DLA MIL-PRF-1 1512 C-2008 ELECTRON TUBE POWER TYPE 7248 [Refer To DLA MIL-STD-1311 C VALID NOTICE 1 DLA MIL-STD-1311 C DLA MIL-STD-1311 B CHG NOTICE 4 DLA MIL-STD-1311 B NOTICE 3 D.pdf

上传人:ownview251 文档编号:691984 上传时间:2018-12-30 格式:PDF 页数:5 大小:71.19KB
下载 相关 举报
DLA MIL-PRF-1 1512 C-2008 ELECTRON TUBE POWER TYPE 7248 [Refer To DLA MIL-STD-1311 C VALID NOTICE 1 DLA MIL-STD-1311 C DLA MIL-STD-1311 B CHG NOTICE 4 DLA MIL-STD-1311 B NOTICE 3 D.pdf_第1页
第1页 / 共5页
DLA MIL-PRF-1 1512 C-2008 ELECTRON TUBE POWER TYPE 7248 [Refer To DLA MIL-STD-1311 C VALID NOTICE 1 DLA MIL-STD-1311 C DLA MIL-STD-1311 B CHG NOTICE 4 DLA MIL-STD-1311 B NOTICE 3 D.pdf_第2页
第2页 / 共5页
DLA MIL-PRF-1 1512 C-2008 ELECTRON TUBE POWER TYPE 7248 [Refer To DLA MIL-STD-1311 C VALID NOTICE 1 DLA MIL-STD-1311 C DLA MIL-STD-1311 B CHG NOTICE 4 DLA MIL-STD-1311 B NOTICE 3 D.pdf_第3页
第3页 / 共5页
DLA MIL-PRF-1 1512 C-2008 ELECTRON TUBE POWER TYPE 7248 [Refer To DLA MIL-STD-1311 C VALID NOTICE 1 DLA MIL-STD-1311 C DLA MIL-STD-1311 B CHG NOTICE 4 DLA MIL-STD-1311 B NOTICE 3 D.pdf_第4页
第4页 / 共5页
DLA MIL-PRF-1 1512 C-2008 ELECTRON TUBE POWER TYPE 7248 [Refer To DLA MIL-STD-1311 C VALID NOTICE 1 DLA MIL-STD-1311 C DLA MIL-STD-1311 B CHG NOTICE 4 DLA MIL-STD-1311 B NOTICE 3 D.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、AMSC N/A FSC 5960 INCH-POUND MIL-PRF-1/1512C 2 December 2008 SUPERSEDING MIL-E-1/1512B (USAF) 29 January 1971 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, POWER TYPE 7248 This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. The requirements for acq

2、uiring the electron tube described herein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: Tetrode See figure 1 Mounting position: See note 2 Weight: 2.5 pounds nominal ABSOLUTE RATINGS: Parameter: Ef Ebb eb Ec1 Ec2 ik Pg1 Pg2 Unit: V kVdc kV Vdc Vdc a W W Oil immersed

3、6.3 5% 125 (See note 1)125 -600 1,500 2.0 10 20 TEST CONDITIONS: 6.3 - - - 1,000 - - - ABSOLUTE RATINGS: Parameter: Pp Glass temp Insulation and cooling T ( coolant) Unit: W C - C Oil immersed 200 150 (minimum) See note 2 75 (See note 5) Air insulation: - 150 See note 3 - Test Conditions : - - See n

4、ote 4 - GENERAL: Qualification Not Required. Inactive for new design after 5 December 1997. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1512C 2TABLE I. Testing and inspection. Limits Inspection MIL-STD-1311 Method Conditions AcceptanceL

5、evel 12/ Symbol Min Max Unit Conformance inspection, part 1 Positive grid drive High-voltage stability Electrode voltage (grid) - - 1261 Ec1 = -150 Vdc; ec1 = 200 v; Ebb = 2,00 Vdc; tp = 160 s (max) prr = 15 (max) (See note 6) Ec2 = Ek =0; Ec1 = -500 Vdc; Ebb = 125 KVdc; Rp = 1.0 Meg (max) t = 30 mi

