NAVY UFGS-11 53 00-2011 LABORATORY EQUIPMENT AND FUMEHOODS《实验室设备和通风柜》.pdf

上传人:eventdump275 文档编号:984777 上传时间:2019-03-12 格式:PDF 页数:15 大小:65.65KB
下载 相关 举报
NAVY UFGS-11 53 00-2011 LABORATORY EQUIPMENT AND FUMEHOODS《实验室设备和通风柜》.pdf_第1页
第1页 / 共15页
NAVY UFGS-11 53 00-2011 LABORATORY EQUIPMENT AND FUMEHOODS《实验室设备和通风柜》.pdf_第2页
第2页 / 共15页
NAVY UFGS-11 53 00-2011 LABORATORY EQUIPMENT AND FUMEHOODS《实验室设备和通风柜》.pdf_第3页
第3页 / 共15页
NAVY UFGS-11 53 00-2011 LABORATORY EQUIPMENT AND FUMEHOODS《实验室设备和通风柜》.pdf_第4页
第4页 / 共15页
NAVY UFGS-11 53 00-2011 LABORATORY EQUIPMENT AND FUMEHOODS《实验室设备和通风柜》.pdf_第5页
第5页 / 共15页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-11 53 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-11 53 00 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 11 - EQUIPMENTSECTION 11 53 00LABORATORY EQUIPME

2、NT AND FUMEHOODS05/11PART 1 GENERAL1.1 REFERENCES1.2 RELATED WORK SPECIFIED IN OTHER SECTIONS1.3 SUBMITTALS1.4 SUBMITTAL REQUIREMENTS1.4.1 Hood Paint1.4.2 Drawing Requirements1.4.3 Schedule1.4.4 TestsPART 2 PRODUCTS2.1 MATERIALS, COMPONENTS, AND SPECIAL DESIGN REQUIREMENTS2.1.1 Aluminum Alloy2.1.2 C

3、arbon Steel2.1.3 Stainless Steel2.1.4 Safety Glass2.1.5 Casework Components2.1.6 High Efficiency Particulate Air (HEPA) Filter2.1.7 Fumehood Design2.1.8 Hood Static Pressure Loss2.1.9 Electrical Devices2.2 UNITS2.2.1 Unit _, _2.2.1.1 Base Cabinet Portion of Assembly2.2.1.2 Hood Interior2.2.1.3 Sash2

4、.2.2 Fumehood Assembly, Constant Volume2.2.2.1 Base Cabinet Portion of Assembly2.2.2.2 Hood Interior, Including Working Surface2.2.2.3 Sash2.2.2.4 Baffle2.2.2.5 Lighting Fixtures2.2.2.6 Service Fixtures2.2.2.7 Blower SwitchSECTION 11 53 00 Page 1Provided by IHSNot for ResaleNo reproduction or networ

5、king permitted without license from IHS-,-,-2.2.2.8 Duct Stub2.2.3 Radio Isotope Fumehood With Vent2.2.3.1 Base Cabinet Portion of Assembly2.2.3.2 Hood Interior, Including Working Surface2.2.3.3 Sash2.2.3.4 Lead Lining2.2.3.5 Baffle2.2.3.6 Lighting Fixture2.2.3.7 Mirror2.2.3.8 Service Fixtures2.2.3.

6、9 Blower Switch2.2.3.10 Duct Stub2.2.3.11 Replaceable Filter2.2.3.12 Warning System2.2.4 Biological Safety Cabinet2.2.4.1 Glove Panel2.2.4.2 Light Fixtures2.2.4.3 Service Fittings2.2.4.4 Viewing Panel2.2.4.5 Blower Switch2.2.4.6 Duct Stub2.2.4.7 Intake and Exhaust Filters2.2.4.8 Warning SystemPART 3

7、 EXECUTION3.1 INSTALLATION3.2 POSTED OPERATING INSTRUCTIONS3.3 FIELD QUALITY CONTROL3.3.1 Inspection3.3.2 Tests- End of Section Table of Contents -SECTION 11 53 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA

8、UFGS-11 53 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-11 53 00 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 11 53 00LABORATORY EQUIPMENT AND FUMEHOODS05/11*NOTE: This guide specification covers the requirements for

9、 laboratory equipment and fume hoods.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or re

10、vising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should

11、 be submitted as a Criteria Change Request (CCR).*NOTE: Types of equipment normally specified in this section include fumehoods, furniture not specified in casework section, and related laboratory products. Laboratory fumehoods included by the guide specification are not to be utilized for perchlori

12、c acid handling operations. Perchloric acid is extremely dangerous because it is a very strong oxidizer. When this acid reacts with organic material, an explosive product may form.*NOTE: On the drawings, show:1. Location of equipment, utility connections and relation to other work.2. Remotely locate

13、d blower and ductwork, to create negative pressure at hood. Require weatherproof SECTION 11 53 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-caution labels attached to outlet end of exhaust systems where warning of dangerous chemical fumes

14、 will be necessary.3. Fans and ductwork needed to create negative pressure. Laboratory fume hoods are ventilated enclosures designed to provide safe working area for laboratory activities involving hazardous materials, generated fumes, aerosols, gases, and particulate matter. To operate satisfactori

15、ly, air is removed from enclosure at optimum face velocity. Require velocities measurable at maximum face area of hood, with maximum allowances for hood, filter, and appurtenance static pressure losses within specified limits.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the pub

16、lications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Refer

17、ence Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile refer

18、ences in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)ACGIH-2092S (2004) Industrial

19、Ventilation: A Manual of Recommended PracticeASTM INTERNATIONAL (ASTM)ASTM A1008/A1008M (2010) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake HardenedSECTION 11 53 00

