REG NASA-LLIS-0560-1997 Lessons Learned Galileo Scan Platform Anomaly at Ida Encounter (1993).pdf

上传人:wealthynice100 文档编号:1018207 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.84KB
下载 相关 举报
REG NASA-LLIS-0560-1997 Lessons Learned Galileo Scan Platform Anomaly at Ida Encounter (1993).pdf_第1页
第1页 / 共3页
REG NASA-LLIS-0560-1997 Lessons Learned Galileo Scan Platform Anomaly at Ida Encounter (1993).pdf_第2页
第2页 / 共3页
REG NASA-LLIS-0560-1997 Lessons Learned Galileo Scan Platform Anomaly at Ida Encounter (1993).pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0560Lesson Info:a71 Lesson Number: 0560a71 Lesson Date: 1997-06-05a71 Submitting Organization: JPLa71 Submitted by: R. Gounley/D. OberhettingerSubject: Galileo Scan Platform Anomaly at Ida Encounter (1993) Abstract: A scan platform anomaly occurred shortly before Galileos enco

2、unter with the asteroid Ida. Because the Galileo architecture did not provide for revolving, short-term storage of downlink data, ground control lacked insight into the cause of the incident.Missions should continuously buffer at least a small amount of high-rate telemetry as it is being downlinked

3、at a lower rate. Storage of high-rate data for the period immediately preceding and following a fault would assist mission analysts in diagnosis of the problem. Description of Driving Event: A scan platform anomaly occurred 5 hours before Galileos August 1993 encounter with the asteroid Ida. During

4、a quiescent period in scan platform activity, it unexpectedly jerked. The fault response sequence interpreted the high rate of scan platform motion as a spacecraft gyro error and turned off the gyros. The flyby continued in cruise mode, using star-based platform pointing. Although the low data rates

5、 available from the low gain antenna provided poor insight into spacecraft condition, ground control received indications of at least 5 more incidences of unexpected platform motion during quiescent periods over the next few hours. Ida encounter continued successfully with the gyros off and with no

6、further signs of the anomaly.No conclusive explanation was found despite extensive ground testing and analysis and attempts to recreate the anomaly on the spacecraft. Consistent x-axis data from both gyros suggested that gyro hardware failure was improbable. Analysis did reveal that the anomaly woul

7、d have aborted the imaging sequence had the additional power drawn during the slew been enough to cause an undervoltage condition. Instead, the first level fault protection (gyros off) allowed the sequence to continue imaging Ida. After the science data had been safely recorded and before the gyros

8、were Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-required, ground control was able to command them back on. This conservative, “first, do no harm“ approach proved successful.The Galileo architecture did not provide for revolving, short-term stora

9、ge of downlink data, which would have been useful in compensating for low telemetry data rates. Galileo telemetry provided data needed to troubleshoot the anomaly only once every two hours. Running intermittently, the tape recorder failed to capture any of the scan platform jerks. Subsequent to the

10、Galileo era, some low data rate missions are being designed to provide for some storage of transient data to improve fault visibility to ground control.Additional Keyword(s): System Design, Transient Event RecordingReference(s): ISA 04013GLesson(s) Learned: 1. Establish “First, do no harm“ as the ov

11、erriding principle guiding both fault protection design and the ground response to in-flight anomalies.2. Where it is not practical to record and downlink all telemetry, future missions should continuously buffer a small amount of high-rate telemetry as it is being downlinked at a lower rate. Should

12、 a fault occur, high-rate data for the period immediately preceeding and following the fault could be stored for later retrieval. This would assist mission analysts in real-time diagnosis of the problem.Recommendation(s): See Lesson(s) LearnedEvidence of Recurrence Control Effectiveness: N/ADocument

13、s Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/AAdditional Info: Approval Info: a71 Approval Date: 1997-08-13a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN 41773-2-1982 Static power convertors semiconductor rectifier equipment with IU characteristic for charging of nickel cadmium batteries requirements《静态功率转换器 用于镍 镉蓄电池充电用具有IU特性曲线的.pdf DIN 41773-2-1982 Static power convertors semiconductor rectifier equipment with IU characteristic for charging of nickel cadmium batteries requirements《静态功率转换器 用于镍 镉蓄电池充电用具有IU特性曲线的.pdf
  • DIN 41774-1987 Static power convertors semiconductor rectifier equipment with W-characteristic for charging of lead-acid batteries requirements《静态功率转换器 铅酸蓄电池充电用具有W特性的半导体整流器设备 要求》.pdf DIN 41774-1987 Static power convertors semiconductor rectifier equipment with W-characteristic for charging of lead-acid batteries requirements《静态功率转换器 铅酸蓄电池充电用具有W特性的半导体整流器设备 要求》.pdf
  • DIN 41775-1979 Static power convertors semiconductor rectifier equipment with  W -characteristic for charging of nickel cadmium and nickel iron batteries requirements《静态电源转换器 用于镍 镉.pdf DIN 41775-1979 Static power convertors semiconductor rectifier equipment with W -characteristic for charging of nickel cadmium and nickel iron batteries requirements《静态电源转换器 用于镍 镉.pdf
  • DIN 41776-1983 Static power convertors semiconductor rectifier equipment with I characteristic for charging of batteries requirements《静态电源转换器 蓄电池充电用具有I特性曲线的半导体整流器 要求》.pdf DIN 41776-1983 Static power convertors semiconductor rectifier equipment with I characteristic for charging of batteries requirements《静态电源转换器 蓄电池充电用具有I特性曲线的半导体整流器 要求》.pdf
  • DIN 4178-2005 Belltowers《钟楼》.pdf DIN 4178-2005 Belltowers《钟楼》.pdf
  • DIN 4185-1-2000 Terms and symbols for screening surface - Part 1 Woven cloth screens《筛面的术语和符号 第1部分 玻璃布筛》.pdf DIN 4185-1-2000 Terms and symbols for screening surface - Part 1 Woven cloth screens《筛面的术语和符号 第1部分 玻璃布筛》.pdf
  • DIN 4185-2 Bb 1-2003 Terms and symbols for screening surfaces - Part 2 Perforated plates Examples to be used in other technical areas《筛面术语和符号 第2部分 多孔板 在其他技术领域中使用的实例》.pdf DIN 4185-2 Bb 1-2003 Terms and symbols for screening surfaces - Part 2 Perforated plates Examples to be used in other technical areas《筛面术语和符号 第2部分 多孔板 在其他技术领域中使用的实例》.pdf
  • DIN 4185-2-2000 Terms and symbols for screening surfaces - Part 2 Perforated plates《筛面的术语和符号 第2部分 冲孔板》.pdf DIN 4185-2-2000 Terms and symbols for screening surfaces - Part 2 Perforated plates《筛面的术语和符号 第2部分 冲孔板》.pdf
  • DIN 4185-3-2000 Terms and symbols for screening surfaces - Part 3 Cloth-like screens wedge wire screens and gratings《筛面的术语和符号 第3部分 布状楔形金属丝筛网和网格》.pdf DIN 4185-3-2000 Terms and symbols for screening surfaces - Part 3 Cloth-like screens wedge wire screens and gratings《筛面的术语和符号 第3部分 布状楔形金属丝筛网和网格》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1