The employment of TTCN-3 for testing the Application Server .ppt

上传人:proposalcash356 文档编号:373255 上传时间:2018-10-05 格式:PPT 页数:28 大小:1.22MB
下载 相关 举报
The employment of TTCN-3 for testing the Application Server .ppt_第1页
第1页 / 共28页
The employment of TTCN-3 for testing the Application Server .ppt_第2页
第2页 / 共28页
The employment of TTCN-3 for testing the Application Server .ppt_第3页
第3页 / 共28页
The employment of TTCN-3 for testing the Application Server .ppt_第4页
第4页 / 共28页
The employment of TTCN-3 for testing the Application Server .ppt_第5页
第5页 / 共28页
亲,该文档总共28页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、The employment of TTCN-3 for testing the Application Server in the IMS network.,Damian Zolich, TTCN-3 User Conference 2011 Ericpol Telecom Sp. z o.o. 7 9 June 2011 - Bled, Slovenia Tel.: +48 663 426 716,Agenda,Introduction Step 1 Without TTCN-3 Step 2 New test environment with TTCN-3 Step 3 Make te

2、sting easy Step 4 Our future,Our environment in numbers,About 7000 test cases Up to 80 components in one test case About 45 users 930 files 1,5 million code lines Support for 7 different protocols 11 interfaces,Step 1 Without TTCN-3,Only one protocol (SIP) Very basic scenarios Simple environment Sim

3、ple matching mechanism,Simple environment,New challenges,New traffic generator (H.248) More and more complex scenarios New protocols in the near future More and more pressure on matching mechanism,?,Second protocol,Test team problems,Preparation for the test execution Exchanging information between

4、traffic generators No flexibility Poor matching mechanism Code reuse Message synchronisation Verification of correct message sequence Timers,Solution,We need something completely different. So lets try TTCN-3,Step 2 New test environment with TTCN-3,Ro (online charging) Rf (offline charging),IMS AS,M

5、GW,P-CSCF,S-CSCF,I-CSCF,HSS,MGCF,CSCF,PSTN/PLMN,other SIP network,CSCF,SIP,SIP,SIP,Charging,Diameter,MRFP,H.248,Provisioning,LDAP,Voice & Video mail,SIP,Cx,CM,PM,Muta,ISC,LDAP,Mp,Audio & Video Announcements Audio & Video Conference,SBG,SIP,SIP NNI or H.323,Sh,Diameter/TCP,SLF,Dh,Diameter/TCP,CAI3G/X

6、CAP,Dx,Px App,Px,MRFC,Mr,SIP,New challenges,Test environment which enables: Simulation of nodes around the Application Server Support of all required interfaces Support of all required protocols Support of advance matching mechanism Coordination between interfaces,Function Test Environment,Sh (Diame

7、ter),Rf (Diameter),MP (H.248),Dh (Diameter),MTAS,ISC (SIP),Ro (Diameter),TTCN-3,CAI3G/ Ut (XCAP),Muta (LDAP),Basic call setup vs. Test simulation,Primary CCF,New test team problems,Testing is time consuming Development of test cases difficult to learn Lots of code to write for one test case Test exe

8、cution quite complex,Solution,We need a good testFramework and Automation,Step 3 Make testing easy,TTCN-3 function library & API Creation and initialization of test components, routing ofmessages and verification of message contentTest automation scripts Run before and after the TC call flow. Ensure

9、s test environment integrity and checks for problems caused by TC execution.,Directory Structure,Messages exchange on ports between the SUT and the Framework components (defaults used),5060 ISC1,SIP_DISPATCHER_CT,5061 ISC2,CSCF (SIP dispatcher),Framework component overview,Non-Session,Dispatchers us

10、es list of keys to differientiate sessions,Non-Session,Sip caller and callee are together a SIP session,Framework benefits,Higher abstraction level for writing TCs More readable/understandable test cases written in a consistent style Complex and extensive common verification details are handled tran

11、sparently and automatically Simplifies TC maintenance and development New checks can be added automatically to existing TCs via the framework,Framework benefits,Majority of TCs automated Full automated regression test Flexibility in test case creation User friendly,Examples of automated test activit

12、ies,Pre execution activity: cleaning environment checking environment run external applications (e.g. wireshark) Post execution activity collecting all logs into one archive file monitor for hanging processes, memory leaks & system crashes,Step 4 Our future,Environment very flexible to test new features required by customers Smart way of regression testing More testing in shorter time,Damian Zolich, TTCN-3 User Conference 2011 Ericpol Telecom Sp. z o.o. 7 9 June 2011 - Bled, Slovenia Tel.: +48 663 426 716,Thank you,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 教学课件 > 大学教育

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1