1、ENGINEERING MATERIAL SPECIFICATIONDate Action Revisions Rev. 02010 01 20 Activated This specification replaces WSS-M1H1016-A2 M.Dumitrescu,NA Printed copies are uncontrolled Copyright 2010, Ford Global Technologies, LLC Page 1 of 2 FABRIC, SPECK S PATTERN, KNIT WSS-M1H1016-B2 MIN 25% PIR CONTENT, TR
2、EATED 1. SCOPEThe material defined by this specification is a SPECK S PATTERN, 4 bars, 28 Gauge, TRICOT knit,body cloth of good quality and uniform composition.2. APPLICATIONThis specification was released originally for material used as an interior trim fabric for 2007 P356, 2011P473 seat bolster .
3、3. REQUIREMENTSIn addition, to the requirements listed herein, the fabric shall meet all requirements ofWSS-M8P18-A1/A4 as applicable.3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (
4、WSS-M99P1111-A). 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +/- 5% tolerance (ASTM D 3887) Wales 126 wales/10 cm Courses 236 courses/10 cm 3.2.2 Fabric Weight, range, g/m2 (FLTM BN 106-01) Laminated * Face w/no Backcoat 453 - 500 320 353 * 3 mm foam thickness3.3 COMPOSITION (ASTM D 629) Tolerance a
5、s specified in WSS-M8P18-A1/A4 Fabric 100% Polyester NOT TO BE USED FOR NEW DESIGN2015 N Status No future usage D. Murtonen, NAENGINEERING MATERIAL SPECIFICATIONWSS-M1H1016-B2 Printed copies are uncontrolled Copyright 2010, Ford Global Technologies, LLC Page 2 of 2 3.4 YARN CONSTRUCTION (ASTM D 1244
6、) Face (A) 11.1 tex (textured polyester yarn) (B) 11.1 tex (textured polyester yarn) Middle 11.1 tex (textured polyester yarn) Back 11.1 tex (100% post industrial yarn) 3.5 METHOD OF DYEING Piece Dye and/or solution dye 3.6 FINISHING OPERATIONS Washing, heat-setting, resin-finish, heat-setting Note:
7、 The fabric is treated with maximum 1% resin to prevent seam appearance issue due to broken filaments. 4. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 4.1 Purchase department will ensure that the material defined in this specification and shipped to any one assembly plant will be produced by one supplier only.