6、n (max) (See note 7) Ebb = 125 KVdc; Rp = 1.0 Meg (max) Ec1/Ib+20 Adc (See note 8) 0.65 0.65 0.65 ic1 ic2 ib - Ec1 - - 900 - - 140 250 1,570 - - 420 ma ma ma - Vdc Conformance inspection, part 2 Filament current Total grid current 1301 1266 Ef = 6.3 V (See note 4) Ebb = 1,200 Vdc; Ec1/ib = 0.165 Adc

7、 Ic2 = 0.02 Adc (max); t = 5 minutes (see notes 9 and 10) - - If Ic1 10.0 - 13.5 - 50 A AdcQuality conformance inspection, part 3 Peak emission (See note 11) 1231 Ec1 = ec2 = eb = 400 V Ec1 = ec2 = eb = 2400 V - is is 1.5 5.0 3.2 - A A NOTES: 1. When the tube is first installed, or after tube has b

8、een inoperative over a period of time, anode voltage, when first applied, shall be increased gradually from 75 kV to 125 kV, over a 10- minute period, in accordance with the manufacturers recommendations. Warning: Operation of this tube may produce X-ray radiation. Adequate radiation protection shie

9、lding shall therefore be provided. 2. When immersed in oil horizontally, the tube will be cooled by natural convection. When the tube is operated vertically in oil, the re-entrant portion of the cathode end of the tube shall be cooled by forcing oil through the center pin No. 5 of the cathode base b

10、efore and during the application of filament voltage at a minimum flow of 3 pin per minute. For oil insulation, the tube shall be immersed in a high-grade, low-viscosity insulation oil having a dielectric strength not less than 25,000 peak volts/0.1 inch when tested per ASTM test D-877. 3. When the

11、tube is air tested and the tube is in any position, the re-entrant portion of the cathode end of the tube shall be cooled by forcing air thought the center pin No. 5 of the cathode base before and during application of filament voltage at a minimum flow rate of 1-1/2 cfm. 4. All test to be performed

12、 with the tube immersed horizontally in insulating oil as described in note 2. Filament current test may be done in air as described in note 3. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1512C 35. Coolant temperature indicated is avera

13、ge temperature of oil surrounding tube and temperature of incoming oil to cathode when mounted vertically. 6. The positive pulse voltage, ec1, is measured between control grid and cathode. The amplitude of the voltage and current pulses shall be measured approximately at the middle of the pulse. 7.

14、This test may be preceded by an aging period at reduced anode voltage of a duration not exceeding 10 minutes. The tube shall operated during the last 10-minute period with no more than two flashes. Total test time, excluding aging, not to exceed 30 minutes. Flashes shall be interpreted as luminescen

15、ce within the vacuum space of the tube. Fluorescence of the glass surfaces of the tube shall not be considered a flash. Flashes may be counted by an electronic device, operation of which is based on the anode current surge which accompanies the flash. 8. Read Ib at Ec1 = -500 Vdc. Then make Ec1 less

16、 negative to the point where Ib increases by the indicated amount. 9. If impossible to obtain 0.165 ampere anode current without exceeding 0.020 ampere screen current, it shall be permissible to adjust anode voltage until such conditions are obtained provided no rating are exceeded. 10. To be perfor

17、med prior to positive grid drive test. 11. The number of tubes to be tested shall be one percent of each month of each months production, but not less than one nor more then three tubes shall be tested. 12. This specification sheet utilizes an accept on zero defect sampling plan in accordance with M

18、IL-PRF-1, table III. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1512C 4FIGURE 1. Outline drawing of electron tube type 7248. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/15

19、12C 5Dimensions are in inches with metric equivalents (mm) in parentheses Ltr Minimum Maximum Conformance inspection, part 2 A 9.562 (242.87) 9.938 (252.43) B 3.625 (92.08) C 2.625 (66.68) D 3.00 (76.20) 3.063 (77.80) E 1.812 (46.02) 1.936 (49.17) F .625 (15.88) G .969 (24.61) 1.031 (26.19) H 1.188

20、30.18) 1.438 (36.53) J 1.063 (27.00) 1.125 (28.58) K .719 (18.26) .781 (19.84) L .594 (15.09) .656 (16.66) M .370 (9.40) .380 (9.65) N .432 (10.97) .442 (11.23) P 2.490 (63.25) 2.510 (63.75) R 58 62 S 28 32 T 118 122 NOTES: 1. Inlet tube for forced oil or air cooling (.156 inch (3.96 mm) I.D.). 2.

