1、 GUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS JUNE 2010 CORRIGENDA/EDITORIALS 1 September 2010 CORRIGENDA/EDITORIALS 6 March 2012 CORRIGENDA/EDITORIALS 1 September 2012 CORRIGENDA/EDITORIALS 1 June 2013 CORRIGENDA/EDITORIALS 1 February 2014 CORRIGENDA/EDITORIALS 1 June 2
2、014 CORRIGENDA/EDITORIALS 1 January 2015 CORRIGENDA/EDITORIALS 1 January 2016 CORRIGENDA/EDITORIALS 22 February 2016 CORRIGENDA/EDITORIALS 1 February 2017 Page No. Paragraph Comments Foreword iii - In first paragraph, “the ABS Guide for Building and Classing Membrane Tank LNG Vessels” to read “Part
3、5C, Chapter 12 of the ABS Rules for Building and Classing Steel Vessels”. iii - In first paragraph, “ABS Guide for Building and Classing Floating Production Installations” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. iii Reference Note In first paragra
4、ph, “FPI Guide” to read “FPI Rules”. Chapter 1 Conditions of Classification Section 1 Scope and Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures) 2 1-1/5.1 Revise to read, “the symbol null A1, followed by Offshore Liquefied Gas
5、Terminal and the appropriate notation for the intended service listed below.”. 3 1-1/7.1 Reference “ABS Guide for Building and Classing Floating Production Installations (FPI Guide)” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. 3 1-1/7.5 Reference “2-2
6、/3” to read “2-2/5”. 4 1-1/11.1 In PCI, “Instititue” to read “Institute”. 5 1-1/11.3 Item vi) to read “FPI Rules ABS Rules for Building and Classing Floating Production Installations”. 5 1-1/11.3 Item vii) to read “Facilities Rules ABS Rules for Building and Classing Facilities on Offshore Installat
7、ions”. 5 1-1/11.3 Delete reference “LNGC Guide ABS Guide for Building and Classing Membrane Tank LNG Vessels”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 1 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Chapter 2 Design Considerations Sectio
8、n 1 Classification of Floating Offshore Liquefied Gas Terminals 9 2-1/3.3 Reference “4-3-5/15 of the Steel Vessel Rules” to read “Section 2 of the ABS Guide for Dynamic Positioning Systems”. 10 2-1/3.9 In second paragraph, reference “3-5/7.4” to read “3-5/7.5”. 10 2-1/3.9.2 In third paragraph, “FPI
9、Guide” to read “FPI Rules”. 10 2-1/3.9.2 In last paragraph, “FPI Guide” to read “FPI Rules”. 11 2-1/3.13 (was 2-1/3.11) Add new Paragraph to reference OHCM notation, as follows: “3.11 Hull Construction Monitoring Program Floating Liquefied Gas Terminals designed and reviewed to the FLGT Guide are to
10、 comply with the requirements of the Offshore Hull Construction Monitoring Program in Chapter 3, Appendix 6 of this Guide and have the notation OHCM.” 12 2-1/11 In Item ii), “FPI Guide” to read “FPI Rules”. 12 2-1/11 In Item iii), “Facilities Guide” to read “Facilities Rules”. 12 2-1/11 In Item ix),
11、 “FPI Guide” to read “FPI Rules”. 15 2-1/13.1.1 In first paragraph, “FPI Guide” to read “FPI Rules”. 16 2-1/13.1.4 In second bullet, reference “2-2/1” to read “2-2/1.1.1”. 16 2-1/13.3 In last bullet, “FPI Guide” to read “FPI Rules”. 21 2-1/15 In last paragraph, “FPI Guide” to read “FPI Rules”. (2 pl
12、aces) Chapter 2 Design Considerations Section 2 Design of Floating Offshore Liquefied Gas Terminals 22 2-2/1.1 In first paragraph, reference “2-2/1” to read “2-2/1.1.1”. 22 2-2/1.1 In first paragraph, “FPI Guide” to read “FPI Rules”. 23 2-2/1.1.3 Reference “Part 3, Chapter 4” to read “Part 3, Chapte
13、r 4 of the FPI Rules”. 25 2-2/3 (was 2-2/1.3) In first paragraph, reference “2-2/3” to read “2-2/5”. 26 2-2/7 (was 2-2/5) In last paragraph, “FPI Guide” to read “FPI Rules”. (2 places) 26 2-2/7.1.1 Renumber 5.1.1(d) through 5.1.1(g) as 7.1.1(d) through 7.1.1(g). 26 2-2/7.1.2(b) Reference “5C-8-4/9”
