1、*USACE / NAVFAC / AFCEC /NASA UFGS-01 33 29.00 20 (August 2013)-Preparing Activity: NAVFAC NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2013*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 33 29.00 20SUSTAINABLE REQUIREMENTS08/13PAR
2、T 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GUIDING PRINCIPLES VALIDATION (GPV)1.3.1 Sustainability Action Plan1.3.2 Responsibilities1.3.3 Calculations1.3.4 Third Party Certification (TPC) Documentation1.3.5 Third Party Certification (TPC)1.4 SUSTAINABLITY SUBMITTALS REQUIREMENTS1.4.1 SUSTAINABILITY
3、NOTEBOOK1.4.1.1 Sustainability Notebook Submittal Schedule1.4.2 HIGH PERFORMANCE SUSTAINABLE BUILDING (HPSB/NSEDRC) CHECKLIST1.4.2.1 HPSB/NSEDRC Checklist Submittal Schedule1.5 DOCUMENTATION REQUIREMENTS1.5.1 Commissioning1.5.2 Energy Efficient Equipment1.5.3 Benchmarking1.5.4 Reduce Volatile Organi
4、c Compounds (VOC)1.5.5 Indoor Air Quality During Construction1.5.6 Recycled Content1.5.7 Bio-Based Products1.5.8 Landfill Disposal1.5.9 Ozone Depleting Substances1.5.10 Validation and Certification RestrictionsPART 2 PRODUCTSPART 3 EXECUTION3.1 SUSTAINABILITY COORDINATION3.1.1 Coordinating Sustainab
5、ility Documentation Progress3.2 SUSTAINABILITY AWARD3.2.1 Third Party Certification Plaque and CertificatesSECTION 01 33 29.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ATTACHMENTS:Attachment 1Attachment 2- End of Section Table of Cont
6、ents -SECTION 01 33 29.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCEC /NASA UFGS-01 33 29.00 20 (August 2013)-Preparing Activity: NAVFAC NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with U
7、MRL dated July 2013*SECTION 01 33 29.00 20SUSTAINABLE REQUIREMENTS08/13*NOTE: This guide specification covers the requirements for providing sustainable documentation for Guiding Principles Validation (GPV), and Third Party Certification (TPC). Use this section for NAVFAC facility projects. This sec
8、tion will be superseded by a unified version.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deletin
9、g, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome an
10、d should be submitted as a Criteria Change Request (CCR).UFGS are intended for design-bid-build contracts; for design-build projects UFGS may require extensive editing by the designer. Navy design-build projects must use NAVFAC Design-Build Master at www.wbdg.org/ndbm.*PART 1 GENERAL1.1 REFERENCES*N
11、OTE: Issue (date) of references included in project specifications need not be more current than provided by the latest guide specification. Use of SpecsIntact automated reference checking is recommended for projects based on older guide SECTION 01 33 29.00 20 Page 3Provided by IHSNot for ResaleNo r
12、eproduction or networking permitted without license from IHS-,-,-specifications.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.U.S. DEPARTMENT OF ENERGY (DOE)ISWG Guiding Princi
13、ples (2008) High Performance and Sustainable Buildings Guidance (http:/www1.eere.energy.gov/femp/program/sustainable_principals.html)U.S. GREEN BUILDING COUNCIL (USGBC)LEED GBDC (2009) LEED Reference Guide for Green Building Design and ConstructionLEED NC (2009) Leadership in Energy and Environmenta
14、l Design(tm) New Construction Rating System1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical editors have designated those i
15、tems that require Government approval, due to their complexity or criticality, with a “G“. Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.For submit
16、tals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for
17、 District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy projects.Submittal items not designated with a “G“ are considered as being for in
18、formation only for Army projects and for Contractor Quality Control approval for Navy projects.*SECTION 01 33 29.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTE: Identify all requirements throughout the technical sections with the ma
19、rking “Guiding Principles and TPC (LEED).“ This will generally be within the submittal requirements of the technical section; however, the products part or the execution part may also require some notation to differentiate those pieces of equipment/products/activities out of many listed that relate
20、to Guiding Principles andLEED. Where additional data is required to validate a Guiding Principle or LEED point (i.e., VOC content of paint), an additional submittal requirement will need to be included in the technical section.*Government approval is required for submittals with a “G“ designation; s
21、ubmittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 0
22、0 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsPreliminary Sustainability Notebook Submittal; GPreliminary High Performance and Sustainable Building ChecklistSD-07 CertificatesThird Party Certification (TPC)SD-11 Closeout SubmittalsFinal Sustainability Notebook Submittal; GFinal High Perform
23、ance and Sustainable Building (HPSB/NSEDRC) Checklist; G*NOTE: Choose bracketed option, “Amended Final Sustainability Notebook Submittal“ for projects that require data and performance information to be collected after the BOD of the facility.Choose bracketed option for “Third Party Certification Pl
24、aque and Certificates“ for TPC projects.* Amended Final Sustainability Notebook Submittal; G Third Party Certification Plaque and Certificates; G1.3 GUIDING PRINCIPLES VALIDATION (GPV)*NOTE: GUIDING PRINCIPLES VALIDATION (GPV) applies to all building projects (vertical construction). SECTION 01 33 2
