1、“and the Naval Air Engineering Center (NAEC)“ Paragraph 3.6, line 5: Change: “6.5“ to “6.7“ PAGE 5 MI L-P-85856 AMENDMENT 2 18 January 1991 SUPERSEDING INTERIM AMENDMENT 1(AS) 15 OCTOBER 1990 MILITARY SPECIFICATION POWDER MATERIALS FOR FLAME AND PLASMA SPRAYED COATINGS Thls amendment forms a part of
2、 MIL-P-85856, dated 7 December 1988, and is approved for use by all Departments and Agencies of the Department of Defense. PAGE 4 Paragraph 3.6, lines 1 and 2: Delete: Paragraph 4.4: Delete in its entirety and substitute: 4.4 First article inspection. First article inspection shall be conducted and
3、shall consist of the examinations and tests specified In 4.6 (See 6.4). AMSC N/A FSC 3439 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Page 1 of 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Cu s tod i ans : A
4、ir Force - 11 Navy - AS Army - M Preparing Activity: NAVY - AS (Project 3439-0780) Rev i ew act i v i ti es : Air Force - 99, 71 Navy - SH OLA - GS . - _-I_ - MIL-P-85856 (2) 3q = 4779906 0465738 9 ! MI L-P-85856 AMENDMENT 2 PAGE 9 Paragraph 6.4, lines 7 and 8: Delete: by Naval Air Engineering Center, SESD(Code 5314, Lakehurst, NJ 08733-5100“ 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-