14、to read “5C-8-4/19”. 26 2-2/7.1.2(b) Reference “5C-8-4/9.1” to read “5C-8-4/19.1.2”. 26 2-2/7.1.2(c) Reference “5C-8-4/10” to read “5C-8-4/20”. 27 2-2/7.1.4(a)ii) Reference “5C-8-1/11” to read “5C-8-1/11 (ABS)”. 27 2-2/7.1.4(b)ii) Reference “5C-8-1/11” to read “5C-8-1/11 (ABS)”. 27 2-2/7.1.5(b) (was
15、 2-2/5.1.5(b) In second paragraph, delete reference “and 2-1/3.11”. 30 2-2/9.7 (was 2-2/7.7) Reference “Section 4.3 of NFPA 59A” to read “Section 7.4.3 of NFPA 59A”. 2 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 1 February 2017 Page No. Pa
16、ragraph Comments Chapter 2 Design Considerations Section 2 Design of Floating Offshore Liquefied Gas Terminals 31 2-2/9.9 (was 2-2/7.9) In first paragraph, “Facilities Guide” to read “Facilities Rules”. 31 2-2/11.1 In first paragraph, reference “5C-8-3/8” to read “5C-8-3/8 and 5C-8-5/10.1”. 31 2-2/1
17、1.1 In first paragraph, reference “2-2/3” to read “2-2/5”. 31 2-2/11.1 In fourth paragraph, “dependant” to read “dependent”. 32 2-2/11.1 In fifth paragraph, reference “2-2/3” to read “2-2/5”. 32 2-2/11.1.1 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 32 2-2/11.1.1 Reference “NF
18、PA 59, A Standard for the Production, Storage and Handling of Liquefied Natural Gas (LNG) 2001” to read “NFPA 59A, Standard for the Production, Storage and Handling of Liquefied Natural Gas (LNG) 2013”. 33 2-2/11.1.2 In second paragraph, “3-3/17 of the Facilities Guide” to read “3-3/9 of the Facilit
19、ies Rules”. 33 2-2/11.1.2 In second paragraph, “ABS Guide” to read “ABS Rules”. 34 2-2/11.13 In last line, “FPI Guide” to read “FPI Rules”. 35 2-2/13.5 Reference “2-2/3” to read “2-2/5”. 35 2-2/13.7 Reference “5C-8-3/8” to read “5C-8-3/8 and 5C-8-5/10.1”. 35 2-2/13.9 Reference “Facilities Guide” to
20、read “Facilities Rules”. (2 places) 35 2-2/15 In second paragraph, reference “5C-8-1/3.17” to read “5C-8-1/2.24”. 35 2-2/15 In second paragraph, reference “Chapter 7, Section 7.6 of NFPA 59A” to read “Chapter 7, Section 10.7 of NFPA 59A”. 35 2-2/15 In third paragraph, “Facilities Guide” to read “Fac
21、ilities Rules”. 36 2-2/17 Reference “Facilities Guide” to read “Facilities Rules”. (2 places) 36 2-2/19 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 37 2-2/21 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.3.1 Reference “Facilities Guide” to read
22、“Facilities Rules”. 38 2-2/23.3.2 Reference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 38 2-2/23.5 Reference “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.5 Reference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 38 2-2/23.7 In second paragraph, “Facilities Guide” to read “
23、Facilities Rules”. 38 2-2/23.7 Reference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 39 2-2/23.9 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 39 2-2/23.11 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 39 2-2/23.15.1 In first paragraph, reference “S
24、ection 9.2 of NFPA 59A” to read “Section 12.3 of NFPA 59A”. 39 2-2/23.15.1 In second paragraph, reference “5C-8-5/6” to read “5C-8-5/5”. 40 2-2/25 Reference “FPI Guide” to read “FPI Rules”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 3 Corrigenda/Editorials 1 F
25、ebruary 2017 Page No. Paragraph Comments Chapter 3 Structural Design Requirements Section 1 Introduction 53 3-1/1.1 Reference “the ABS Guide for Building and Classing Membrane Tank LNG Vessels” to read “Part 5C, Chapter 12 of the Steel Vessel Rules”. 53 3-1/1.3 Reference “5C-8-4/2.2” to read “5C-8-4
26、/1.5”. 53 3-1/1.5 In first paragraph, reference “5C-8-4/2.4.2” to read “5C-8-4/21.1.1”. 53 3-1/1.5 In second paragraph, reference “5C-8-4/4.4” to read “5C-8-4/21”. 53 3-1/1.5 In third paragraph, reference “5C-8-4/4.5” to read “5C-8-4/22”. (2 places) 53 3-1/1.5 In last paragraph, reference “5C-8-4/4.