20、 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM A167 (1999; R 2009) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and StripASTM B 221 (2008) Standard Specification for Aluminum and Aluminum-Al

21、loy Extruded Bars, Rods, Wire, Profiles, and TubesASTM B 221M (2007) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)ASTM C 1048 (2004) Standard Specification for Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated GlassCENTERS

22、 FOR DISEASE CONTROL AND PREVENTION (CDC)CDC BMBL (1999; Errata) Biosafety in Microbiological and Biomedical Laboratories, 4th EditionNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 45 (2011) Standard on Fire Protection for Laboratories Using ChemicalsNFPA 70 (2011) National Electrical CodeUNDERWRIT

23、ERS LABORATORIES (UL)UL 586 (2009) Standard for High-Efficiency Particulate, Air Filter Units1.2 RELATED WORK SPECIFIED IN OTHER SECTIONSConform to provisions of Section 11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT and Section 12 35 70 MEDICAL AND DENTAL CASEWORK. Provide final uti

24、lity connections and utility service to equipment including waste, under Sections 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS; 22 00 00 PLUMBING SYSTEMS; 22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES; 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS; and 26 20 00 INTERIOR

25、DISTRIBUTION SYSTEM.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” fo

26、llowing a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors SECTION 11 53 00 Page 5Provided by IHSNot for ResaleNo repro

27、duction or networking permitted without license from IHS-,-,-Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tag

28、s may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “R

29、O“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for

30、 submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitt

31、ed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsLaboratory equipment and fume hood layout; G; G, _Laboratory equipment and hood schedulesSD-03 Product DataFumehood assembly; G; G, _Radio isotope fumehood; G; G, _Biological safety cabinet; G; G, _Include descriptive lit

32、erature, technical data sheets, and diagrams.SD-04 SamplesExterior hood paint; G; G, _SD-06 Test ReportsFumehood test; G; G, _Base cabinet test; G; G, _SD-08 Manufacturers InstructionsFumehood assemblySECTION 11 53 00 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without

33、 license from IHS-,-,-Radio isotope fumehoodBiological safety cabinetSD-10 Operation and Maintenance DataFumehood assembly, Data Package 2; G; G, _Radio isotope fumehood, Data Package 2; G; G, _Biological safety cabinet, Data Package 2; G; G, _Submit in accordance with Section 01 78 23 OPERATION AND

34、 MAINTENANCE DATA.1.4 SUBMITTAL REQUIREMENTS1.4.1 Hood PaintSubmit color chips of exterior hood paint. Submit at least five colors which are standard with the manufacturer.1.4.2 Drawing RequirementsShow pertinent installation layout. Indicate details of construction and rough-in requirements.1.4.3 S

35、cheduleInclude each type of equipment and hood and submit in accordance with Section 11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT.1.4.4 TestsSubmit fumehood test and cabinet test reports required by ACGIH-2092S.PART 2 PRODUCTS2.1 MATERIALS, COMPONENTS, AND SPECIAL DESIGN REQUIREMEN

36、TS*NOTE: Use of certain chemicals such as hydrochloric and hydrofluoric acids may react with specified materials. Epoxy, mineral, or synthetic materials for hood interior working area, acid wastes, and drains may be required depending on chemicals to be used. If other materials are required, add tex

37、t.*2.1.1 Aluminum AlloyASTM B 221M ASTM B 221 equivalent in ultimate tensile, yield, and shear strengths to Alloy 6063-T5 or 6063-T6.2.1.2 Carbon SteelASTM A1008/A1008M, cold rolled sheets, commercial bright finish.SECTION 11 53 00 Page 7Provided by IHSNot for ResaleNo reproduction or networking per

38、mitted without license from IHS-,-,-2.1.3 Stainless SteelASTM A167; No 4 satin finish including welds and fabricated surfaces. Provide Type 302, 304, or 316 alloy unless otherwise specified. Provide minimum thickness of 1.5 mm U.S. Standard 16 gage, except 1.8 mm thick 14 gage for working surface.2.

39、1.4 Safety GlassASTM C 1048, fully tempered “FT,“ clear.2.1.5 Casework ComponentsConform with Section 12 35 70 MEDICAL AND DENTAL CASEWORK for base cabinets, counter tops, service fittings and finishes.2.1.6 High Efficiency Particulate Air (HEPA) FilterMeet requirements of UL 586.2.1.7 Fumehood Desi

40、gnDesign, calculate face velocities, and test fume hoods in accordance with ACGIH-2092S, Laboratory fume hoods, auxiliary systems, and associated equipment shall meet the requirements of NFPA 70 and NFPA 45.2.1.8 Hood Static Pressure Loss*NOTE: For determining the system total static pressure loss f

41、or sizing blowers, use the hood maximum static pressure loss when operating at 46 mpm150 fpm face velocity; allow 50 mm 2 inch water gage loss for dirty HEPA filter and 25 mm one inch water gage additional loss for a downstream charcoal filter or a prefilter (or the filter manufacturers recommended

42、resistance at the rated cfm of exhaust air).*With the sash in full-open position the static pressure loss through the fumehood shall not exceed 13 mm 1/2 inch water gage when operating at 23 mpm75 feet per minute (fpm), 22 mm 7/8 inch water gage at 30 mpm 100 fpm, 29 mm 1.125 inch water gage at 38 m

43、pm 125 fpm. For hoods equipped with bypass, the static pressure loss and exhaust volume shall remain relatively constant (within 5 percent) regardless of sash position.2.1.9 Electrical DevicesPrewired at the factory to a common, integral junction box to provide easy exterior connection and disconnection.2.2 UNITS2.2.1 Unit _, _2.2.1.1 Base Cabinet Portion of Assembly_.SECTION 11 53 00 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.1.2 Hood Interior_.2.2.1.3 Sash_

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1