UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf

上传人:hopesteam270 文档编号:1067577 上传时间:2019-04-02 格式:PDF 页数:4 大小:17.41KB
下载 相关 举报
UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section  Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf_第1页
第1页 / 共4页
UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section  Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf_第2页
第2页 / 共4页
UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section  Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf_第3页
第3页 / 共4页
UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section  Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULUNDERWRITERS LABORATORIES INC. CERTIFICATION REQUIREMENT DECISIONThis Certification Requirement Decision is prepared and published by Underwriters Laboratories Inc.(UL). It is normative for the a

2、pplicable UL Product Certification Program(s); however, it is currently notpart of the UL Standard(s) referenced below.Product Category (CCN): AMCXStandard Number: UL 1610Edition Date: October 26, 2012Edition Number: 3Section / Paragraph Reference: New 25ASubject: Requirements for Central Supervisor

3、y Station Equipment Central StationBurglar Alarm UnitsDECISION:To address the use of receiver software and consistent with the existing UL 1610 Standards proposal andthe existing requirements of UL 1076, Section 25A , Central Supervisory Station Equipment, the followingrequirement should be applied

4、to UL 1610 receiver equipment utilizing redundant receiver computersystems.NEW 25A Central Supervisory Station Equipment25A.1 This section describes alternate methods for the evaluation of central supervisory station equipmentmeeting the conditions specified in 25A.2. This section does not apply to

5、equipment intended for use atthe protected premise such as control units, intrusion detection units, and the like.25A.2 Receiving equipment meeting all the conditions specified in 25A.2 (a) (m) need not be subjectedto Sections 27 29 and 31-51.a) Data processing equipment and office appliance and bus

6、iness equipment used as centralsupervisory station equipment shall comply with The Standard for Information TechnologyEquipment, UL 60950.b) The manufacturer specifies the minimum system configuration consisting of the following:1) Operating system and revision level.2) Microprocessor type, minimum

7、revision level and minimum clock speed.3) Minimum disk storage.4) Minimum memory requirements.5) Monitoring software revision level.c) A system meeting, but not exceeding the specifications of 25A.2 (b), shall be submitted forcompliance with those tests not specified in this paragraph.d) The install

8、ation instructions shall specify supply line transient protection complying with theStandard for Transient Voltage Surge Suppressors, UL 1449, with a maximum marked rating of330 V.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULe) The installa

9、tion instructions shall specify signal line transient protection complying with theStandard for Protectors for Data Communications and Fire Alarm Circuits, UL 497B, with amaximum marked rating of 50 V.f) The installation instructions shall specify that communication circuits and networkcomponents co

10、nnected to the telecommunications network shall be protected by secondaryprotectors for communication circuits. These protectors shall comply with the Standard forSecondary Protectors For Communications Circuits, UL 497A. These protectors shall be usedonly in the protected side of the telecommunicat

11、ions network.g) The installation instructions shall indicate that equipment be installed in a temperaturecontrolled environment. A temperature controlled environment is defined as one that can bemaintained between 13 35C (55 95F) by the HVAC system. Twenty-four hours of standbypower shall be provide

12、d for the HVAC system. The standby power system for the HVAC systemmay be supplied by an engine driven generator alone. A standby battery is not required to beused.h) All receiving equipment shall be completely duplicated with provision for switchover to thebackup system within 30 seconds. The backu

13、p system shall be fully operational within 6minutes of the loss of the primary system. This allows 30 seconds for the backup system to befully energized and connected to necessary communication lines and other devices, followed by5-1/2 minutes for the system to boot up, conduct memory tests, file sy

14、stem check, securityverifications and prepare for full system operation. The backup computer shall have equivalentor greater capabilities of the primary, such as memory, speed and the like.i) Failure of the main computer system, hard disk, and alarm monitor shall result in switchoverto the backup sy

15、stem and shall be indicated by an audible or obvious visual indication.j) The installation instructions shall specify that a fault tolerant system may be used in lieu ofcomplete duplication of the system if every component in the fault tolerant system, including thesoftware and the power supply, is

16、duplicated.k) The installation instructions shall specify that in addition to the main power supply andsecondary power supply that are required to be provided at the central supervisory station, thesystem shall be provided with an uninterruptable power supply (UPS) with sufficient capacity tooperate

17、 the computer equipment for a minimum of 15 minutes. If more than 15 minutes isrequired for the secondary power supply to supply the UPS input power, the UPS shall becapable of providing input power for at least that amount of time.l) The installation instructions shall specify that the UPS shall co

18、mply with the Standard forUninterruptable Power Supply Equipment, UL 1778, or the Standard for Fire ProtectiveSignaling Devices, UL 1481.m) The installation instructions shall specify that in order to perform maintenance and repairservice, a means for disconnecting the input to the UPS while maintai

19、ning continuity of power tothe automation system shall be provided.In addition, the following definitions apply:STANDARD NUMBER: UL 1610 -2-UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNEW 3.13 COMPUTER SYSTEM, FAULT TOLERANT A computer sys

20、tem containing multiple powersupplies, disk drives, processors, and controllers each backing up and checking on the process of others.In the event of a component failure, the other modules take over the function performed by the failedcomponents without affecting the operation of the computer. In ad

21、dition to the duplicating hardware, afault-tolerant system includes the necessary software to make the system operational.NEW 3.14 COMPUTER SYSTEM, REDUNDANT Two computer systems maintained at a centralstation, either of which can quickly be connected and operational for handling alarm signals in th

22、e eventthat the other computer fails to operate. See 3.13 for the definition of a fault-tolerant computer system. Afault tolerant computer system is considered to be redundant.NEW 3.15 SOFTWARE Instructions that are temporarily or permanently stored in the computersmemory and used to provide functio

23、n and control of the computers components.NEW 3.16 SYSTEM DATABASE Information entered into the computer by authorized personnelincluding items such as, but not limited to, names, addresses, telephone numbers, security information forsystem users, graphics and the like.RATIONALE FOR DECISION:Since t

24、he above was publicly proposed through CSDS, is currently out for public comment, and has beenimplemented as the technical basis for a new / innovative projects preliminary investigation, it isanticipated that the direction will be accepted and processed for publication through CSDS and publishedas

25、part of ANSI / UL 1610.Copyright 2010 Underwriters Laboratories Inc.UL, in performing its functions in accordance with its objectives, does not guarantee or warrant thecorrectness of Certification Requirement Decisions it may issue or that they will be recognized or adoptedby anyone. Certification R

26、equirement Decisions are the opinion of Underwriters Laboratories Inc. inpractically applying the requirements of the standard. They do not represent formal interpretations of thestandard under American National Standards Institute (ANSI) processes. UL shall not be responsible toanyone for the use o

27、f or reliance upon Certification Requirement Decisions by anyone. UL shall not incurany obligation or liability for damages, including consequential damages, arising out of or in connectionwith the use or reliance upon Certification Requirement Decisions. The electronic version of theCertification R

28、equirement Decision is the current version and previously printed copies may be outdated.This document is published as a service to ULs certification customersSTANDARD NUMBER: UL 1610 -3-UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULSTANDARD NUMBER: UL 1610 -4-No Text on This Page

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1