27、6” to read “5C-8-4/23.2”. (2 places) 54 3-1/3.1 In second line, reference “3-4/Figure 4” to read “3-4/Figure 4 of this Guide”. 55 3-1/3.11 Reference “5C-8-4/2.6” to read “5C-8-4/1.2”. 56 3-1/Table 1 In first row, reference “5C-8-4/8.1” to read “5C-8-4/19.1.1”. 56 3-1/3.19 In fifth paragraph below Ta
28、ble 1, reference “5C-8-4/8” to read “5C-8-4/10 and 5C-8-4/19”. Chapter 3 Structural Design Requirements Section 3 Load Criteria 69 3-3/Figure 1C SLC 5 In section view of top figure, “30” to read “angle”. 69 3-3/Figure 1C SLC 5 Revise top figure, as follows: xzyT. WebT. WebT. WebT. WebInner BTMCargo
29、Tank BTMVerticalSupportsPort Stbd ProfileanglexzPlanC.L.4 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Chapter 3 Structural Design Requirements Section 3 Load Criteria 69 3-3/Figure 1C SLC 5 Repla
30、ce bottom figure, as follows: xzyT. WebT. WebT. WebT. WebInner BTMCargo Tank BTMVerticalSupportsProfilexzPlanC.L.Port Stbd80 3-3/5.9.1 Reference “5C-8-4/12” to read “5C-8-4/28.2”. 82 3-3/5.9.2 In first paragraph, reference “5C-8-4/3.2” to read “5C-8-4/13.2 and 5C-8-4/28.1”. 123 3-3/17.3 In definitio
31、ns of Csand Ch, “FPI Guide” to read “FPI Rules”. (2 places) Chapter 3 Structural Design Requirements Section 4 Initial Scantling Criteria 125 3-4/3.3.1 Reference, “FPI Guide” to read “FPI Rules”. 125 3-4/73.5.1 In definition of Mt, “obtained” to read “described”. 130 3-4/5.7.1 In equation for Wc(f),
32、 the following line, and definition of c, bc1, “bc1” to read “bc1”. (3 places) 133 3-4/7.1.1 In ninth line, reference “3/5.1.1” to read “3-5/5.1.1”. 134 3-4/7.3.1 In definition of f1, “0.40fmax” to read “fmax”. 137 3-4/7.3.2 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 139 3-4/7.5.
33、3 In definition of , reference “3-4/Figure 5” to read “3-4/Figure 3”. 143 3-4/7.7.2 Delete definitions of k3and pgc. 144 3-4/7.7.3 Delete definitions of k3and pgc. 145 3-4/7.7.4 Delete definitions of k3and pgc. 148 3-4/7.9.2 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 157 3-4/9.5.