25、9.00 20 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. Only GUIDING PRINCIPLES VALIDATION is required for the following types of projects:a. Non-energy designated new construction or renovation projects that require a very limited number of
26、 construction trades. Examples include: interior painting, replacing floor material, repairing roofs, or resurfacing parking lot. b. Renovation projects less than $2.5 Million, regardless of Plant Replacement Value (PRV).2. Use paragraphs for ADDITIONAL GUIDING PRINICIPLES VALIDATION for projects th
27、at exceed these requirements. *Provide construction related sustainable documentation to verify achievement of ISWG Guiding Principles Validation (GPV) and completion of High Performance Sustainable Building (HPSB) Checklist. (This is the same checklist called NAVFAC Sustainable Energy Data Record C
28、ard (NSEDRC) items in Attachment 1). Provide the following for GPV:a. A completed HPSB/NSEDRC Checklist, using the HPSB/NSEDRC Checklist at Attachment 1. Further definitions and requirements are provided in paragraph HPSB/NSEDRC CHECKLIST.b. Government approval of any changes to the HPSB/NSEDRC Chec
29、klist from the Contracting Officer at the Preconstruction Conference. Contracting Officers approval establishes identified ISWG Guiding Principles Requirements as the projects sustainability goals.No variations or substitutions to the sustainability requirements are allowed without written consent f
30、rom the Contracting Officer. Immediately bring to the attention of the Contracting Officer any changes that impact meeting the approved ISWG Guiding Principles Requirements for this project and demonstrate that change will not incur additional construction cost or increase the life cycle cost.c. Com
31、pletion of all work required to incorporate the applicable ISWG Guiding Principles Requirements indicated on the HPSB/NSEDRC Checklist and in this contract. d. Provision of construction related documentation to the Contracting Officer who will provide to the Designer of Record (DOR) to maintain an u
32、p-to-date Sustainability Notebook. Supplement construction related documentation containing the following components;(1) HPSB/NSEDRC Checklist (2) Sustainability Action Plan*NOTE: Use the following bracketed items for projects that require ADDITIONAL GUIDING PRINCIPLES VALIDATION.SECTION 01 33 29.00
33、 20 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* (3) Documentation illustrating Guiding Principle Requirements compliance (4) Commissioning Plan and Reports1.3.1 Sustainability Action PlanInclude the following information in the Sustainabi
34、lity Action Plan:a. Contractor confirmation to achieve each construction relate GP requirement.*NOTE: Use the following bracketed paragraphs when ADDITIONAL GUIDING PRINCIPLES DOCUMENTATION is required.* b. For each designated construction related ISWG Guiding Principles Requirements that is not ach
35、ieved, provide narrative explaining how mission, activity, or lack of funded scope for mandatory requirements precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.c. Name and contact information for:
36、Contractors Sustainable POC and other sustainability professional on the Contractors Staff responsible for ensuring sustainability goals are accomplished and documentation is assembled.1.3.2 ResponsibilitiesContractor is responsible for all costs associated with constructing and demonstrating that p
37、roject complies with approved ISWG Guiding Principles Requirements.1.3.3 Calculations*NOTE: Use this paragraph when ADDITIONAL GUIDING PRINCIPLES DOCUMENTATION is required.*Provide calculations, product data, and certifications required in this section to demonstrate compliance with the ISWG Guiding
38、 Principles Requirements.1.3.4 Third Party Certification (TPC) Documentation*NOTE: Use this paragraph when Third Party Certification is required by UFC 1-200-01, “General Building Requirements“ and the Designer of Record registers and certifies the project, with the Contractor providing the construc
39、tion documentation. This is in addition to the GPV.*SECTION 01 33 29.00 20 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*NOTE: On rare occasion that project facility scope is not capable of meeting LEED silver requirement, enter “Certified“
40、in the empty set of brackets, and provide Government with documentation to justify deviation from Silver.*This project has been designed for, and must be constructed to attain a sustainable rating of Silver_ in accordance with LEED GBDC_. Project is already registered with the following TPC Organiza
41、tion: USGBC - LEED _. Provide construction related sustainable documentation, in the format required by the TPC Organization, to the Contracting Officer for approval, and for final approval by the TPC organization.The project has received a USGBC - LEED _ Design Review.Include the following:a. Provi
42、de the Final TPC Checklist that completes the requirements of the TPC Checklist attached to this specification as Attachment 2.b. Approval of the Final TPC Checklist from the Contracting Officer at the Pre-Construction Conference.No variations or substitutions to the sustainability requirements are allowed without written consent from the Contracting Officer. Immediately bring to the attention o