NAVY MIL-R-23098 A (6)-1976 REGULATORS LINE VOLTAGE SINGLE PHASE 400 HERTZ A C NAVAL SHIPBOARD《400赫兹交流海军舰载单相线电压调节剂》.pdf

上传人:testyield361 文档编号:981169 上传时间:2019-03-12 格式:PDF 页数:6 大小:310.17KB
下载 相关 举报
NAVY MIL-R-23098 A (6)-1976 REGULATORS LINE VOLTAGE SINGLE PHASE 400 HERTZ A C NAVAL SHIPBOARD《400赫兹交流海军舰载单相线电压调节剂》.pdf_第1页
第1页 / 共6页
NAVY MIL-R-23098 A (6)-1976 REGULATORS LINE VOLTAGE SINGLE PHASE 400 HERTZ A C NAVAL SHIPBOARD《400赫兹交流海军舰载单相线电压调节剂》.pdf_第2页
第2页 / 共6页
NAVY MIL-R-23098 A (6)-1976 REGULATORS LINE VOLTAGE SINGLE PHASE 400 HERTZ A C NAVAL SHIPBOARD《400赫兹交流海军舰载单相线电压调节剂》.pdf_第3页
第3页 / 共6页
NAVY MIL-R-23098 A (6)-1976 REGULATORS LINE VOLTAGE SINGLE PHASE 400 HERTZ A C NAVAL SHIPBOARD《400赫兹交流海军舰载单相线电压调节剂》.pdf_第4页
第4页 / 共6页
NAVY MIL-R-23098 A (6)-1976 REGULATORS LINE VOLTAGE SINGLE PHASE 400 HERTZ A C NAVAL SHIPBOARD《400赫兹交流海军舰载单相线电压调节剂》.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、This amendmen .MILITARY SPECIFICATION REGULATORS, LINE VOLTAGE, SINGLE PHASE, -400 HERTZ A.C. NAVAL SHIPBOARD fi- +8, line 3: Delete “3.3.8.2 and substitute “3.3.8.3“. 3.3.8.1, items (a) and (b): Delete and substitute: “(a) Single-phase or three-phase wye (4Lwire); 3.5 percent for 150 ampere and 225

2、 ampere regulators; 6 percent for 75 ampere regulators: 6 percent for 20 “(b) Three-phase delta: 6 percent for 150 ampere and 225 ampere regulators: 10 percent for 75 ampere regulators; 10.5 percent for 20 ampere and 40 ampere regulators.“ - ampere and 90 ampere regulators. 3.3.8.2: Delete. 3.3.8.3,

3、 make the following changes: (a) Line 1, heading, after “slope“, add: “(steady-state).“ (b) Line 6, delete8 “both“; delete “and dynamic“. .- (c) Line.7, delete: “and 3.3.8.2“. Page 8 3.3.9, lines 2 and 8: 3.3.11.1, delete and substitute: Delete “35 milliseconds“ and substitute “100 milliseconds“. .“

4、3.3.11.1 KvA efficiency. “3.3.11.1.1 KVA efficiency of each equipment connected in a three-phase four-wire wye system shall be at least 70 percent at any load between 60 percent load and rated full load, at 0.75 lagging and unity power factor. “3.3.11.1.2 KVA efficiency of each equipment connected i

5、n a three-phase delta system shall be at least 60 percent at any load between 60 percent load and rated full load, at 0.75 lagging and unity power factor.“ Page 9 3i5.3, line 1: Delete “A“ and substitute “P. Page 2 of 6 I Provided by IHSNot for ResaleNo reproduction or networking permitted without l

6、icense from IHS-,-,-MIL-R-23098A (b) bL m 999990b 0088804 L MIL-R-2309 8A (SH) AMENDMENT-6 3.5.3.1, lines 1 and 2: Delete and substitute: “3.5.3.1 Cate or F, evaluation and procurement. Category F drawings shall contain the following m under column “3 phase delta“, opposite “Dielectric strength“ del

7、ete “X“ and substitute “-“; make the following changes under-column “3 phase wyel“: Table V, under column “1 phase“; opposite “Dielectric strength“ delete “-“ and substitute I P E !. . Opposite “Input voltage transient“ delete “-“ and siibstitute-“X“. Opposite “Output voltage transient“ delete “-* a

8、nd substitute wXm, Opposite “Output voltage build-up“ delete I-. and substitute “X“. Opposite “Output voltage modulation“ delete O-“ and substitute “Xu. Opposite “Output voltage modulation gain“ delete and substitute “X“. Opposite “No load input excitation current“ delete “-“ and substitute “X“. . O

