pproval is presently appropriate or the pending contract. Bidders should not submit alternate bids unless specifically requested to do so in the solicitation.“ the contracting officer should provide specific 6.3,l: Delete. b Preparing activity: Navy - CH (Project 4820-N059) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1