34、1 In title, delete “(1 September 2012)”. 159 3-4/9.5.1 In second row of table, “Varies linearly between 0.85 * t3and t3” to read “(0.5 + Mr/2) * t3”. 165 3-4/9.7 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 167 3-4/11.3.2 In equation for t2, “k1” to read “k4”. 167 3-4/11.3.2 In def
35、inition of po, reference “3-1/15.11” to read “3-1/3.11”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 5 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Chapter 3 Structural Design Requirements Section 4 Initial Scantling Criteria 168 3-4/11.5.1
36、 In equation for t4, “k1” to read “k4”. 170 3-4/11.7.2 In equation for t3, “k1” to read “k4”. 170 3-4/11.7.2 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 171 3-4/11.9.1 In equation for t4, “k1” to read “k4”. 179 3-4/13.1 In definition of po, reference “3-1/15.11” to read “3-1/3.11”
37、. 180 3-4/13.3 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 182 3-4/13.5 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 184 3-4/13.9 In second equation in definition of fb, “Smfb” to read “Smfy”. 185 3-4/15.3 In equation for t2, “k1” to read “k4”. 186 3-4/15.3 In de
38、finition of po, reference “3-1/15.11” to read “3-1/3.11”. 187 3-4/15.5.1 In equation for t2, “k1” to read “k4”. 187 3-4/15.5.1 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 191 3-4/17.3.2(a) In definition of pis, reference “3-3/11.5.1” to read “3-3/13.5.1”. 193 3-4/17.3.2(b) In defi
39、nition of pis, reference “3-3/11.5.1” to read “3-3/13.5.1”. 194 3-4/17.3.3 In Note, reference “5C-8-17/13” to read “5C-8-17/12”. Chapter 3 Structural Design Requirements Section 5 Total Strength Assessment 197 3-5/3.7.1 Revise to read “The allowable stresses are applicable to plating and longitudina
40、l stiffeners on watertight boundaries of independent cargo tanks. Application of the allowable stress to rod and beam elements is based on axial stress while von-Mises membrane stresses for quadrilateral elements are checked.”. 203 3-5/5.3.3 In equations, “fwLT” to read “fuLT”. Chapter 3 Structural
41、Design Requirements Section 7 Design and Analysis of Other Major Hull Structural Features 224 3-7/1 In second paragraph, reference “Section 3-1-3 of the MODU Rules” to read “Section 3-1-4 of the MODU Rules”. 224 3-7/1 In third paragraph, “FPI Guide” to read “FPI Rules”. (2 places) 228 3-7/9.1.1ii) R
42、evise second paragraph to read, “For local detail FE model analyses (localized highly stressed area, 50 50 mm element size. In no case is the plate element size required to be less than the plate thickness):”. 231 3-7/11.1 In first and second paragraphs, “FPI Guide” to read “FPI Rules”. (2 places) 2
43、31 3-7/11.1 In third and fourth paragraphs, “Facilities Guide” to read “Facilities Rules”. (2 places) 6 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Chapter 3 Structural Design Requirements Append
44、ix 1 Guide for Fatigue Strength Assessment 236 3-A1/Table 1 In figure 2b, taper to read “1” and “3”, as follows: E13TAPER2bChapter 3 Structural Design Requirements Appendix 1 Guide for Fatigue Strength Assessment 238 3-A1/Table 1 In designation F2, figures 3a and 3b to read “2a” and “2b”, respective
45、ly. 250 3-A1/Table 2D In row for wv, FLC6 to read “-0.10”. Chapter 3 Structural Design Requirements Appendix 5 Hull Structural Modeling and Analysis 300 3-A5/11.5.1 In third paragraph, reference “3-5/11.3.5” to read “3-5/3.11”. 309 3-A5/13.7 In first paragraph, “value required target” to read “targe
46、t value required”. 316 3-A5/15.7.2 In definition of Mh-peakreference “3-A5/13.3.3” to read “3-A5/15.3.3”. 316 3-A5/15.7.3 Revise equations to read: iiizendvixynAIMF=)( for vertical bending moment iiiyendhixznAIMF=)( for horizontal bending moment 316 3-A5/15.7.3 In definitions, “Iy” to read “Iz” and
47、“Iz” to read “Iy”, respectively. 317 3-A5/15.7.3 In definitions, “zi” to read “yi” and “yi” to read “zi”, respectively. 317 3-A5/17.1 In second paragraph, “y degree of freedom” to read “z degree of freedom”. 317 3-A5/17.1 In third paragraph, “z degree of freedom” to read “y degree of freedom”. 318 3
48、-A5/Table 2 In ycolumn, “Mv-end” to read “Mh-end”. (2 places) 318 3-A5/Table 2 In zcolumn, “Mh-end” to read “Mv-end”. (2 places) 318 3-A5/Table 2 In Note 2, “z” to read “y”. 318 3-A5/Table 2 In Note 3, “y” to read “z”. 320 3-A5/21.3.1 Reference “3-A5/3.3” to read “3-5/3.3”. 321 3-A5/21.5.1 Reference
49、 “3-5/11.3” to read “3-5/3.9”. Chapter 4 Surveys Section 1 Surveys During Construction, Installation and Commissioning 329 4-1/5.1 In first paragraph, “FPI Guide” to read “FPI Rules”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 7 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Chapter 4 Surveys Section 2 Surveys After Construction and Maintenance of Class 331 4-2/1.1 In second paragraph, reference “1-1-4/9 of the ABS Rules for Conditions of Classification Offshore Units a