9、pposite “Slope of no load input excitation current versus input voltage“ - delete “-“ and substitute “X“. Page 3 of 6 I- , Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-h) (i) Opposite “Efficiency“ delete and substitute “X“. -j) Opposite Waveform d

10、istortion“ delete *-“ ana substitute X“. Delete “Inclined operation“, and all references thereto. i;: Page 17 f: _. 4.5.2, line 2: 4.5.5.1, first sentence: Delete “MIL-E-2306“ and substitute “tIIL-E-2036“. Delete and substitute: “Heating tests shall be performed in I - accordance with the operationa

11、l configuration of 3.3.2(a), with line voltage regulators interconnected in a balanced three-phase delta system at 105 percent rated input voltage under conditions of rated full load output line current (balanced) at unity power factor.“ Page 18 P- 14 . Add as paragraph 4.5.6.1: 4.5.6.1 Grou A. When

12、 steady-state voltage regulation tests are performed at test condition Nos. *3 of table VII, in accordance with the group A procedure of 4.5.7.1, a broadband measurement of sound pressure level shall be conducted by means of a microphone positioned at a single point 3 feet in front of the regulator

13、equipment. Instrumentation. used in the performance of broadband measurement of sound pressure level shall Conform to MIL-STD-740. The single point observation of broadband noise shall demonstrate that the equipment does not produce any acoustic noise emission in excess of 65 decibels (db) referred

14、to 0.0002 microbar sound pressure level. noise test in accordance with 4.5.6 shall be conducted .to determine conformance with the requirements of 3.2.3.“ . . In the event that this noise level is exceeded, a Page 19 Table YII: Add the following: I Provided by IHSNot for ResaleNo reproduction or net

15、working permitted without license from IHS-,-,-c r I MIL-R-23098AfSH) AMENDMENT-6 4.5.7.2, item (a) (2): Delete “The equipments shall be adjusted for maximum output Item (a) (3): Delete and substitute: voltage compensation.“ (3) Using the operational configuration specified in 3.3.2(a), output line-

16、to- neutral voltages shall be measured at the regulator terminals under condi- tion Nos. 25, 26 and 27 of table VII.“ Item (a) (4): Delete. Page 20 4.5.8.2, item (a) (2): Delete and substitute: “(2) Equipments shall be operated on a steady-state basis in accordance with test condition Nos. 25, 26 an

17、d 27 of table VII. The equipments shall be subjected to a single phase step increase in load extending from 10 percent load to rated full load on the lightly loaded phase.“ - Item (b), line 1: Delete “4.5.8.2(a)“ and substitute 4.5.8.2ca) (11“; lines 3 and Delete “and step change in load on lightly

18、loaded phase shall extend from 20 percent load 4: to rated full load.“ Page 21 4.5.10.1, second sentence: Delete and substitute: “The harmonic content of the output voltage waveform of the 400 Hz source used to provide powerto the regulator equipment8 - under test shall not exceed the limits specifi

19、ed.below, when the source supplies a resistive load equal to the rating of the line voltage regulators: (a) 3 percent of rated ms voltage, total harmonic distortion. (b) 2 percent of rated rms voltage, for any single armonic component.“ 4.5.11, delete and substitute: * 4.5.11 Phase balance. Equipmen

20、ts shall be connected in three-phase delta, and shall The three-phase delta configuration shall be -be operated in amdamth steady-state condition Nos. 28, 29 and 30 of table VII. Equipment operation shall conform to 3.3.2ta). tested for voltage balance at equipment output terminals. Output line-to-l

21、ine voltages shall be measured to determine conformance with 3.3.3.“ . 4.5.12, lines 5 and 8: Delete *1 to 100 Hz“ and substitute 10 to 100 Hz“. Page 22 4.5.13.1t last line: Delete “3.3.8.2“ and substitute “3.3.8.3“. 4.5.13.3: Delete. 4.5.14: Delete. Page 23 4.5.16, second sentence: Delete and subst

22、itute: “After each 100 hours of operation, the initially impressed load shall be changed in a single step from the 20 percent - EO percent - 80 percent configuration to a balanced rated line current condition.*; line 8, delete “at each step application of single phase load“ and substitute *at each s

23、tep change of load“; line 9, delete “3.3.6 and“; line 12, delete “and 3.3.6“. -I Page .5 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-23078A (6) 61 777770b 0088807 7 W . MIL-R-23098A (SH) AMENDMENT-6 amperes shall be energized and opera

24、ted at 45 percent of rated load during shock test. Equipments of all other ratings shall be energized and operated at rated full load during shock test. “ 4.5.18, item (a), second sentence: Delete and substitute: “Equipntents rated at 225 . Item (a), lines 6 and-7: Delete “Condition Nos. 22 through

