REG NASA-LLIS-0656--2000 Lessons Learned Hardware Review Certification Requirement.pdf_第2页
第2页 / 共5页
REG NASA-LLIS-0656--2000 Lessons Learned Hardware Review Certification Requirement.pdf_第3页
第3页 / 共5页
REG NASA-LLIS-0656--2000 Lessons Learned Hardware Review Certification Requirement.pdf_第4页
第4页 / 共5页
REG NASA-LLIS-0656--2000 Lessons Learned Hardware Review Certification Requirement.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Best Practices Entry: Best Practice Info:a71 Committee Approval Date: 2000-03-03a71 Center Point of Contact: JPLa71 Submitted by: Wil HarkinsSubject: Hardware Review/Certification Requirement Practice: Practice: A Hardware Review/Certification Requirement (HR/CR) Review is conducted prior to the del

2、ivery of flight hardware and associated software to evaluate and certify that the hardware is ready for delivery and that it is acceptable for integration with the spacecraft.Abstract: Preferred Practice for Design from NASA Technical Memorandum 4322A, NASA Reliability Preferred Practices for Design

3、 and Test.Benefit:The Hardware Review/Certification Requirement (HR/CR) provides a structured review process for assessing the status of flight hardware and screening for unresolved defects prior to delivery for integration.Implementation Method:After flight hardware has been designed, undergone uni

4、t level reviews, fabricated, integrated, and tested, a review board is convened to review the status of the hardware and to certify that the hardware is ready for delivery and is acceptable for mating with the spacecraft. The Project System Engineer/Instrument Manager is selected to chair the review

5、. Other members of the review board include the Hardware Division Representative, the Quality Assurance Engineer, the Software Assurance Engineer, The Environmental/Reliability Engineer, and the Product Assurance Manager.The agenda and the scope of the review board is generally defined by the HR/CR

6、form shown as Figure 1.Using the HR/CR form as a checklist, the design engineer responsible for the hardware being reviewed addresses the following:1. The hardware performance and requirements compliance status.2. That all requirements have been met, or that any requirements that have not been met a

7、re covered by approved waivers.3. That all documentation is current and complete, and includes all approved waivers and Engineering Change Requests (ECRs).4. That all analyses required to validate environmental requirements have been completed, documented, and approved.5. That all tests required to

8、qualify the hardware have been successfully completed.6. That the hardware is acceptable for integration with the spacecraft.If the members of the review board or other participants have any concerns about the flight readiness of the hardware, anyone may write a Request for Action (RFA) against the

9、hardware. These RFAs are reviewed by the Project and a response is prepared. After all RFAs are closed, the board certifies Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-that the hardware is ready for delivery and flight by signing the HR/CR form.T

10、echnical Rationale:A structured review following a predetermined checklist such as the HR/CR form provides a mechanism for the responsible design engineer to review the status of the hardware and verify that the hardware is in compliance and ready for delivery and spacecraft integration. This proces

11、s is enhanced by having a review board whose members have not been responsible for the design, fabrication, and testing of the hardware. Board members from the reliability engineering area and the product assurance area can focus this expertise on the completed product. Additionally, the board is ab

12、le to take a fresh look at the hardware production cycle and to ask questions until they are satisfied that all necessary steps have been completed and that the hardware is acceptable for integration.Related Practices:1. Common Review Methods for Engineering Products, Reliability Preferred Practice

13、No. PD-ED-1215.4.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionD Figure 1. Hardware Review / Certification Requirement Form Impact of Non-Practice: Impact of Non-Compliance: HR/CR reviews are potentially capable of discovering

14、 hardware defects, deficiencies, or deviations Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-prior to delivery of the hardware. Consequently, if the HR/CR review is not conducted, any defects, deficiencies, or deviations that may have been uncovere

15、d by the Review Board will either go undetected or will have to be detected by some other means at a time subsequent to delivery. If the hardware problems go undetected, then a mission failure may occur. If the hardware problems are detected late, then serious schedule impacts could result and the c

16、ost of correcting the hardware defect could be affected.Related Practices: N/AAdditional Info: Approval Info: a71 Approval Date: 2000-03-03a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-