ASME STP-NU-057-2013 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE《核设备中高密度聚乙烯(HDPE)管道用美国机械工程师学会(ASME)规范开发路线图》.pdf

上传人:孙刚 文档编号:456921 上传时间:2018-11-24 格式:PDF 页数:33 大小:4.96MB
下载 相关 举报
ASME STP-NU-057-2013 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE《核设备中高密度聚乙烯(HDPE)管道用美国机械工程师学会(ASME)规范开发路线图》.pdf_第1页
第1页 / 共33页
ASME STP-NU-057-2013 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE《核设备中高密度聚乙烯(HDPE)管道用美国机械工程师学会(ASME)规范开发路线图》.pdf_第2页
第2页 / 共33页
ASME STP-NU-057-2013 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE《核设备中高密度聚乙烯(HDPE)管道用美国机械工程师学会(ASME)规范开发路线图》.pdf_第3页
第3页 / 共33页
ASME STP-NU-057-2013 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE《核设备中高密度聚乙烯(HDPE)管道用美国机械工程师学会(ASME)规范开发路线图》.pdf_第4页
第4页 / 共33页
ASME STP-NU-057-2013 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE《核设备中高密度聚乙烯(HDPE)管道用美国机械工程师学会(ASME)规范开发路线图》.pdf_第5页
第5页 / 共33页
亲,该文档总共33页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 STP-NU-057 ASME CODE DEVELOPMENT ROADMAPFOR HOPE PIPE IN NUCLEAR SERVICE Prepared by: Adel N. Haddad A. N. Haddad Plastic Consulting, LLC Ml: STANDARDS TECl-INOLOGY, LLC Date oflssuance: January 31 , 2013 This report was prepared as an accomlt of work sponsored by ASME Nuclear Codes and Standards a

2、nd the ASME Standards Technology, LLC (ASME ST-LLC). Neither ASME, ASME ST-LLC, the author, nor others involved in the preparation or review of this report, nor any of their respective employees, members or persons acting on their behalf, makes any warranty, express or implied, or assumes any legal

3、liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use would not infringe upon privately owned rights. Reference herein to any specific commercial product, process or service by trade name, trad

4、emark, manufacturer or otherwise does not necessarily constitute or imply its endorsement, recommendation or favoring by ASME ST -LLC or others involved in the preparation or review of this report, or any agency thereof. The views and opinions ofthe authors, contTibutors and reviewers of the report

5、expressed herein do not necessarily reflect those of ASME ST -LLC or others involved in the preparation or review of this report, or any agency thereof ASME ST-LLC does not take any position with respect to the validity of any patent rights asserted in connection with any items mentioned in tllis do

6、cument, and does not undertake to insure anyone utilizing a publication against liability for infringement of any applicable Letters Patent, nor assumes any such liability. Users of a publication are expressly advised that determination of the validity of any such patent rights, and the risk of infr

7、ingement of such rights, is entirely their own responsibility. Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as government or industry endorsement of this publication. ASME is the registered trademark ofthe American Society of Mechan

8、ical Engineers. No part of this document may be reproduced in any form, in an electTOnic retrieval system or otherwise, without the prior written permission of the publisher. ASME Standards Technology, LLC Three Park A venue, New York, NY I 0016-5990 ISBN No. 978-0-7918-6871-3 Copyright 20 13 by ASM

9、E Standards Technology, LLC All Rights Reserved ASME JIDPE Roadmap STP-NU-057 TABLE OF CONTENTS Fo:reword . iv Ex.ecutive Summary . v Stakeholders . . vi INTRODUCTION AND ORGANIZATION 1 2 THE HDPE PIPE TECHNOLOGY ROADMAP 2 3 IDENTIFIED R only 13 years after commercial operation. To date, the HDPE pi

10、ping at Catawba Nuclear Station has performed well and has proven to be a cost effective way to address the corrosion issues in the stations service water piping. HOPE piping is durable, requires very low maintenance and has lower overall cost than metallic piping. As a result of the success at Cata

11、wba Nuclear Station, Duke Energy and other utilities have sought to use HDPE piping in buried ASME Section III, Class 3 service water system applications. In 2008, the Nuclear Regulatory Commission (NRC) approved a Relief Request for the AmerenUE Callaway Nuclear Plant for the use of HDPE in buried

12、sections of its essential service water system. The HDPE piping in the Callaway essential service water system has been in operation since late 2008. In 2009, the NRC approved a Relief Request for Catawba Nuclear Station for use of HDPE in buried sections of its nuclear service water system. Section

13、s of the HDPE piping in the Catawba nuclear service water system have been in operation since late 2010. It is the desire of ASME, Utilities, Regulators, the HDPE industry, Architect-Engineer (AE) firms and Constructors to develop a technology roadmap, which will support technology strategy and plan