21、Four pins located on circle diameter P. FIGURE 1. Outline drawing of electron tube type 7248. Continued Referenced documents. In addition to MIL-PRF-1, this document references the following: MIL-STD-1311 ASTM-D877 Marginal notations are not used in this revision to identify changes with respect to

22、the previous issue due to the extent of the changes. Custodians: Preparing activity: Air Force 85 DLA- CC DLA- CC Project number (5960-2008-072) Review activities: Air Force 99 NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 5149-1-2014 Refrigerating systems and heat pumps Safety and environmental requirements Definitions classification and selection criteria《制冷系统和热泵 安全和环境要求 定义 分类和选择标准》.pdf BS ISO 5149-1-2014 Refrigerating systems and heat pumps Safety and environmental requirements Definitions classification and selection criteria《制冷系统和热泵 安全和环境要求 定义 分类和选择标准》.pdf
  • BS ISO 5149-2-2014 Refrigerating systems and heat pumps Safety and environmental requirements Design construction testing marking and documentation《制冷系统和热泵 安全和环境要求 设计 建设 试验 标记和文档》.pdf BS ISO 5149-2-2014 Refrigerating systems and heat pumps Safety and environmental requirements Design construction testing marking and documentation《制冷系统和热泵 安全和环境要求 设计 建设 试验 标记和文档》.pdf
  • BS ISO 5149-3-2014 Refrigerating systems and heat pumps Safety and environmental requirements Installation site《制冷系统和热泵 安全和环境要求 安装地点》.pdf BS ISO 5149-3-2014 Refrigerating systems and heat pumps Safety and environmental requirements Installation site《制冷系统和热泵 安全和环境要求 安装地点》.pdf
  • BS ISO 5151-2017 Non-ducted air conditioners and heat pumps Testing and rating for performance《非管道式空调与加热泵 性能试验和评定》.pdf BS ISO 5151-2017 Non-ducted air conditioners and heat pumps Testing and rating for performance《非管道式空调与加热泵 性能试验和评定》.pdf
  • BS ISO 516-1999 Photography - Camera shutters - Timing《摄影技术 摄影机快门 定时》.pdf BS ISO 516-1999 Photography - Camera shutters - Timing《摄影技术 摄影机快门 定时》.pdf
  • BS ISO 5168-2005 Measurement of fluid flow - Procedures for the evaluation of uncertainties《流体流量的测量 不确定度评估程序》.pdf BS ISO 5168-2005 Measurement of fluid flow - Procedures for the evaluation of uncertainties《流体流量的测量 不确定度评估程序》.pdf
  • BS ISO 517-2008 Photography - Apertures and related properties pertaining to photographic lenses - Designations and measurements《摄影术 照相机镜头光圈及其相关性能 标记和测量法》.pdf BS ISO 517-2008 Photography - Apertures and related properties pertaining to photographic lenses - Designations and measurements《摄影术 照相机镜头光圈及其相关性能 标记和测量法》.pdf
  • BS ISO 5208-2015 Industrial valves Pressure testing of metallic valves《工业阀门 金属阀门的压力试验》.pdf BS ISO 5208-2015 Industrial valves Pressure testing of metallic valves《工业阀门 金属阀门的压力试验》.pdf
  • BS ISO 521-2011 Machine chucking reamers with cylindrical shanks and Morse taper shanks《带有圆柱柄和莫尔斯锥柄的机用铰刀》.pdf BS ISO 521-2011 Machine chucking reamers with cylindrical shanks and Morse taper shanks《带有圆柱柄和莫尔斯锥柄的机用铰刀》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1