25、24“ Page, 24 - 4.5.21, line 4: Delete *MTTRG* and substitute WR*. Page 25 6.1, add as item (g) : (9) Quality assurance requirements (see 4.1.1) .“ Page 27 Add as paragraphs 6.4.29 and 6.4.30: “6.4.29 Primar corrective maintenance. Primary corrective maintenance is that main- tenance performdan as-re

26、quired basis to return an equipment to service in the shortest possible time after a failure or malfunction has occurred. 6.4.30 Secondar corrective maintenance. Secondary corrective maintenance is a .maintenance ac + on, performed independently of primary cor-rective maintenance, which restores a m

27、alfunctioning subassembly, removed from the equipment, to the status of an operating spare NOTE: The margins of this amendment are marked “#“ to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. don as a convenience only and the Governme

28、nt assumes no liability whatsoever or any fn- accuracies in these notations. reauirements of this document based on the entire content irrespective of the marginal Thfa was Bidders and contractors are cautioned to evaluate the - a- notations and relationship to the last previous amendment. Preparing activity: Navy - SH (Project 6110-NZ05) *US. GOVERNMENT PRINTING OFFICE: 1976-603-766/6387 .- Page 6 of 6 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • STAS 13117-1992 Sludges resulting from the surface waters treatment and used waters purding Determination of the chrome conten《地表水处理机污水净化所产生的污泥 铬含量测定 》.pdf STAS 13117-1992 Sludges resulting from the surface waters treatment and used waters purding Determination of the chrome conten《地表水处理机污水净化所产生的污泥 铬含量测定 》.pdf
  • STAS 13119-1992 Power presses with shut bed with simple operation and two cranks Indications on accuracy《带闭床和两个曲柄的简单操作动力压力机 精度指示》.pdf STAS 13119-1992 Power presses with shut bed with simple operation and two cranks Indications on accuracy《带闭床和两个曲柄的简单操作动力压力机 精度指示》.pdf
  • STAS 13120 1-1992 Tractors and machinery for agriculture Wheels General technical《农用拖拉机和机械体系 车轮 一般技术 》.pdf STAS 13120 1-1992 Tractors and machinery for agriculture Wheels General technical《农用拖拉机和机械体系 车轮 一般技术 》.pdf
  • STAS 13120 2-1992 Tractors and machinery for agriculture Wheels Dimensions for hub mounting《枢纽安装的车轮尺寸 》.pdf STAS 13120 2-1992 Tractors and machinery for agriculture Wheels Dimensions for hub mounting《枢纽安装的车轮尺寸 》.pdf
  • STAS 13120 3-1992 Tractors and machinery for agriculture Flat profile deep-well rims Shapes and dimensions《农用拖拉机和机械体系 平剖面深井缘 形状和尺寸 》.pdf STAS 13120 3-1992 Tractors and machinery for agriculture Flat profile deep-well rims Shapes and dimensions《农用拖拉机和机械体系 平剖面深井缘 形状和尺寸 》.pdf
  • STAS 13121-1992 Road vehicles Steering equipments Technical conditions for quality and testing methods《道路车辆 操作设备 质量和测试方法的技术条件》.pdf STAS 13121-1992 Road vehicles Steering equipments Technical conditions for quality and testing methods《道路车辆 操作设备 质量和测试方法的技术条件》.pdf
  • STAS 13123-1992 Electrical seam pressure welding of uncoated and coated low carbon steel sheet Manufacturing requirements and inspection conditions《无涂层和有涂层低碳钢板的电气加压滚焊 制造要求和检验条件 》.pdf STAS 13123-1992 Electrical seam pressure welding of uncoated and coated low carbon steel sheet Manufacturing requirements and inspection conditions《无涂层和有涂层低碳钢板的电气加压滚焊 制造要求和检验条件 》.pdf
  • STAS 13124-1992 Wool Determination of the yellowness degree《羊毛 黄色色调饱和度测定 》.pdf STAS 13124-1992 Wool Determination of the yellowness degree《羊毛 黄色色调饱和度测定 》.pdf
  • STAS 13128-1992 Mining equipment Assembly of sheaves for cylindrical drum- hoisting equipment Main types and dimensuions《采矿设备 圆柱鼓吊装设备滑轮车的安装 主要类型和尺寸》.pdf STAS 13128-1992 Mining equipment Assembly of sheaves for cylindrical drum- hoisting equipment Main types and dimensuions《采矿设备 圆柱鼓吊装设备滑轮车的安装 主要类型和尺寸》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1