14、ning goals to achieve safety, reliability, economic and research and development. Achieving a broad acceptance of HOPE pipe for use in water systems at nuclear plants will require collaboration and sponsorship from industry, regulators, government entities, research organizations, domestic and inter

15、national associations and individuals. Established in 1880, the American Society of Mechanical Engineers (ASME) is a professional not for-profit organization with more than 127,000 members promoting the art, science and practice of mechanical and multidisciplinary engineering and allied sciences. AS

16、ME develops codes and standards that enhance public safety, and provides lifelong learning and technical exchange opportunities benefiting the engineering and technology community. Visit www.asme.org for more information. The ASME Standardls Technology, LLC (ASME ST-LLC) is a not-for-profit Limited

17、Liability Company, with ASME as the sole member, formed in 2004 to carry out work related! to newly commercialized technology. The ASME ST-LLC mission includes meeting the needs of industry and government by providing new standards-related products and services, which advance the application of emer

18、ging and newly commercialized science and technology and providing the research and technology development needed to establish and maintain the technical relevance of codes and standards. Visit www.stllc.asme.org for more information. iv ASME JIDPE Roadmap STP-NU-057 EXECUTIVE SUMMARY Existing metal

19、lic piping systems in safety related and non-safety related service water in nuclear power plants are prone to tuberculation, corrosion and leaks, and require replacement, in some instances in less than ten years of service. Non-safety related HDPE piping systems currently installed in nuclear power

20、 plants have proved to be reliable since 1996. Several utility owners have successfully installed HDPE piping. The owners would then seek approval by the Nuclear Regulatory Commission (NRC) through a Relief Request process. The NRC Relief Request process normally requires one year to complete. Devel

21、opment of and NRC approval of ASME Boiler and Pressure Vessel Code rules for use ofHDPE would be very beneficial to all parties in the nuclear power industry. Much research and testing has been undertaken and is continuing in support ofHDPE use for nuclear power piping. The ASME HDPE Roadrnap propos

22、es strategies which will be used to develop appropriate rules to impart science and structure to the HDPE piping application in nuclear service. The Roadmap identifies critical technologies and infrastructure gaps, barriers and opportunities, and recognizes and prioritizes research and development p

23、rograms and new technology needs 1. Among the issues identified for resolution are: piping system design requirements and engineering properties; pipe fusion procedures; fusion integrity analyses and testing procedures development; pipe performance requirements; volumetric examination methods and de

24、termination of acceptable material flaws applicable to U.S. and international standards and procedures. The execution of these strategies requires technical and financial commitment by the nuclear industry operators and suppliers as well as academia and regulators. Immediate financial and technical

25、commitments are needed to execute several of these strategies. HDPE pipe replacement saves money and enhances safety. It is easy to install, it is corrosion free, durable and not subject to fouling. The ASME HDPE Roadmap is the first step toward establishing a disciplined structure toward creating C

26、ode rules to address pressing industrys needs. The next step will focus on follow-up activities dealing with executing current needs, and simultaneously developing future endeavors. v STP-NU-057 ASME HDPE Roadmap STAKEHOLDERS The ASME HDPE Roadmap stakeholders are members of Section Ill Stakeholders

27、 Group. The members are: Richard Barnes-BVP Standards Committee ITI Chairman Gary Park- BPV Standards Committee XI Chairman Steve Lefler* - Duke Energy Stephen Boros - Plastic Pipe Institute Craig Scott* - AREV A Bo Clark - EPRI Tim Lupoid - NRC Frank Schaaf- BPV Standards Committee XI Members with

28、an asterisk (*) next to their name were called on to become members of the Reviewers Team, whose mission was to advise the Roadmap Author and review and edit the Roadmap content. vi ASME JIDPE Roadmap STP-NU-057 1 INTRODUCTION AND ORGANIZATION The objective of the ASME HDPE Roadmap is to develop a s

29、trategy for advancing the rules that will govern the technical aspects of the design, installation, operation and inspection of HDPE piping systems in nuclear power plants. Scientifically and statistically based rules will instill safety and confidence, and these rules are in the best interest of th

30、e nuclear industry, re!:,rulators, the HOPE industry and the general public. The ASME HDPE Roadrnap strategy aims to identify gaps, remove roadblocks, facilitate necessary research and resolve concerns. The Roadmap is intended to lead to the development of Code rules, which can subsequently be endor

31、sed by the regulator (NRC) for generic use and application to facilitate licensing without the need for an application specific Relief Request. The strategies and plans of the ASME HOPE Roadrnap (this document) attempt to identify and characterize the industry and regulators concerns, establish rele

32、vant justifications for desired research, and challenge researchers and providers to deliver solutions 2. The Roadrnap identifies codes and standards related to HDPE piping and may require modification to address HDPE piping applications in nuclear service. This document does not address the process

33、, or Roadmapping. The technology Roadmapping represents a powerful technique to support technological management and planning, especially to explore and communicate dynamic interactions between resources, organizational goals and environment changes 3. The Technology Roadrnapping process provides a

34、way to develop, organize and present information about critical requirements and desirable performance of objectives that must be achieved at the planned time 2. This report is structured as follows: It describes the research and networking leading to the development of the road!map strategies and p

35、lans It identifies major issues of concerns, gaps and roadblocks. It clarifies issues by describing their background and lays out options for technical solutions. The roadmap summarizes and prioritizes research projects deemed important to receive technical solutions. lt displays projects schedule a

36、nd mjlestones in a Gantt style chart and tabulated form. STP-NU-057 ASME HDPE Roadmap 2 THE HOPE PIPE TECHNOLOGY ROADMAP The objective of the ASME HDPE Roadmap is to lead the industry toward achieving its principal goal, which is to advance and increase the use of HDPE piping in nuclear power plants

37、. This can be achieved through the development of Code rules following proposed plans and strategies which will result in a structured and safe application. Proposed plans and strategies will serve as instruments to identify gaps and obstacles, resolve technical issues and forecast and identify rese

38、arch needed to establish an acceptable basis to support the use ofHDPE piping in nuclear plant applications. Several projects to replace worn-out metal pipes and or install new piping systems are underway. The use of HDPE piping in nuclear power plants will promote safety, durab ility and cost savin

39、g in construction and operation. The current practice to license an HDPE piping system in nudear power plants is through an application to the Nuclear Regulatory Commission (NRC) for a Relief Request. This process is complex and time consuming. Instead, ASME has developed this Roadmap which eventual

40、ly will lead to: Researching and fmding solutions to current technical issues. Developing a comprehensive Code that is specific and succinct, and which precludes the need for extensive licensing activities required for NRC acceptance. A questionnaire was developed and e-mailed to survey participants

41、 to collect information about real and perceived gaps and obstacles associated with current and future use of HDPE piping in nuclear water service applications. The composition of the survey participants were mainly members of ASME Section III Working Group on HDPE Research and Development and other

42、 contributors to ASME Sections II, 1X and XI. Additionally, input was requested from several members of the international conununity. Ensuing participant response, the questionnaire was followed by a telephone interview to discuss responders input. The total number of responders was 21 , or 70%, of

43、those invited to participate. The questionnaire or survey identified gaps, roadblocks, technical issues and proposed solutions. The responders provided a wealth of information relating to actual and perceived issues facing the continued success of HDPE piping in nuclear service. Participant input co

44、vered a wide range of subjects concerning applied engineering, product performance, regulatory, financing, etc. The table below summarizes the participant input. 2 ASME JIDPE Roadmap STP-NU-057 Table 1 - Summary of Survey Responses General Category Issues and/or Needs Category 1- Develop a clear pat

45、h to gain acceptance (EPRI TR or Topical Report) NRC 2- Acceptance criteria (Tell us what is acceptable and what is not) 3- Remove real or perceived difficulties and/or risks obtaining NRC approval 4- Clear timetable to develop and resolve NRCs concerns 5- Obtain NRCs concurrence with code requireme

46、nts for use of HDPE piping material so as to avoid the need for a Relief Request 6- Absence of overriding strategy , especially with NRC Regulatory, 1- An approved Code Case that precludes the need for extensive licensing activities Standardization Code Case 2- Place fusing requirements specific to

47、Section Ill or Section II 3- Place general fusing requirements in Section IX 1- Develop standards for tees, reducers. etc 2- Identify existing ASTM and ISO standards which need to consider nuclear applications Standards 3- Develop a standard for carbon black pigment or concentrate 4- Standardization

48、 of JIS, Code of practice and specification 1- Appropriate test method and service life models based o n fundamental knowledge of failure mechanics of PE 4710 resin (piping integrity) 2- Models to evaluate the effect of fusion variables o n thermo-rheological characteristics of PE 4710 during the fu

49、sion process 3- Reliable, repeatable and capable volumetric inspection technology including identified inspection limits and uncertainties (AIIowables) 4- Evaluate joints of pipes, valves, fittings under adverse conditions and transient behavior such as stress, chemicals/chlorine, cold fusion, vibration/earthquake, oxidation, fire/heat excursions 5- Assurance that brittle failure will not occur before piping system life-performance design 6- Develop and establish reliab